Skip to content

Singapore legislation

Regulation 13

of Building Control (Fixed Installations) Regulations 2025

Regulation 13

Return of disapproved or withdrawn plans

Subregulation 1

If any plans of fixed installation works have been disapproved, the Commissioner of Building Control may return the disapproved plans to the relevant plan submission QP.

Subregulation 2

If any plans have been withdrawn by the plan submission QP or developer before or after approval, the Commissioner of Building Control may return the plans to the plan submission QP or developer, as the case may be.

Subregulation 3

If —

(a)

the Commissioner of Building Control has notified a plan submission QP or developer to collect any plans (whether on paper or in electronic form) that are to be returned under paragraph (1) or (2); and (b)the plans are not collected within one month after the date of the notice,the Commissioner of Building Control may destroy or dispose of the plans (including the medium in which they are stored) in any way that he or she thinks fit.