High Court · Decided 29 December 2006
Compact Metal Industries Ltd v PPG Industries (Singapore) Ltd
Feedback & support[2006] SGHC 242 · Case no. Suit 442/2005
✱ What happened, in plain English
There is no plain-English summary of this judgment yet.
Ask about this judgment →Grounds of decision
Official text from eLitigation
Sundaresh Menon JC
- [1]
[1] The parties to this action were both involved in the project to refurbish the Monetary Authority of Singapore Building (the “MAS Building”) and the material events took place in 2004. The main contractor for that project was Taisei Corporation (“Taisei”). A company known as Façade Master Pte Ltd (“Façade”) was appointed as the nominated sub-contractor for the supply and installation of the external cladding. Façade is a subsidiary of the plaintiff, Compact Metal Industries Ltd. Façade appointed the plaintiff to undertake the paint application work in respect of the aluminium panels to be used in the cladding. The plaintiff in turn engaged another of its subsidiaries, Compact Metal Industries Sdn Bhd (“Compact Malaysia”) to actually carry out this work. The paint was to be supplied by the defendant, PPG Industries (Singapore) Pte Ltd. However, this was not an ordinary paint. It was a customised paint that was not featured in the defendant’s standard colour charts. It emerged during the course of the trial that the composition of the paint that was initially supplied was unique and had not previously been used. The defendant would only sell paints such as this to those it had approved as applicators. Compact Malaysia had been such an approved applicator since 1999 although from 10 October 2002 to 30 October 2004 when most of the relevant events in this case took place, that status was in fact held by the plaintiff. However, nothing turned on this.
- [2]
[2] As it transpired, considerable difficulties were encountered in achieving an acceptably consistent finish with the paint that was initially supplied by the defendant. This resulted in the parties seeking the approval of the architect to change the formulation of the paint and this was secured later in 2004. Even then, it was only after some more months of trial, error and adjustment that a satisfactory quality was achieved. The central question in this case is who should bear the responsibility for the loss and damage that was sustained as a result of this. The answer to that question, depends first upon what the relevant terms of the contract are, and second upon what the cause of the problem was.
Preliminary observations
- [3]
[3] The matter was heard before me over 13 days with a total of seven witnesses giving evidence. Before analysing the evidence, I think it is appropriate here to make some observations about the length of time taken with the evidence in the case. The number and range of the factual issues in the case were not such as to inevitably require so many hearing dates. Unfortunately, it did and in my judgment, this was at least in part contributed to by the manner in which the affidavits of the evidence-in-chief were presented. This was applicable to both parties but perhaps especially so in relation to the affidavits filed on behalf of the defendant. In general, the affidavits included at least some of the following:
(a) arguments and submissions;
(b) inferences drawn by the witness, the difficulty this posed being compounded where the witness failed to make clear that he was straying from giving direct evidence of what he knew into drawing conclusions or inferences;
(c) statements that were based on belief or information rather than based on the witness’s own knowledge and often without identifying the sources of such information and belief; and
(d) statements or conclusions which were purportedly supported by the exhibits but which were not always so upon a closer examination.
- [4]
[4] There is much to commend the practice of having the evidence-in-chief of a witness adduced by way of affidavits as mandated by Order 38 r 2 of the Rules of Court (Cap 322, R 5, 2006 Rev Ed) (“the Rules”). However, it is vital to keep in mind that the affidavits of evidence-in-chief for use in a trial are quite different from affidavits that are filed for use in interlocutory proceedings. In respect of the latter, O 41 r 5(2) provides that an affidavit sworn for the purpose of being used in interlocutory proceedings may contain statements of information and belief. This is not the case in relation to affidavits of evidence-in-chief and O 38 r 2(5) sets out the important rule that nothing in O 38 r 2 is to render admissible, any evidence which if given orally would be inadmissible.
- [5]
[5] I can do no better than to cite the following passage from the work of one of our leading commentators on matters of civil procedure, Prof Jeffrey Pinsler. In Singapore Court Practice 2006 (Jeffrey Pinsler gen. ed.) (Lexis Nexis 2006) at para 38/2/7, the learned commentator states as follows:
The facts and the evidence
The witnesses
- [7]
[7] I turn to consider the facts and the evidence in this case. I heard evidence from four witnesses on behalf of the plaintiff. These were:
(a) Mr Eric Lo (“Mr Lo”) who was a director of Façade. He was quite actively involved in the project and was one of the senior figures on the plaintiff’s side.
(b) Mr Ling King Hwa (“Mr Ling”) who was the factory manager of Compact Malaysia’s plant. Mr Ling was directly involved in the efforts to control the application of the paint once the problems surfaced.
(c) Mr Tan Hua Joo (“Mr Tan”) who was an executive director of the plaintiff. His evidence related primarily to quantum issues. I had earlier directed that matters of quantum and liability be bifurcated. Accordingly, in the proceedings before me, only issues of liability were addressed.
(d) Mr Philip Kwang (“Mr Kwang”) who was the chief executive officer of Façade. Mr Kwang dealt principally with the management of the problem when it emerged that a satisfactory finish was not being achieved.
- [8]
[8] I also heard evidence from three witnesses of fact and one witness who was tendered as an expert on behalf of the defendant. These were:
(a) Mr Timothy Choong (“Mr Choong”) who was the sales manager of the defendant’s Malaysian associate company, PPG Coatings (M) Sdn Bhd (“PPG Malaysia”) which was the entity that actually formulated and supplied the paint. Mr Choong’s evidence related primarily to recounting some of the efforts made by the defendant to assist in the management of the problem.
(b) Mr Tajoruddin bin Mohd Jalil (“Mr Tajoruddin”) who was a technical officer employed by the defendant but working with PPG Malaysia. His evidence recounted some of the background to the selection of the paint in question and the defendant’s efforts to formulate this. He also was involved in various trials conducted at PPG Malaysia’s plant. He also gave evidence on the development of the reformulated paint in the later part of 2004.
(c) Mr Ong Gee Ou (“Mr Ong”) who was the defendant’s sales manager. Mr Ong was the principal witness on the defendant’s side who was involved at most stages of the project and his evidence covered most issues.
(d) Mr Seah Chin Hin (“Mr Seah”) who gave evidence as an expert witness. Mr Seah described himself as a paint manufacturing and coatings specialist who provided business and consultancy services to the coatings industry. The essence of Mr Seah’s evidence concerned some of the difficulties in working with paint of the sort in question because of its properties, as well as his understanding of deficiencies in the method of application by Compact Malaysia as derived from records that were provided to him by the defendant.
- [9]
[9] In the course of this judgment, I comment specifically on aspects of the evidence of each of these witnesses as appropriate. I found the witnesses generally to be truthful and attempting to the best of their ability to aid the court’s understanding of the events, save that I had some particular reservations over the evidence of Mr Ong and Mr Seah. Inevitably, the evidence of every witness may demonstrate areas of weaknesses. This is often a function simply of imperfect recall characteristic of all human beings. In such cases, the court assesses all the available evidence on a particular issue in the light of facts and documents that are objectively shown to be true and then makes a finding on that issue. In such a case, the rejection of a particular witness’s evidence on a given issue signifies nothing more.
