Regulation 13

of Building Control (Buildability and Productivity) Regulations 2011

Regulation 13

Submission of record plans

Amended byS 819/2019 wef 15/12/2019S 819/2019 wef 15/12/2019S 729/2014 wef 01/11/2014S 335/2022 wef 30/04/2022S 522/2013 wef 01/09/2013S 729/2014 wef 01/11/2014S 729/2014 wef 01/11/2014S 729/2014 wef 01/11/2014S 819/2019 wef 15/12/2019S 335/2022 wef 30/04/2022S 819/2019 wef 15/12/2019S 819/2019 wef 15/12/2019

Subregulation 1

Amended byS 819/2019 wef 15/12/2019

On completion of the building works, the developer must, at the time mentioned in paragraph (1A), submit the following to the Commissioner of Building Control:

(a)

where the plans of the building works do not contain any alternative solution — the buildable design score of the building works as completed (called in this regulation the record plans of buildable design score);

(b)

where the plans of the building works contain any alternative solution — the record plans of the Deemed Acceptable Proposal or Project Productivity Improvement Plan (as the case may be) for the building works as completed.

Subregulation 1A

Amended byS 819/2019 wef 15/12/2019

The time for the submission of the documents mentioned in paragraph (1) is —

(a)

at the time of application for a temporary occupation permit in respect of the building works; or

(b)

in a case where no application is made for a temporary occupation permit, at the time of application for a certificate of statutory completion in respect of the building works.

Subregulation 2

Amended byS 729/2014 wef 01/11/2014S 335/2022 wef 30/04/2022S 522/2013 wef 01/09/2013S 729/2014 wef 01/11/2014S 729/2014 wef 01/11/2014S 729/2014 wef 01/11/2014S 819/2019 wef 15/12/2019

The submission of the record plans of buildable design score referred to in paragraph (1)(a) shall —

(a)

bear an endorsement by every specified person in respect of the building works that the record plans of buildable design score of the building works is not less than the minimum buildable design score referred to in regulation 4(2) or (3), as the case may be;

(aa)be accompanied by the buildability detailed design and implementation plan of the building works as completed; (ab)where regulation 4B(2) applies, be accompanied by a manufacturer’s manual —

(i)

which relates to the prefabricated bathroom units that are incorporated in the building, or the component of the building that is a residential (non‑landed) building; and

(ii)

which contains the information specified in the Code of Practice relating to prefabricated bathroom units; and

(b)

be accompanied by such documents as the Commissioner of Building Control may determine.

Subregulation 3

Amended byS 335/2022 wef 30/04/2022S 819/2019 wef 15/12/2019S 819/2019 wef 15/12/2019

The submission of the record plans of the Deemed Acceptable Proposal or Project Productivity Improvement Plan referred to in paragraph (1)(b) must —

(a)

bear an endorsement by every specified person in respect of the building works that the record plans of the Deemed Acceptable Proposal or Project Productivity Improvement Plan meet the requirements of the deemed acceptable solution or the requirements of the open solution, as the case may be; and

(b)

be accompanied by such documents as the Commissioner of Building Control may determine.