Grounds publishedDecided 25 May 2016

High Court

Sintalow Hardware Pte Ltd v OSK Engineering Pte Ltd

Feedback & support

[2016] SGHC 104Case no. Suit No 662 of 2012

What happened, in plain English

There is no plain-English summary of this judgment yet.

Ask about this judgment

Grounds of decision

Official text from eLitigation

  1. Background

  2. The parties

  3. [2] The plaintiff, Sintalow Hardware Pte Ltd, was incorporated in 1982 and is in the business of distributing and supplying mechanical and engineering products. It is the exclusive distributor in Singapore for several well-known manufacturers of pipes, pipe-fittings and valves. The managing director of the plaintiff is Mr Chew Kong Huat, also known as Johnny Chew (“Mr Chew”).

  4. [3] The defendant, OSK Engineering Pte Ltd, is a company which installs plumbing, sanitary and gas works in buildings. The defendant is run by a married couple, Mr Tan Yeo Kee (“Mr Tan”) and Mdm Oh Swee Kit (“Mdm Oh”). Mdm Oh is the general manager of the defendant and she is the main person who dealt with the plaintiff, represented by Mr Chew, in connection with the transactions which gave rise to this action.

  5. Outline of events

  6. [4] Although the plaintiff and the defendant had had dealings with each other prior to June 2007, such dealings had been on a small scale basis and involved the ad hoc supply of various types of pipes, valves and expansion joints by the plaintiff in response to orders placed by the defendant for immediate or early delivery. In May 2007, the defendant informed the plaintiff that it was tendering for the installation of plumbing and sanitary works at the hotel forming part of the Marina Sands Integrated Resort Project (“the Project”) and asked the plaintiff to submit its price list for various pipes and fittings. The plaintiff sent the defendant its May 2007 price list and thereafter, from time to time at the defendant’s request, provided it with additional price lists.

  7. [5] Sometime in September 2007, the defendant was appointed as the subcontractor to undertake plumbing and sanitary works for the Project.

  8. [6] On 18 September 2007, Mr Chew met Mr Tan and Mdm Oh in the defendant’s office to discuss the supply of products for the Project. It is the plaintiff’s position that at that meeting the defendant represented that it would be able to and would purchase at least $5m worth of products from the plaintiff for the Project. The plaintiff called this $5m the “Estimated Sale Amount”. On 22 September 2007, the plaintiff wrote to the defendant confirming that certain “special discount rates” in respect of products to be supplied by the plaintiff had been discussed and agreed at the meeting. I will refer to this letter as “the plaintiff’s September letter”. The plaintiff also says that terms were agreed at this meeting which became the material terms of what the plaintiff calls the “Total Package Agreement”. The defendant denies that the representations were made or that any contract was concluded on 18 September 2007.

  9. [7] Further meetings took place in October and November 2007. At one of these meetings the defendant insisted on further discounts for some of the products and the plaintiff agreed to these.

  10. [8] Whilst the plaintiff’s position is that the parties entered into the Total Package Agreement as the contract which contained the standard terms and conditions on which the plaintiff subsequently supplied products to the defendant, the defendant’s position is that the standard terms and conditions were contained in a different contract evidenced by its letter dated 21 November 2007 (“the defendant’s November letter”). The defendant refers to this contract as the Master Contract. One of the issues in this case is whether the general contractual arrangements between the parties are contained in the Total Package Agreement or in the Master Contract.

  11. [9] The defendant’s November letter was signed by both the plaintiff and the defendant. The plaintiff says that this letter did not reflect the agreed terms and Mr Chew had only signed it under pressure from Mdm Oh. Therefore, immediately thereafter the plaintiff wrote to the defendant to correct the agreed terms. This letter, also dated 21 November 2007, is referred to as “the plaintiff’s November letter”. The defendant denies that the plaintiff’s November letter has any contractual effect.