- [10]
[10] In relation to the evidence of Mr Ong and Mr Seah however, I did have some difficulties, although for quite different reasons. Dealing first with Mr Seah, Mr Michael Por, who appeared for the plaintiff, took issue with whether Mr Seah could even properly qualify as an expert given his admittedly limited experience in dealing with the sort of paint that was in question in this case. The following extract from Mr Por’s cross-examination of Mr Seah is instructive:
- [11]
[11] Mr Por also took issue with Mr Seah’s evidence because his opinions were based on documents and information given to him but some of which were not identified or annexed to his report and had not been produced to the plaintiff in discovery. Mr Por noted that Mr Seah was not aware even of the size of the aluminium flakes used in the paint that was initially supplied in terms of whether it was large or small or medium flakes because that information was not included in the literature provided to Mr Seah by the defendant. Yet, as will become apparent in the course of this judgment, that was one of the critical factual elements of the case.
- [12]
[12] Mr Por noted that Mr Seah was unaware what the recommended type of solvent was for the sort of paints in question in these proceedings; or even that some of the reports he had studied were based on trials that involved the reformulated paint rather than that initially supplied; or what the difference between the two formulations was in terms of whether coarse or fine flakes of aluminium had been used. The following extract from Mr Seah’s evidence captures some of these points:
- [13]
[13] In my judgment, there was substance in each of these points that Mr Por took. Mr Seah’s opinions were based not on his experience working with paints of the nature in question in this case. Rather, his opinions were those of one with some degree of experience in the coatings industry, who reviewed papers and documents supplied to him by the defendant. Taken together with his lack of knowledge of some of the quite basic facts, it left me with the impression that his evidence, even if admissible, was of very little weight.
- [14]
[14] The position with Mr Ong was quite different. Plainly, he had knowledge on many of the issues in the case. However, I found he tended to be evasive at times and on some occasions, I formed the impression that his evidence was derived not from a recollection of what had transpired but rather appeared to me to be rationalised and to be what he thought would serve the defendant’s case. My general impression of Mr Ong as a witness was unfavourable to that extent.
- [15]
[15] With those general observations, I turn now to the key facts.
The initial selection of the paint
- [16]
[16] The original paint that had been selected by the architect and that was supplied by the defendant had the code UCM-40019-XLBC. This is referred to in this judgment as “the Original Paint”. There were certain features of that paint that bear highlighting. It was a metallic paint but unusually, the aluminium flakes that gave the paint its metallic properties were entirely coarse flakes. These were larger particles of aluminium.
- [17]
[17] It was not disputed that the architect had selected the Original Paint. Mr Narayanan noted in his closing submissions, that this was a customised colour made particularly for the MAS Building project and that it contained exclusively coarse aluminium flakes in order to enhance the paint’s sparkling effect when applied on the aluminium panels. What was unclear however, was the detailed background to how the paint in question came to be selected. It was evident that at the early stages of the project, Façade had submitted some colour samples to the architect and Taisei but the Original Paint was not among those samples. The witnesses who gave evidence on behalf of the plaintiff were all unaware of just what had transpired which led to the architect selecting the Original Paint.
- [18]
[18] Although Mr Lo in his affidavit evidence stated that Façade was given to understand by Taisei that the defendant had submitted the colour sample for the Original Paint to the architect and “promoted this colour” to the architect, there was in fact no direct (or admissible) evidence to this effect.
- [19]
[19] Mr Ong confirmed that the defendant also had submitted some colour samples to the architect from as early as October 2002. However, the Original Paint was not among those the defendant submitted. According to Mr Ong, about a year later, the defendant was requested by a number of paint applicators to supply wet samples of paint which they could spray on to aluminium panels for submission to Façade. The defendant accordingly supplied a number of such samples including at least one which had emanated first from another company known as Rotol Singapore Pte Ltd (“Rotol”).
- [20]
[20] Mr Ong testified that Rotol later informed the defendant that a colour proposed by Rotol had been selected. However, Rotol was principally an applicator and given the size of the prospective order, Rotol gave the defendant the formulation for the selected colour and requested the defendant to produce the paint. There were some differences in the shades and tints achieved because of differences in some of the components used by the defendant as opposed to those used by Rotol. As a result, a number of adjustments were needed before the formulation of Original Paint was finalised by the defendant.
- [21]
[21] I accept this part of Mr Ong’s evidence. I am satisfied that the plaintiff were not themselves involved in the formulation of the Original Paint. However, I am also satisfied that there was no evidence to bear out the allegation that the defendants had “promoted” this paint to the architect.
- [22]
[22] Facade was informed by Taisei that it was to acquire the Original Paint from the defendant and to use this to prepare some mock-ups. The mock-ups were duly prepared and were approved sometime after March 2004. The plaintiff was then instructed to procure the Original Paint and apply it and the first purchase order for the Original Paint was issued to the defendant on or about 7 April 2004.
The emergence of the problem
- [23]
[23] Sometime in June 2004, the first batch of panels had been coated by Compact Malaysia using the Original Paint. When these were installed on the site, it became apparent that there were certain problems with the appearance of the panels. This was described before me as one of inconsistency in the colour tones. There were a number of aspects to this. First, it appeared that the installed panels appeared to be of a different tone to the samples that had earlier been provided and approved by the architect. Further, it appeared that there were subtle differences as between the panels so that two panels placed adjacently might appear somewhat different. In addition, within a given panel, there appeared to be differences in the tones with the areas along the sides of the panel seemingly brighter than the area in the centre.
- [24]
[24] The installed panels were rejected by the architect and Taisei and this was the start of the dispute.
- [25]
[25] It was not challenged by either party that the panels which had been installed and then rejected were unacceptable. The dispute centered only on what had caused the problem. Initially, attention was focused on possible deficiencies in the plaintiff’s application line but subsequently the suggestion was that the problem was inherent in the paint.
- [26]
[26] Between June 2004 and early September 2004, various investigations were conducted in an effort to find the cause of and a solution to the problem. In the course of these investigations, the defendant produced a number of reports which, Mr Por contended, contained a number of material admissions that the source of the problem was inherent in the paint.
- [27]
[27] The defendant variously maintained that these reports had been prepared under duress or pressure from the plaintiff including in particular Mr Kwang; and that the reports were prepared as part of a joint effort to persuade the architect to approve a change of paint; and further that the real reason this was done was to help the plaintiff overcome deficiencies in the application line at Compact Malaysia’s factory. According to the defendant:
(a) metallic paints are somewhat difficult to apply to begin with;
(b) this was compounded because of the tint of the paint in this case, namely red, as well as the fact that the particular metallic properties of the Original Paint had been obtained by the exclusive use of large or coarse aluminium flakes; and
(c) these difficulties could have been managed or overcome with a properly functioning application line and with proper techniques.
