Regulation 17
Regulation 17
Preparation of plans for approval
All plans or amended plans of fixed installation works accompanying any application for approval of the plans under regulation 9(1) or 14(2) must —
be prepared and signed by a plan submission QP;
be produced in a clear and intelligible manner;
bear a title block in such format as the Commissioner of Building Control may specify together with a project title on the right side of the plan;
be fully annotated and use suitable notations and symbols to show or distinguish the different types of materials and components to be used in the fixed installation works;
bear a full description or generic name of any specification of materials and components given or shown on the plans;
demarcate clearly the new fixed installation works from the existing building by suitable markings;
delineate clearly the fixed installation works to be deleted, demolished or removed by suitable markings;
be numbered serially where the first plan is numbered as 1 of n and the last plan as n of n (n being the total number of pages of the relevant plans);
set out fixed installation works the design or installation of which complies with the objectives and performance requirements set out in the Third Schedule; and
comply with any other requirements that the Commissioner of Building Control may specify.