Singapore legislation

Regulation 2

of Electricity (Taser Power Pte. Ltd. — Exemption from Section 6(1)) Order 2022

Regulation 2

Exemption

Subregulation 1

Section 6(1)(b) of the Act does not apply to Taser Power Pte. Ltd. (called in this paragraph TPP) in respect of its transmission of electricity under the following conditions:

(a)

the electricity is generated by TPP’s generating unit in Lot 5160V in Mukim No. 7 at 92 Tuas South Avenue 3, Singapore 637368; (b)the electricity is transmitted to and consumed by the cooling water pumps 1 and 2 on the premises of the Public Utilities Board in Lot 5159T in Mukim No. 7 at 92 Tuas South Avenue 3, Singapore 637368;

(c)

the cooling water pumps 1 and 2 convey sea water to TPP’s generating unit mentioned in sub‑paragraph (a) for the purpose of cooling the generating unit;

(d)

TPP is a generation licensee;

(e)

TPP complies with any direction given by the Authority under section 17 of the Act in respect of the transmission of electricity.

Subregulation 2

In this paragraph, “Public Utilities Board” means the Public Utilities Board continued under section 3 of the Public Utilities Act 2001.