- [28]
[28] The plaintiff denied any suggestion of coercion or duress. They did not take issue with the suggestion that metallic paints do require special care in application. However, their principal contentions were that:
(a) they were not aware the Original Paint used only large or coarse aluminium flakes for the metallic properties. Nor were they aware that this could give rise to the sort of problems that were eventually encountered; and
(b) whether or not there were deficiencies on the application line, the inherent nature of the Original Paint was such that for practical purposes an acceptably consistent finish could not be achieved.
The investigations that were conducted
- [29]
[29] I should first make one observation. The plaintiff did not call an expert to opine on the cause of the problem. The defendant did call Mr Seah but as I have noted above, I did not find his evidence to be of particular help. When I questioned Mr Por, he explained that as far as the plaintiff was concerned, it was not necessary for them to adduce any expert evidence given the admissions that they considered had been made by the defendant. The plaintiff was certainly entitled to take that position but it did mean there was a limitation on the material available to me.
- [30]
[30] I now turn to the reports and trials. As I have alluded to above, a number of these were carried out after the problem surfaced and the panels had been taken down and analysed. Some of the reports also concerned observations at Compact Malaysia’s application line. I do not propose to analyse each of the reports and trials in detail save to the extent it is necessary to do so in order to arrive at my findings and conclusions.
- [31]
[31] The first report was prepared by Mr Ong on 28 June 2004 and it identified as one of the possible causes of the problems the fact that because of the metallic nature of the paint, the orientation of the aluminium flakes might be such that the colour might appear to vary from different angles. It was not clear if Mr Ong was referring to apparent colour variances between different panels or within a given panel. The presence of the aluminium flakes, it eventually emerged, did contribute to the problem although the suggested explanation contained in the first report did not reveal a full understanding of the precise cause.
- [32]
[32] The matter was discussed at a meeting the next day between representatives from both sides including Mr Lo and Mr Ong. An email was sent after that meeting setting out what transpired. However, it appeared to have been sent to the wrong address and according to Mr Ong, he never received it. There are two points of interest in that email which I think are of some importance. The first is the observation that whereas the panels appeared fine when viewed at eye-level, inconsistent tonality, especially at the sides of each panel which appeared brighter, became apparent when the panels were examined from an angle. Thus a panel which appeared to be consistently toned at eye-level could appear patchy and inconsistent when installed at a height and viewed from the ground.
- [33]
[33] The second point of interest is that the email records that Mr Ong did check the coating process and the quality control procedures and found these to be in order. Mr Ong confirmed his agreement with this when he was cross-examined.
- [34]
[34] A few days later, on 2 July 2004, Mr Ong forwarded to Mr Ling a report prepared by one Mr Fu Raosheng (“Mr Fu”), who was described as the technical services manager for South East Asia from the group of companies of which the defendant was part. Before this was issued to the plaintiff, Mr Fu’s report had been circulated in draft among a number of the defendant’s staff. It is apparent from the contemporaneous exchanges that the defendant’s own personnel (including Mr Ong) were somewhat unclear as to the cause and various possibilities were being examined.
- [35]
[35] Mr Fu was not called as a witness but the report he signed (and which was sent by Mr Ong to Mr Ling) noted the following points among others:
(a) the Original Paint was a special aluminium pigment using coarse and sparkling aluminium flakes;
(b) this gave rise to a strong side view effect caused by the “high scattering” of the coarse flakes as a result of which the colour appeared different when viewed from an angle;
(c) using electrostatic spraying, the distribution of the aluminium pigments would be varied. This was caused by the uneven electric field of a panel with the edges having a strong electrical field. This tended to attract the aluminium flakes which accumulated along the sides.
- [36]
[36] The consequence of this, according to Mr Fu’s report, was that the area of the panel along sides would appear different from the rest of the panel when viewed from an angle. There is no doubt that variances within a panel were seen as potentially serious – a point made by Mr Ong in his email of 29 June 2004 to his colleagues. Mr Fu’s report noted that efforts would continue to be directed at investigating the root cause of the problem and how to solve it. The process of investigation therefore continued.
- [37]
[37] A further meeting was held on 28 July 2004. A set of minutes was kept of that meeting and sent to Mr Ong who responded with only minor comments. Being a contemporaneous documents seen by both parties at that time, it offers a reasonably good picture of what was discussed at that time. The meeting reviewed tests and investigations that had been done and it was apparent that:
(a) Various theories were being explored including the possible effects of differences in the thickness of the applied paint on particular panels; the need to increase the colour coat; the possible effect of air temperature and humidity at different times of the day; and the type of solvent use.
(b) One of the defendant’s representatives, a Mr Lee, who was not called as a witness and was described by Mr Choong as one of the defendant’s technical personnel, commented that colour consistency could be achieved by changing the ratio of coarse and fine aluminium flakes. However, Mr Lee noted that this may cause the colour to appear darker because of the reduction of coarse flakes.
(c) The defendant’s representatives confirmed that Compact Malaysia’s application methods and process was in full accordance with the defendant’s guidelines and was closely monitored by the defendant’s technicians.
(d) The defendant still could not “conclusively identify” what the cause of the problem was. The defendant’s representatives thought it was likely to be a combination of the extra metallic flake content together with the number of coats required and the nature of the colour.
(e) The defendant’s representatives further noted that if the number of coats and the amount of metallic flakes were reduced, so too would the problem with inconsistency.
- [38]
[38] It is evident from this that the idea that the solution to the problem might be found in changing the ratio of coarse and fine aluminium flakes emanated from the defendant. As will become apparent, this in fact was what happened eventually when the approval of the architect was obtained to revise the formulation of the paint by introducing some fine aluminium flakes. Mr Choong under cross-examination suggested that this was done to cater for limitations or deficiencies in Compact Malaysia’s application line which made it impossible for it to achieve the desired consistency. In my judgment, this is wrong and I reject it. As is evident from the minutes in question, although some mention was made of variance in thickness this was never put forward as the cause of the problem. Nor was it put forward that the key to solving the problem lay in Compact Malaysia improving or enhancing its application line.
- [39]
[39] On the contrary, at that meeting, the defendant’s representatives did accept that Compact Malaysia’ application was in full accordance with the defendant’s guidelines and that this had been monitored by them. Mr Ong under cross-examination accepted that the defendant had not taken issue with these minutes save in one respect which is not presently material.
- [40]
[40] Over the next several days, various trials were carried out at least some of which involved the application of the Original Paint at Compact Malaysia’s plant. There is no denying that the reports prepared during and after these trials reflect some shortcomings in the application. On the other hand, there is also no denying that these reports show that despite the direct involvement of the defendant’s personnel including Mr Tajoruddin who prepared a number of the reports and who assisted in the trials that it was not possible to achieve a consistent finish. In some cases, the overall quality was improved but there remained patchiness and inconsistency.
- [41]
[41] Mr Nicholas Narayanan, who appeared for the defendant, submitted that in the course of these trials, the defendant’s representatives were in fact assisting the plaintiff by helping to resolve application deficiencies. In my judgment, this is not correct. It is also irrelevant.
