Environmental Protection and Management (Control of Noise At Construction Sites) Regulations

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
Subsidiary Legislation
Status
In force
Enacted
1999
Sections
6

Quick answer

About this subsidiary legislation

Environmental Protection and Management (Control of Noise At Construction Sites) Regulations is Singapore Subsidiary Legislation, cited as Subsidiary Legislation EPMA-RG2 1999, currently marked in force and first recorded in 1999.

Regulation 1

Citation

Open as pageSuggest a correction

These Regulations may be cited as the Environmental Protection and Management (Control of Noise at Construction Sites) Regulations.

Regulation 2

Definitions

Open as pageSuggest a correction
Amended byS 484/2011 wef 01/09/2011

In these Regulations, unless the context otherwise requires —“construction site” means any premises on or in which works of the following description are being carried out:

(a)

the erection, construction, alteration, repair or maintenance of buildings, structures or roads;

(b)

the breaking up, opening or boring under any road or adjacent land in connection with the construction, inspection, maintenance or removal of works;

(c)

piling, demolition or dredging works; or

(d)

any other work of engineering construction;“construction work” means works of any description listed in the definition of “construction site” and any other related works, including the loading or unloading of materials from cranes or vehicles for the purposes of such works;“public holiday” has the same meaning as in the Holidays Act (Cap. 126);“residential building” includes any building which is used solely or partly as a hostel, hotel, serviced apartment, residence or private dwelling.

Definition

“construction site” means any premises on or in which works of the following description are being carried out:

(a)

the erection, construction, alteration, repair or maintenance of buildings, structures or roads;

(b)

the breaking up, opening or boring under any road or adjacent land in connection with the construction, inspection, maintenance or removal of works;

(c)

piling, demolition or dredging works; or

(d)

any other work of engineering construction;

Suggest a correction

Definition

“construction work” means works of any description listed in the definition of “construction site” and any other related works, including the loading or unloading of materials from cranes or vehicles for the purposes of such works;

Suggest a correction

Definition

“public holiday” has the same meaning as in the Holidays Act (Cap. 126);

Suggest a correction

Definition

“residential building” includes any building which is used solely or partly as a hostel, hotel, serviced apartment, residence or private dwelling.

Amended byS 484/2011 wef 01/09/2011
Suggest a correction

Regulation 3

Permissible noise level

Open as pageSuggest a correction
Amended byS 484/2011 wef 01/09/2011

Subregulation 1

Suggest a correction

The owner or occupier of any construction site shall ensure that the level of noise emitted from his construction site does not exceed —

(a)

in the case of any construction work which has commenced before 1st October 2007, the maximum permissible noise levels set out in the First Schedule; and

(b)

in the case of any construction work commencing on or after 1st October 2007, the maximum permissible noise levels set out in the Second Schedule.

Subregulation 2

Suggest a correction

Notwithstanding paragraph (1), the Director-General may, if satisfied that there is justifiable technical reason to do so in any particular case, by notice in writing require the owner or occupier of the construction site —

(a)

to ensure that the level of noise emitted from his construction site does not exceed such other maximum permissible noise levels as the Director-General may specify; and

(b)

to comply with such other terms and conditions as the Director-General may think fit to impose.

Subregulation 3

Suggest a correction

For the purposes of paragraph (1), noise level readings shall be taken —

(a)

one metre away from the outside of any affected building regardless of the distance between the affected building and the boundary of the construction site; or

(b)

if a suitable location cannot be found one metre away from the outside of any affected building, at such other location as the Director-General may specify.

Subregulation 4

Suggest a correction

If there are other sources of noise affecting the measurement of the level of noise emitted from a construction site, the maximum permissible noise levels set out in the First and Second Schedules shall be adjusted in accordance with the Third Schedule and the adjusted value shall be taken as the maximum permissible noise level.

Subregulation 5

Suggest a correction

Paragraph (b) of Parts I and II of the Second Schedule shall not apply to any construction site in which the following works are carried out:

(a)

repair and maintenance work to public roads; and

(b)

repair work to any sewer, drain, water, gas or electricity line.

Subregulation 6

Suggest a correction
Amended byS 484/2011 wef 01/09/2011

For the purposes of these Regulations, construction work shall be deemed to have commenced on the date specified in a permit to carry out structural works in that construction site granted by the Commissioner of Building Control under the Building Control Act (Cap. 29).

Regulation 4

Equipment to measure and record noise level to be set up

Open as pageSuggest a correction

The Director-General may, by notice in writing, require the owner or occupier of any construction site —

(a)

to set up equipment to measure and record the level of noise emitted from his construction site over such duration as may be directed by the Director-General; and

(b)

to submit the records of the noise level readings, including all relevant facts which may influence the values of the noise level readings.

Regulation 4A

Prohibition of construction work at certain sites during certain periods

Open as pageSuggest a correction
Amended byS 484/2011 wef 01/09/2011

Subregulation 1

Suggest a correction

The owner or occupier of any construction site located less than 150 metres from any hospital, home for the aged sick or residential building shall ensure that no construction work is carried out at his construction site on the days and during the times specified in the Fourth Schedule.

Subregulation 2

Suggest a correction

Notwithstanding paragraph (1), the Director-General may, if he is satisfied that it is necessary in the public interest or for justifiable technical reason to do so in any particular case, permit in writing any construction work to be carried out during a prohibited period specified in the Fourth Schedule.

Subregulation 3

Suggest a correction

A permit granted under paragraph (2) shall specify the period during which the construction work may be carried out and shall require the owner or occupier of the construction site to comply with such other terms and conditions as the Director-General may think fit to impose.

Subregulation 4

Suggest a correction
Amended byS 484/2011 wef 01/09/2011

For the avoidance of doubt, regulation 3 applies to any construction work permitted to be carried out pursuant to a permit granted under paragraph (2).

Regulation 5

Penalty

Open as pageSuggest a correction
Amended byS 484/2011 wef 01/09/2011

Any person who fails to comply with regulation 3(1) or 4A(1), or any notice issued by the Director-General under regulation 3(2) or 4, or any term or condition of a permit granted under regulation 4A(2), shall be guilty of an offence and shall be liable on conviction to a fine not exceeding $40,000 and, in the case of a continuing offence, to a further fine not exceeding $1,000 for every day or part thereof during which the offence continues after conviction.

Common questions

What is Environmental Protection and Management (Control of Noise At Construction Sites) Regulations?
Environmental Protection and Management (Control of Noise At Construction Sites) Regulations is Singapore Subsidiary Legislation, cited as Subsidiary Legislation EPMA-RG2 1999, currently marked in force and first recorded in 1999.
Is Environmental Protection and Management (Control of Noise At Construction Sites) Regulations still in force?
Yes — Environmental Protection and Management (Control of Noise At Construction Sites) Regulations is currently in force.
When did Environmental Protection and Management (Control of Noise At Construction Sites) Regulations take effect?
Environmental Protection and Management (Control of Noise At Construction Sites) Regulations was first recorded in 1999.
How many regulations does Environmental Protection and Management (Control of Noise At Construction Sites) Regulations have?
Environmental Protection and Management (Control of Noise At Construction Sites) Regulations contains 6 regulations.
Where can I read the official version of Environmental Protection and Management (Control of Noise At Construction Sites) Regulations?
The official text of Environmental Protection and Management (Control of Noise At Construction Sites) Regulations is published at sso.agc.gov.sg.