  12. [11] The disputes between the parties over the supply of products arose in 2008. This suit, however, was commenced only in August 2012 and it came on for hearing in August 2015. Thus, by the time the witnesses were before me, the events that they spoke of had occurred up to eight years earlier. That could account for some of the inconsistencies in testimony. It would not be surprising that after all that time memories had faded somewhat. There were also difficulties with the oral evidence due to the fact that Mdm Oh knows very little English and testified in Mandarin although all the correspondence was in English. Some significant difficulties were encountered in the course of interpretation. Further, Mr Chew’s use of the English language, while fluent, was rather idiosyncratic and he sometimes had difficulty understanding the questions asked. Thus, in assessing the strength of each party’s case, I have preferred to rely on the documentary evidence as far as possible.

  13. The plaintiff’s claim and the issues

  14. [12] The plaintiff’s claim is that the defendant is liable to it for loss and damage arising from the following:

  15. (a) The defendant’s breach and/or repudiation of the Total Package Agreement and of the Product Agreements which were governed by the Total Package Agreement in relation to discounts to be accorded to the defendant.

  16. (b) A discount mistakenly accorded to the defendant in relation to what the plaintiff terms as the “New Duker Agreement”.

  17. (c) The delivery of CV Couplings to the defendant for which, mistakenly, the defendant was not invoiced.

  18. (d) Further, or alternatively, the defendant’s misrepresentations to the plaintiff.

  19. [13] The parties have formulated the issues slightly differently. I think that the main issues that arise are as follows:

  20. (a) Whether the governing contract entered into between the parties in 2007 was the Total Package Agreement or the Master Contract.

  21. (b) Whether the plaintiff and the defendant had entered into subsidiary sale and purchase agreements (ie, the Product Agreements) in respect of each type of product required for the Project.

  22. (c) Whether the plaintiff is entitled to withdraw the discount accorded in the “New Duker Agreement” and claim payment in relation to the CV Couplings.

  23. (d) Whether the defendant’s alleged representations to the plaintiff that it would be able to and would purchase at least $5m worth of products from the plaintiff amount to actionable misrepresentation for which the plaintiff has an alternative course of action.

  24. A number of sub-issues need to be considered to determine the main issues but I will identify these in the course of the discussion.

  25. The governing contract

  26. The pleadings

  27. [14] The plaintiff’s Statement of Claim (“SOC”) went through several iterations. In the SOC (Amendment No 5), the plaintiff pleaded the following in relation to its allegation that the parties had entered into the Total Package Agreement:

  28. (a) At the end of 2007, the plaintiff and the defendant entered into the Total Package Agreement that was reached partly orally and partly in writing as follows:

  29. (i) In so far as it was made orally, Mr Chew and Mdm Oh entered into the Total Package Agreement during a meeting on 18 September 2007.

  30. (ii) In so far as it was made in writing, the Total Package Agreement was contained in or was to be inferred from:

  31. (A) The plaintiff’s September letter;

  32. (B) The defendant’s November letter; and

  33. (C) The plaintiff’s November letter.

  34. [15] The plaintiff further pleaded that it was induced to enter into the Total Package Agreement by representations from the defendant that it would be able to and would purchase from the plaintiff the products described in para 6(b) of the SOC in quantities totalling at least $5m in value. Consequently, the express terms of the Total Package Agreement were as follows:

  35. (a) The defendant would purchase from the plaintiff products amounting to the Estimated Sales Amount.

  36. (b) The plaintiff would extend agreed discounts in respect of the products.

  37. (c) The discounts would only be applicable to the products and only if they were to be used in the Project.

  38. (d) The products would be subject to “consultant’s/owner’s/client’s approval” (“the Approval Clause”).

  39. (e) The parties would enter into the Product Agreements being separate agreements for the price and quantities of the various products.

  40. (f) The Product Agreements would be subject to the terms of the Total Package Agreement (alternatively, this was an implied term).

  41. (g) Payment was to be made within 60 days of delivery or such other period indicated by the plaintiff.