- [42]
[42] It is not correct because the context in which matters had got to this stage was that investigations were being conducted to establish the “root cause” of the problem. Plainly, there was a problem with inconsistency. The indications up to this stage suggested that the problem stemmed inter alia from the nature of the aluminium flakes used in the formulation of the Original Paint. It is true that the possibility of deficiencies in the application line had not been excluded at this stage. But that is as far as Mr Narayanan could have taken it.
- [43]
[43] In any case, it is irrelevant because clearly, one of the principal objectives of the trials and investigations, was to establish if an acceptable and consistent finish could be achieved without having to change the formulation of the paint. In that context, even if the plaintiff’s representatives were assisting with the resolution of any deficiencies in the application line, the question ultimately was whether, with their supervision, it was possible to achieve an acceptable finish. Moreover, the impression I was left with from Mr Tajoruddin’s evidence was that the deficiencies he personally found and was aware of were not so significant as to be insurmountable.
- [44]
[44] Mr Tajoruddin also testified that from his experience, if the paint had been formulated with fine aluminium flakes, there would not have been such a problem. However, he stated that this was not something he knew until after the problem had surfaced because this had been the first time he had worked with a paint of this colour using only coarse aluminium flakes. He thought it was this combination of colour and metallic composition that was at the root of the problem.
- [45]
[45] Significantly, Mr Tajoruddin disclosed under cross-examination that by late July 2004, he had been instructed to develop a revised formulation of the paint by incorporating fine flakes. He realised that this would help overcome the problem and his superior officers had asked him to try this. It emerged from his evidence that the Original Paint was in fact only tested on the Compact Malaysia line on one day at the end of July 2004. Subsequently, all tests were done using a revised formulation.
- [46]
[46] In the course of the evidence given by Mr Kwang under cross-examination, he testified that a meeting had taken place on 4 August 2004 at which a consensus was reached that the problem was caused by the “inherent quality” of the paint. According to Mr Kwang, he could not remember who coined the expression but it was understood to mean that the problem lay with the paint rather than with the application. According to Mr Kwang, it was suggested that the root cause of the problem was identified in the fact that the metallic properties of the Original Paint stemmed from the exclusive use of coarse flakes. Mr Narayanan challenged the credibility of this evidence because no reference to it had been made anywhere in the affidavits of evidence-in-chief.
- [47]
[47] I do not regard this as being of great importance simply because it was already apparent from the events that had taken place until then, and from the meeting of 28 July 2004 that the indications pointed towards the problem stemming from the composition of the paint. It would therefore not have been surprising if this was reiterated at a meeting between the parties when Mr Kwang himself got more closely involved. Further, I note that there is a reference in the contemporaneous documents to such a meeting having been held and to Mr Kwang having asked what the real cause of the problem was. It is stated there that the defendant responded that it was probably because of the thickness of the coating due to the large particle diameter of the metallic flakes. I refer further to this letter at [57] below.
- [48]
[48] On 5 August 2004, Mr Lee Thiam Soon, the technical manager with PPG Malaysia issued a report which contained the following points:
(a) the problem with inconsistency applied both within a given panel as well as between panels;
(b) some changes were suggested and the defendant assigned two personnel to supervise spraying at Compact Malaysia. Following this, better results were achieved but inconsistency remained;
(c) although there was some improvement, the problem had not been solved, and the defendant would propose a formula incorporating fine flakes.
- [49]
[49] There is then the following concluding paragraph:
- [50]
[50] The defendant’s principal complaint is that this language was not in the original draft report and that it was put in at least in part under the influence or at the instigation of Mr Kwang.
- [51]
[51] The same complaint is made in relation to another report issued by Mr Lee on 9 August 2004 which contains the following statements:
- [52]
[52] It is indeed evident from the documents and from the emails exchanged at that time that these two reports were shaped to some degree by representations made by the plaintiff’s representatives, in particular Mr Kwang. It is evident from earlier drafts of both these documents that the defendant was looking to express a view that was less robust in finding any deficiency inherent in the paint and more open to the possibility that there might be issues with the application. It is also evident that the plaintiff was facing pressure from Taisei.
- [53]
[53] This is to be balanced against the evidence, on the other hand, of Mr Tajoruddin that I have referred to at [45] above as well as from the contemporaneous documents which establish that by this stage, the defendant had experimented with a formulation using some proportion of fine flakes and found this produced a better finish. In my judgment, after observing the trials on the Compact Malaysia application line, the defendant’s representatives had seen that the difficulties were such that achieving a finish of acceptable consistency was not something that could readily be achieved simply by measures being taken at the application line.
- [54]
[54] The challenge, in the circumstances, was securing the architect’s agreement to accepting a revised formulation which might result in a more consistent finish though perhaps with some compromise on colour or degree of sparkle. In my judgment, this was seen as the practical solution by both the plaintiff and the defendant. I am satisfied that Mr Kwang was trying to get a united position put across to the architect to this end. Under cross-examination, Mr Kwang testified that this effort, in part, developed as a result of an email he received from Taisei urging that a united front be presented if the architect were to be persuaded.
- [55]
[55] Having considered the totality of the evidence including Mr Kwang’s and the plaintiff’s efforts to influence the way these reports were framed, I do not consider that any of this detracts from the acceptance reflected there that the only practical solution was to change the formulation.
- [56]
[56] This was also reflected in a further report issued by Mr Lee on 16 August 2004 where it was noted as follows:
- [57]
[57] This too, was written following representations from the plaintiff but there is nothing to suggest that it was not true. Furthermore, on 20 August 2004, Mr Matsuo Inagaki (“Mr Inagaki”), also a technical manager with PPG Malaysia, in a communication to Taisei, directly made the following observations:
(a) The problem was unforeseeable and it was caused by the material used;
(b) This particular formulation had never been used previously;
(c) The application could not be done any better to achieve sufficient consistency;
(d) The only solution was to use a revised formulation which included fine flakes; and
(e) Technically, it was not possible to solve the problem without changing the formulation.
- [58]
[58] Mr Choong under cross-examination accepted that he was made aware of what Mr Inagaki proposed to set out in his email to Taisei. He further confirmed that he did not have any issue to take with the contents of this note.
- [59]
[59] Similarly, Mr Ong was taken under cross-examination to the various reports. He confirmed inter alia:
(a) that he agreed with the contents of Mr Fu’s report of 2 July 2004;
(b) that he agreed with the contents of Mr Lee’s report of 5 August 2004. He further accepted that Mr Lee had concluded after the trials on the site that the desired consistency could not be achieved even with stricter control of the line and that the solution was to revise the formulation by including fine flakes;
(c) that he agreed with the contents of Mr Lee’s report of 9 August 2004 including, the portions added following Mr Kwang’s suggestion (see [116] below); and
(d) that he agreed with the contents of the whole of Mr Lee’s report of 16 August 2004 (see [116] below).
- [60]
[60] In those circumstances, the whole question of the alleged pressure brought to bear by Mr Kwang or Mr Ong becomes irrelevant because Mr Ong was quite prepared to and did accept that he stood by the contents of these documents.
