Skip to content

Singapore legislation

Regulation 15

of Building Control (Temporary Buildings) Regulations 2018

Regulation 15

No refund of fees

There is no refund of any fees paid to the Commissioner of Building Control in respect of a permit under these Regulations in the case where —

(a)

the application is withdrawn at any time or refused;

(b)

the preliminary approval or the permit has lapsed or has been revoked; (c)the building works authorised by the preliminary approval were not carried out or were not completed; or

(d)

the temporary building is not used for the entire period specified in the permit.