  42. (i) The defendant was entitled to vary the quantities of the various products by only plus or minus 10% from the quantities stated in the Product Agreements. Any greater variation was subject to the plaintiff’s approval. Alternatively, this term (which I shall call “the 10% Variation Term”) had to be implied.

  43. (j) The defendant was required to accept delivery of the products by December 2010 at the latest. Alternatively, this term had to be implied.

  44. [16] As stated above, the defendant rejected the Total Package Agreement and put forth the Master Contract in its stead. It pleaded that the primary terms of the Master Contract were contained in the defendant’s November letter and these were the terms of supply in respect of items required for the Project. I set out the pleaded terms here for easy comparison:

  45. (a) There would be an agreed rate of discounts.

  46. (b) The prices for the products would remain constant (“the Fixed Price Clause”) regardless of any:

  47. (i) changes in the quantity;

  48. (ii) fluctuation in currency; and

  49. (iii) amendments to be specified for the pipes and fittings.

  50. (c) The plaintiff was to maintain a 10% buffer of stocks during the contract period.

  51. (d) The items to be used would be subject to the Approval Clause.

  52. (e) The items specified by the defendant were an estimate only (“the Estimated Quantities Clause”).

  53. (g) Subject to any extension of time, the contract period would be between January 2008 and December 2010.

  54. (i) The plaintiff was to replace defective pipes and fittings.

  55. (j) Payment was to be made within 60 days.

  56. [17] The defendant also denied that any representation had been made as to the types or quantities of products required for the Project. In so far as the defendant provided indications and/or estimates of types or quantities of products required, these were expressed in the form of types and quantities and not in terms of the value of such products. The defendant did not represent that it would be able to and would purchase at least $5m worth of products.

  57. [18] The plaintiff put forward the Total Package Agreement as a composite agreement comprising the matters agreed at and recorded by the 18 September 2007 meeting and the September and November letters. It submitted that the court should adopt a holistic approach in considering the conduct of the parties over the period during which negotiations took place rather than insisting on clear-cut evidence of offer and acceptance. It relied on cases like Projection Pte Ltd v The Tai Ping Insurance Co Ltd [2001] 1 SLR(R) 798 and Norwest Holdings Pte Ltd (in liquidation) v Newport Mining Ltd and another appeal [2011] 4 SLR 617. In the latter case, Andrew Phang JA commented at [24] that the question of whether there was a binding contract between the parties should be determined by considering all the circumstances and these would include what was communicated to the parties by words or conduct. The Court of Appeal also held, in the more recent case OCBC Capital Investment Asia Ltd v Wong Hua Choon [2012] 4 SLR 1206, that a court should first examine relevant documentary evidence in determining whether a contract existed or not, although it also recognised that credible oral testimony could be helpful to the court.

  58. [19] I accept that where there is a long period of negotiation between parties, the court must give consideration to all the circumstances in deciding whether and when a contract has been concluded. Where, however, after negotiations the parties sign a document which appears to represent agreed terms, it would always be more difficult for the party who alleges that the documented terms were not the only agreed terms to establish that the document was only part of the contract rather than the whole contract. This would be even more so when the signed terms contradict some of the terms that had allegedly been agreed previously.

  59. The evidence and the analysis

  60. [20] Looking at the documentary evidence first, the same comprises three letters, only one of which was signed by both parties. The first letter is the plaintiff’s September letter, a short letter that referred to the meeting of 18 September 2007 (which I shall call the “18 September meeting”). It contained three points:

  61. (a) A confirmation that the “special discount rates” discussed and agreed at the 18 September meeting were:

  62. (i) 23% for Fusiotherm Pipes/Fittings;

  63. (ii) 23% for Duker Pipe Fittings; and

  64. (iii) 35% for CV Couplings.

  65. (c) A request from the plaintiff for the defendant to give it a letter of confirmation as soon as possible so that the plaintiff could lock in the best prices with its manufacturers.