- [61]
[61] In my judgment, it had become apparent from the various tests that it was not possible using Original Paint to achieve a finish of acceptable consistency and I so find. The defendant suspected this from early July and by the end of that month had started testing a revised formulation.
The new paint
- [62]
[62] Following a number of meetings and submissions to the architect, sometime towards the end of September 2004, the architect’s approval was obtained to change the formulation. The new paint bore the code UCM-40023-XLBC. It included a proportion of fine aluminium flakes. I refer to this as “the New Paint”. It was not in dispute that a number of trials had to be done on the application line with the New Paint. These continued until mid-November 2004.
- [63]
[63] It was not in dispute that the New Paint was to be mixed and supplied in a single batch so that there would be no variation from one batch to the next. This was specifically mentioned when approval was given to change the formulation of the paint. Some 7300 litres were to be supplied on this basis.
- [64]
[64] Several complaints were raised by the plaintiff in relation to the New Paint. These were as follows:
(a) that the defendant breached the requirement to produce the paint in a single batch and some colour variation problems persisted initially;
(b) that the defendant had used old ingredients some of which had exceeded the permitted shelf life in formulating the New Paint;
(c) the defendant was testing and ascertaining the proper line parameters to enable consistency to be achieved in mass production. This included experimenting with the appropriate solvent;
(d) in the face of continuing difficulties with achieving consistency, Compact Malaysia developed its own parameters and by mid-November 2004, it was able to achieve consistent finishes; and
(e) episodic instances of paint having to be rejected on account of colour differences continued after November 2004.
- [65]
[65] It is apparent from the contemporaneous documents as well as from the evidence led before me that even after the architect had approved the use of the New Paint in late September 2004, problems continued for some time as efforts were undertaken to achieve a consistent finish. In relation to what caused this, various points were explored in the evidence.
- [66]
[66] Mr Por did examine Mr Tajoruddin on the suggestion that some of the ingredients used exceeded the permitted shelf life of two years. However, this evidence was at best inconclusive. Mr Tajoruddin himself explained that ingredients could be and had been used by him even where the permitted shelf life had been exceeded. The ability to do so without compromising quality depended upon such variables as storage conditions and would be subject to a quality control check being done before use. There was nothing in the evidence before me to show that any such ingredients were in fact of such a condition as to be unusable or that the use of these materials in fact caused the difficulties with the initial attempts to achieve a consistent finish. Indeed, the fact that the plaintiff was able eventually to achieve an acceptable finish suggests the opposite. I therefore disregard this.
- [67]
[67] However, Mr Por’s other complaints had rather more substance. It was not in dispute that the New Paint was to be produced in a single batch. In fact, according to the defendant because of the quantity being ordered they had to use two tanks. In an attempt to meet the single batch requirement, the defendant had the two tanks connected by a pump with the intention that the paint should be stirred and circulated through the two tanks to achieve a homogenous finish. From documents produced by the defendant in the course of discovery, it became apparent that internally at least, the defendant’s representatives were aware that this was not an optimal solution because of the risk that the flow rate and mixture in each of the tanks might not be identical. This was not disclosed to the plaintiff at the time approval was being sought (and obtained) for the reformulation of the paint.
- [68]
[68] Under cross-examination, Mr Choong accepted that, in substance, the defendant had not complied with the single batch requirement. When a colour variance problem was identified in early December 2004, it was suggested by the defendant’s representative that this had been caused by a possible fault in the pump. Mr Tajoruddin on his part seemed to suggest that the pump might not in fact have broken down but his evidence on this was not entirely clear. In any case, what did emerge from the evidence of Mr Choong and the defendant’s internal documents was that there were practical problems with achieving a consistent homogenous colour if the paint was produced in two tanks even using a pump to circulate the paint between the two tanks, and where the pump was faulty the difficulties were inevitably aggravated. In my judgment, the defendant did fail to produce the paint in a single batch and this did at least contribute to the difficulties initially encountered with the New Paint.
- [69]
[69] More importantly, it was clear from the evidence, in particular that given by Mr Tajoruddin, that the initial trials that were conducted by the defendant’s representatives used a solvent that was wetter and hence dried differently than that recommended by the technical guidelines issued by PPG Industries Inc in the United States. It was further established that sometime in November, the plaintiff departed from the recommendations of the defendant and used a drier solvent which was more in line with the technical guidelines issued by PPG Industries Inc and this then enabled them to establish better and more consistent results.
- [70]
[70] I have already noted that the idea of using a revised formulation which included fine aluminium flakes to overcome the problem faced with the use of the Original Paint emanated from the defendant. In my judgment, it was apparent from the evidence and the contemporaneous correspondence that:
(a) After the architect had approved the use of the New Paint, there was a period of time until early November 2004 when the defendant took the lead in trying to establish the combination of line parameters and solvents that would optimise the results using the New Paint.
(b) Some deficiencies continued to be pointed out in relation to the Compact Malaysia application line. However, these deficiencies were not of a serious nature.
(c) The problem was caused at least in part by the solvent initially recommended by the defendant.
(d) The difficulties were eventually overcome when the plaintiff elected to use its own line parameters and solvent.
(e) However, there were problems at least on occasions in December 2004 with colour variations in the paint supplied by the defendant.
The applicable legal principles
The terms of the contract
- [71]
[71] I turn to consider the relevant legal principles. It was common ground that the only written contractual documents that governed the relationship between the parties were a series of purchase orders issued by the plaintiff. These simply described the paint being ordered, the quantity and the price and contained the following term:
- [72]
[72] Mr Por submitted that in addition, the following terms were to be implied into the contract:
(a) that the Original Paint should be reasonably fit for the purposes for which the plaintiff required it, namely to be consistent in the tonality of the colour upon application to the panels such as would be acceptable by Taisei or the architect;
(b) that the Original Paint should be of satisfactory quality; and
(c) that the Original Paint should conform with the sample furnished by the defendant.
- [73]
[73] It was contended that these were to be implied either by operation of law or in order to ensure business efficacy. As it transpired, both counsel confirmed that these provisions were to be understood as referring to the implied conditions arising by operation of ss 14(3), 14(2) and 15 respectively of the Sale of Goods Act (Cap 393, 1999 Rev Ed) (“the Act”).
- [74]
[74] Mr Narayanan’s principal arguments on this issue may be summarised thus:
(a) where express terms have been included in a contract which governs the relevant rights and liabilities, there is no occasion for any terms to be implied dealing with the same subject matter. In effect, the parties should be taken to have contracted out of the provisions of the Act; and
(b) in any event, there was no basis to imply the terms sought by the plaintiff as they are neither necessary nor mandated by considerations of business efficacy.
- [75]
[75] Mr Narayanan made some other submissions as to the meaning and content of the conditions under the Act were I to hold that these were to be implied into the contract. I turn to those later.
