The issue of the nature of the contract turned ultimately on the veracity of Pang versus that of Lin. I was satisfied on the balance of probabilities that Pang’s version of events was the truthful one. His evidence of the phone conversation that took place was detailed in his AEIC, and was also consistent with his responses during cross-examination by the plaintiff’s counsel. On the other hand, Lin appeared to have little recollection of the conversation, and had failed to advance in his AEIC the position that he took on cross-examination, namely that he could not have told Pang what was alleged since the plaintiff had been contemplating redevelopment of the Shophouse and not merely internal renovation. This omission in Lin’s AEIC was particularly glaring since the phone conversation was specifically pleaded in the Defence, and was central to the issue for determination. I also noted that the plaintiff provided no corroborating evidence that it had already formed the intention to redevelop the Shophouse by constructing an extension block at the time the quotation was obtained, whereas Pang’s evidence was somewhat corroborated by the low quotation price of $2,800. By way of contrast, the first defendant’s quotation for the Purvis Street project was for $19,000, although I recognised that the two surveys were different in nature, in that the Purvis Street survey was a post-construction survey for purposes of a contemplated strata sub-division application rather than a topographical and measurement survey.