- [76]
[76] The starting point of the analysis on the threshold inquiry as to whether the conditions contained in the Act are to be implied into the contract between the parties before me is s 14 of the Act. For convenience, I set out the relevant portions of the Act:
- [77]
[77] It is apparent from s 14(1) of the Act that no condition or warranty as to the quality or fitness for purpose of goods sold is to be implied into any contract for the sale of goods except as provided in ss 14 and 15 of the Act. Insofar as s 14 is concerned, a condition as to quality or fitness for purpose may be implied in two situations.
- [78]
[78] Under s 14(2), there is an implied condition that the goods supplied are of satisfactory quality where they are sold in the course of business.
- [79]
[79] Under s 14(3) a condition that the goods are reasonably fit for a particular purpose even if they are not commonly supplied for that purpose will be implied if the goods are sold in the course of a business and the seller is made aware of the particular purpose in question.
- [80]
[80] There is no dispute that the paint in question was sold by the defendant in the course of its business and so prima facie it would appear that at least the condition specified in s 14(2) is to be implied. To the extent the defendant contended that the terms were inapplicable it was incumbent upon the defendant to show that the terms were not to be implied or that the parties had in fact expressly contracted out of these terms. The applicable principle was articulated by GP Selvam J in MCST Plan No. 1166 v Chubb Singapore Pte Ltd [1999] 3 SLR 540 (“Chubb”) where he noted as follows at [65]-[66]:
- [81]
[81] This explains why Mr Narayanan’s second submission (at [74] above) is not sustainable. Where one is dealing with terms to be implied by virtue of a statutory provision, the inquiry is not whether such a term is necessary or reasonable. Rather, it is incumbent on the party seeking to resist the implication of the term to show that it would be unreasonable or unjust to imply the term.
- [82]
[82] The following passage from the judgment of Selvam J in Chubb at [94] is instructive in explaining the rationale underlying this approach in the context of commercial contracts for the sale of goods:
- [83]
[83] There was certainly no basis before me to contend that the parties had expressly contracted out of the terms of the Act and in fairness, it should be said that Mr Narayanan did not put his case at so high a level. The real issue was whether there was anything in the express terms which were inconsistent with these terms so as to make it unjust or unreasonable to imply them. In my judgment, there was no such inconsistency.
- [84]
[84] In fact, the nature of the contract in the present case with its paucity of express terms makes it a prime case for the terms prescribed by the Act to be implied. The material express terms that were contained in the purchase order were these:
(a) the buyer has the right to reject goods that do not conform to specifications;
(b) the buyer has the right to reject goods that do not conform to quality; and
(c) the buyer has the right to reject goods that are not delivered on time.
- [85]
[85] None of these terms are so inconsistent with the conditions prescribed in s 14(2) or (3) of the Act so as to make it unjust or unreasonable to imply them. On the contrary, they either echo or supplement the rights prescribed by the Act.
- [86]
[86] Mr Narayanan relied on the decision of Lai Siu Chiu J in Flairis Technology Corporation Ltd v Gan Huan Kee [2002] SGHC 116 (“Flairis Technology”) in support of the proposition that where express terms comprehensively cover by contracting parties’ rights and liabilities, there is no room for the imposition of an implied term. In my judgment, Flairis Technology is distinguishable from the present case on at least the following bases:
(a) that was not a case concerning a commercial sale of goods at all. Rather, Flairis Technology was a case concerning an application for injunctions restraining the defendants from carrying on a competing business and from using confidential information;
(b) the statement of Lai J at [81] of the judgment which is relied on by Mr Narayanan is undoubtedly correct in its context. However, it is not directly relevant to a case such as the present where the issue is whether terms which are ordinarily to be implied by virtue of a statute are to be excluded for some reason; and
(c) the agreements in question in Flairis Technology were lengthy and comprehensive. By no stretch could this be said of the purchase order in question before me.
- [87]
[87] I therefore do not see any basis for excluding the application of the conditions prescribed by the Act to the extent these are applicable.
- [88]
[88] Before turning to the analysis of the relevant terms, I should make one further point. Mr Por submitted that where one is concerned with terms implied under the Act, then liability for any breach is strict in nature. It is irrelevant whether the defendant had exercised reasonable care or skill if he fails to deliver that which he is bound to. In my judgment, this is correct and it is well articulated as follows by Selvam J in Chubb at [67]:
Conformance with samples
- [89]
[89] I first consider Mr Por’s submission that the Original Paint should comply with samples that were approved by the architect.
- [90]
[90] Section 15(1) and (2) of the Act provide as follows:
- [91]
[91] Mr Por submitted that the contract of sale for the Original Paint was a sale by sample because the defendant had supplied a colour sample to the architect who had approved it. He relied upon another decision of GP Selvam J, in Ceramic Brickworks (S) Pte Ltd v Asia-Tech Construction & Engineering Pte Ltd [1996] 1 SLR 200 (“Ceramic Brickworks”) in support of the proposition that a sale based on a sample submitted for the architect’s approval could constitute a sale by sample.
- [92]
[92] In my judgment, Ceramic Brickwords is distinguishable from the present case on three bases. First, Selvam J’s primary holding in that case was that the contract there was expressly provided to be a contract for sale by sample. The contract in question included the words “as per sample” which had been inserted by hand. Selvam J noted as follows at 204:
- [93]
[93] In the present case, there is no such express provision in the contract.
- [94]
[94] Secondly, Selvam J did find in the alternative that the contract was one for sale by sample on the basis of an implied term but he reached this conclusion because of the particular facts of the case. As he noted at 205:
- [95]
[95] These facts are considerably removed from those before me.
- [96]
[96] Thirdly, the goods in question in Ceramic Brickworks were bricks. The sample itself was a brick. This had been discussed between the parties and had been seen and approved by the architect. In the present case, the so-called sample was not of the paint in the form it was to be supplied by the defendant. The architect had never seen or approved this. The sample referred to by Mr Por was a number of finished panels. Those were not even available to me in the trial and there was therefore no basis for me to make a finding on this in any case.
- [97]
[97] For these reasons, I do not consider this was either expressly or impliedly contracts for sale by sample.
- [98]
[98] Mr Por also relied upon some mock-up panels that were approved by the architect after the colour had been selected and suggested these could serve as the relevant samples. This too was misconceived. First, as I pointed out to Mr Por, a sample that was agreed as a reference standard after the contract had been concluded would not ordinarily be relevant to a contract for sale by sample since a contract would generally not be concluded without the subject matter being agreed. Secondly, and in any event, these panels also were not produced before me in the trial.
- [99]
[99] There is a further practical problem with this part of the plaintiff’s case. As Mr Narayanan submitted, there was simply no evidence at all that the paint that was in fact supplied by the defendant did not conform to any samples that had been supplied. There was no evidence to show that the formulation of the Original Paint as supplied was different to the formulation of the paint applied on the finished samples. Further, there was no evidence to show what the appearance of the finished samples approved by the architect would have been if viewed from a similar angle as the panels that were later installed on the site and rejected by the architect and Taisei.
- [100]
[100] Accordingly, the plaintiff does not succeed on this basis.
Quality and fitness for purpose
- [101]
[101] I have already found that this was a contract for sale in the course of business. By virtue of s 14(2) of the Act which I have found is not excluded in the present case, there is a requirement that the goods be of satisfactory quality.
- [102]
[102] This standard was introduced following amendments which among other things replaced the previously used standard of “merchantable quality”. The standard of “satisfactory quality” is explained in ss (2A), (2B) and (2C) of the Act. In my judgment, the combined effect of those provisions include the following that may be relevant to the instant case:
(a) The inquiry whether the goods are of a satisfactory quality is an objective one to be undertaken from the view point of a reasonable person.
(b) The reasonable person in question is one who is placed in the position of the buyer and armed with his knowledge of the transaction and its background rather than one who is not so acquainted – Bramhill v Edwards [2004] 2 Ll Rep 653 at [39] (“Bramhill”).
(c) The burden of proof in this case is on the plaintiff who is alleging that the goods are not of satisfactory quality – see Bramhill at [41].
(d) The inquiry is a broad based one directed at whether the reasonable person placed in the situation of the buyer would regard the quality of the goods in question as satisfactory.
(e) At every stage of that inquiry, the Act clearly contemplates that the court should consider any and all factors that may be relevant to the hypothetical reasonable person. The Act does provide some practical guidelines to aid in structuring the inquiry.
(f) Thus, in relation to the actual quality of the goods in question, s 14(2B) of the Act provides a non-exhaustive list of the aspects of quality to be considered. Further, in relation to evaluating whether that quality is satisfactory, s 14(2A) of the Act provides a similarly non-exhaustive list of two factors, namely the way in which the goods may have been described and the price to be paid for it.
(g) In considering the quality of the goods in question, it may be noted in particular that the first aspect to be considered is whether the goods are fit for all the purposes for which goods of that kind are commonly supplied. This is a higher standard than previously applied – see Benjamin Sale of Goods (A.G. Guest, Gen Ed) (Sweet & Maxwell, 7th Ed, 2006) at 11-038.
(h) To the extent that goods are unsatisfactory in any way and that aspect had been specifically conveyed to the buyer prior to the contract, or the buyer had examined the goods (or a sample in the case of a contract for sale by sample) and such examination ought to have revealed it, then the condition does not extend to that. This is provided for in s 14(2C) of the Act.
- [103]
[103] Finally, I should also refer to s 14(3) of the Act (see at [76] above). For present purposes, it may be noted that the provision becomes relevant where the buyer expressly or impliedly makes known to the seller that the goods are required for any particular purpose, then a condition shall be implied that the goods are reasonably fit for that purpose whether or not that is a purpose for which such goods are commonly supplied. The seller may exclude such liability if it establishes that the buyer does not rely or may not reasonably rely upon the seller’s skill or judgment.
- [104]
[104] Section 14(3) imposes a duty on the seller to provide goods that are fit for the particular purposes for which they were sought by the buyer. The point is explained by Selvam J in Chubb albeit in the context of the previous provisions concerning “merchantable quality” and the following passage at [62] of that judgment is instructive:
- [105]
[105] Mr Narayanan submitted that the key requirement is a showing that there had been reliance by the buyer upon the seller. However, Mr Narayanan also accepted that once a particular purpose was made known to the seller, it would be assumed that the buyer relied on the seller.
- [106]
[106] In my judgment, there are two aspects to this. First, in matters such as the choice of components, the nature and properties of which are within the skill and judgment of the seller, the seller assumes the responsibility and there is no need to show reliance – see Chubb at [51] citing Cammell Laird & Co Ltd v Manganese Bronze and Brass Co Ltd [1934] AC 402.
- [107]
[107] Secondly, as noted in Benjamin’s Sale of Goods (see [102(g)] above) at 11-059:-
- [108]
[108] Put simply, once the purpose is conveyed to the seller, reliance on the part of the buyer need not be shown but it may be rebutted and it is for the seller to do this.
- [109]
[109] Turning to the case at hand, the relevant facts are these:
(a) The Original Paint had been supplied by the defendant in the course of its business.
(b) It was not disputed that the defendant knew that the Original Paint was to be used for the MAS Building project. Mr Ong stated that he was approached by the architect in 2002 to submit colours for this project. He stated under cross examination that he did meet the architect’s representative in 2002 and was informed that he wanted a metallic colour for the MAS project.
(c) Mr Ong accepted that that the Original Paint was a customised paint formulated by the defendant and not a standard colour included in the defendant’s general colour charts. The nature and properties of the ingredients used in formulating the paint were plainly within the defendant’s sphere of responsibility.
(d) He indicated under cross-examination that he learnt from Rotol that the architect wanted a “big sparkle metallic paint, exotic in colour as well as [with] maximum reflective and sparkle qualities”.
(e) It was not disputed that the defendant knew that when the plaintiff ordered the Original Paint, it was for use in the MAS Building project. As I have noted above, Mr Narayanan accepted that it was a customised colour made particularly for the MAS Building project.
(f) The Original Paint had never been used anywhere else.
(g) Mr Ong also confirmed under cross-examination that the defendant was informed that the Original Paint had been approved and they were then approached by the plaintiff who placed an order.
(h) Mr Ong contended that he knew about the strong side-view effect of the Original Paint from the outset and that he had informed Mr Ling about the difficulties with the Original Paint in February or March 2004. I reject his evidence on this score. Mr Ong was unable to satisfactorily explain how he could recall in the course of the hearing before me that he had communicated these concerns to Mr Ling in 2004 when in the minutes of a meeting in July 2004, he stated that he could not recall who he had spoken to. Further, Mr Ong claimed he had informed Mr Ling that the Original Paint was difficult to apply because it contained only coarse aluminium flakes. However, he apparently did not inform his colleague, Mr Choong of these concerns. Most importantly, it is evident from the various investigative reports prepared on behalf of the defendant at the material time, and from an email written by Mr Ong himself on 29 June 2004 that the link between the inconsistency problem in particular the strong side view effect and the use of only coarse aluminium flakes in the Original Paint was not understood or foreseen by anyone on the defendant’s side until late June or early July 2004. In my judgment, even though this was a matter within its responsibility, the defendant simply did not foresee that the application of the Original Paint would have the effects that were later encountered on the site and which led to the rejection of the panels that were installed.
(i) The panels were rejected because of inconsistency in tonality as between panels as well as within particular panels. It has never been suggested that the finish in fact achieved with the use of the Original Paint was acceptable. On the contrary, there are several statements in the reports prepared on the defendant’s behalf at the material time that accept that the finish in fact achieved was not acceptable. Moreover, the entire thrust of the defendant’s case was that the finish was unacceptable because of deficiencies in Compact Malaysia’s line. I have already found at [61] above that on the evidence before me, it was not possible to achieve a consistent and acceptable finish using the Original Paint.
- [110]
[110] On these facts, in my judgment the Original Paint was not of satisfactory quality. It is clear in my view that a reasonable person in the position of the plaintiff and with knowledge of the relevant background should have expected the paint supplied by the defendant to be such as to be capable of being applied on the panels and producing a consistent finish. Given the prestigious nature of the project and the time taken to select the desired colour it is inconceivable that a reasonable person would have found that Original Paint to be of a satisfactory quality if it was not possible to achieve an acceptably consistent finish using it.
- [111]
[111] Equally, the Original Paint was not fit for the purpose for which it was acquired, namely to be used at the MAS Building project. There is no doubt that the defendant knew that the paint was being acquired by the plaintiff for use on that project at the time it was ordered. This was even stated on the purchase order.
- [112]
[112] The question then is whether the defendant was able to show that the plaintiff was not relying or could not reasonably rely upon the defendant’s skill and judgment to produce a paint that was capable of being applied so as to produce a consistent and acceptable finish. The defendant might have discharged this burden for instance by establishing that it knew from the outset that it would not be possible to achieve consistent tonality using the Original Paint and had communicated this to the plaintiff prior to the parties entering into the contract. However, I have found that the defendant itself did not know this at the outset and also that it did not communicate any such thing to the plaintiff. Further, in my judgment, the plaintiff did not know at the time of the contract that the Original Paint derived its metallic properties exclusively in coarse flakes. Nor was there any evidence to sustain a finding that assuming the plaintiff had known this, it also knew what the consequences of this would be. Indeed, it is inconceivable that it would have known the consequences given the novelty of this formulation and the fact that even the defendant was taken by surprise.
- [113]
[113] Mr Narayanan’s principal responses to this were as follows:
(a) The defendant’s only obligation was to supply the plaintiff with the paint that was ordered pursuant to the purchase orders.
(b) The so-called inherent problem related to the exclusive use of coarse aluminium flakes in the Original Paint which gave rise to a strong side view effect when the finished panels were viewed at a distance or at an angle. This was an attribute of the paint which could have been overcome by proper application techniques. Reference was made to the evidence of Mr Lo, which according to Mr Narayanan, appeared to accept that at least some of the problems encountered with the Original Paint in June 2004 were due to deficiencies in the applicator’s line operations. Reference was also made to the evidence of Mr Ling that the problem arose when using an electrostatic gun and could be overcome by the use of dummy panels surrounding the actual panel being sprayed so that the aluminium flakes accumulated at the edges of the dummy panel, which the plaintiff did not do save when applying the New Paint.
(c) Insofar as the plaintiff relied upon the so-called admissions contained in the reports and other letters issued by the defendant’s representatives, these were shaped by Mr Kwang in particular who was pushing for the architect to accept the New Paint. Further, to the extent Mr Ong appeared under cross-examination to accept the content of these reports, in fact his agreement was only related to the fact that these documents were issued by the defendant who amended them to reflect Mr Kwang’s wishes.
(d) The defendant’s expert, Mr Seah, gave evidence on a number of points. He stated that metallic paint was not easy to apply. Application was just as important as the chemistry of the paint. Further, because there were several coats to be applied each coat required stringent control. Furthermore, metallic colour finishes are more sensitive to colour change under different application methods and conditions. In the absence of any expert from the plaintiff’s side to refute this, I should accept this evidence from Mr Seah.
(e) In this regard, Mr Narayanan submitted, it was relevant that the plaintiff ordered and used some 200 litres of Original Paint in early 2005 for the internal walls of the MAS Building. This showed that the plaintiff realised that there was nothing in fact wrong with the Original Paint.
- [114]
[114] I have touched on some of these issues already but for completeness, I now consider and address each of these points. Dealing with the first point, this is wrong because it wholly ignores both the express as well as the implied terms of the contract. I have set out in detail why the statutory terms in particular do apply in this case. I would only mention in addition the following passage from the judgment of Selvam J in Chubb at [90] where he considered and rejected the identical argument advanced on behalf of the sellers there:
- [115]
[115] Turning to the second point, Mr Narayanan submitted that the effect of the evidence given by the plaintiff’s witnesses was that they accepted that the problems encountered with the Original Paint could be overcome by proper application techniques. In fact, the evidence of both Mr Lo and Mr Ling to which Mr Narayanan referred me does not support this. Mr Ling did accept that eventually, with the New Paint the problem was overcome after a process of trial and error that included the use of dummy panels. However, he did not accept that the problems encountered with the Original Paint could be completely overcome.
- [116]
[116] This leads me to the third point. The reports and documents in question clearly and unequivocally do accept that the problem was inherent in the paint and that the strong side-view effect was caused by the use of coarse aluminium flakes only. Further, these reports state that the Original Paint was beyond practical management to achieve an acceptable colour consistency and uniformity. Although the defendant’s case was run on the basis that these reports were tailored and shaped by pressure from Mr Kwang, it was plain from Mr Ong’s evidence that in the final analysis, he accepted the contents of these reports and documents. The following extracts from the evidence are illustrative of the point:
- [117]
[117] Therefore, Mr Narayanan’s suggestion that Mr Ong’s agreement was in any way short of an unqualified acceptance of the contents of these documents is incorrect and I simply do not accept the attempt to recharacterise the effect of the evidence that was given. Further, Mr Ong, in his evidence, accepted that while the problem could be diminished it could not be overcome. This clearly was material to the case.
- [118]
[118] I turn to the fourth point. Leaving aside the serious reservations I have expressed as to Mr Seah’s expertise and knowledge of the relevant facts at [10]-[13] above, none of the aspects of his evidence that Mr Narayanan relied on displaces or in any way undermines the conclusion that the Original Paint was ultimately not capable of producing a finish that was satisfactorily consistent. Mr Seah’s evidence as to the difficulties in applying such paint, assuming it is accepted, does not detract from the defendant’s own acceptance that there was an inherent problem with the Original Paint which could not be wholly overcome even when its representatives surprised the line and set the relevant parameters. Moreover, to the extent Mr Seah did proffer a view as to the “probable and likely causes” of the problems encountered with the defendant’s paint, this was essentially a repetition of the main complaints that the defendant had raised in respect of the deficiencies in application. There was no attempt by Mr Seah to explain how or why he concluded this was the root cause of the problem. There was also no evidence of his having applied his mind to the strong side-view effect caused by the use of only coarse flakes in the Original Paint, presumably because he was not aware of this fact: see [11]-[12] above. Mr Seah’s evidence on the material issues was therefore not of assistance.
- [119]
[119] Turning to the last of the points I have noted above, there was some evidence that the Original Paint when used in the internal walls was found to be acceptable. This is perhaps not surprising since it was also evident that the tonal inconsistency was often not perceptible when the panels were examined at the perpendicular and from a certain distance. It was not disputed that the defendant knew the paint was to be used with the external cladding panels and it was here that the problem of tonal inconsistency became pronounced given the angle and distance from which the panels were being viewed. It is this that rendered the Original Paint unsatisfactory and the fact that it could be used in some areas did not render it otherwise.
- [120]
[120] Accordingly, I am satisfied that the defendant was in breach of the implied conditions as to satisfactory quality and as to fitness for purpose in supplying the Original Paint.
The judgment continues past this page. Read the rest at eLitigation.