  66. [21] Bearing in mind that this letter is supposed to have been written after the defendant both expressly and impliedly represented to the plaintiff that it would buy at least the Estimated Sales Amount, it is significant that such representation is not, even indirectly, referred to. Secondly, the plaintiff’s request for a letter of confirmation from the defendant indicates that at this stage, no contract had yet been concluded. The only term of the Total Package Agreement that is reflected in the September letter is term (b) (see para 15 above).

  67. [23] The defendant’s November letter is addressed to the plaintiff and entitled “Re: Contract Agreement on the use of Sintalow Hardware Pte Ltd for project Marina Bay Sands”. Section 1 of the letter states that it is with reference to the plaintiff’s quotation SH/JCJ/sv/01733R2/07 dated 15 November 2007 and the additional discounts listed in the letter. In section 2, the defendant says that it has “pleasure” in awarding the plaintiff the abovementioned contract for the supply of hardware for the Project. Section 3 sets out the “Terms & Conditions” of the contract. Those are the terms paraphrased in para 16 above. Attached to the letter is a copy of the latest price list supplied by the plaintiff to the defendant as of that date.

  68. [24] The last two sentences of the letter read:

  69. The signatures of Mdm Oh and Mr Chew appear below those sentences. Mdm Oh’s signature is appended as being on behalf of the defendant and Mr Chew’s signature appears below the printed words “I/We have read and accept the above terms and conditions”. There is no dispute that in signing the letter Mr Chew did so for the plaintiff. There are two versions of the signed letter, one bears Mr Chew’s signature alone and the other bears both his signature and the plaintiff’s company stamp next to it.

  70. [26] The defendant’s November letter reflects terms (b), (d), (g) and (h) of the Total Package Agreement as set out in para 15 above. It does not contain terms (a), (c), (e), (f) and (j) of that agreement and its contents contradict those terms. It is also pertinent that the defendant’s November letter is not identical to the plaintiff’s September letter in relation to the discounts to be given by the plaintiff. In the plaintiff’s September letter, the discount for CV Couplings was 35% but in the defendant’s November letter, this discount is stated to be 40%.

  71. [27] The plaintiff’s November letter is short. The subject is “Piping material for Sand IR Project” followed by a list of eight products. The letter itself states that it refers to several discussions “as agreed on total package deal” and asked for the final bill of quantity for each of the items specified so that the plaintiff can give its total prices and its supply conditions. It also states that the quantities shall be based on the 10% Variation Term with a breakdown of the delivery schedule. From the plaintiff’s point of view, the importance of this letter is the 10% Variation Term which the plaintiff wants imported into the contract.

  72. [28] The plaintiff’s November letter contradicts the Estimated Quantities Clause in the defendant’s November letter. It is signed only by the plaintiff and it is not clear how it and the defendant’s November letter can be part of the same contract, which is the plaintiff’s position, when the parties take such opposite views on an important term.

  73. [29] If I was looking at the correspondence in isolation, I would hold that the contract was concluded when the plaintiff signed the defendant’s November letter and the agreed contractual terms were those in that letter. Read objectively, the language evinces a contractual intention on the part of both parties. That would mean I accepted the Master Contract, rather than the Total Package Agreement, as the binding contract between the parties. Looking at the documents alone, I would characterise the plaintiff’s September letter as an offer made in the course of negotiations and not as a reflection of a binding contract. The defendant’s November letter settled the list of agreed discounts and the general terms of supply and thereby superseded the plaintiff’s September letter. It was accepted by both parties. The plaintiff’s November letter I would regard as irrelevant to the contract because either it was signed before the plaintiff signed the defendant’s November letter and was therefore superseded by the defendant’s letter as accepted by the plaintiff or, if issued later, it was an ineffective attempt by the plaintiff to unilaterally change terms which had already been agreed. It is noteworthy that the defendant did not respond to it either in writing or orally.

  74. [30] Apart from the evidence provided by the immediately relevant documents, the evidence of the circumstances in which the contract was made leads also to the conclusion that the contract concluded was the Master Contract.

  75. Did the defendant represent that it would be able to and would purchase the Estimated Sales Amount from the plaintiff?

  76. [31] The first sub-issue that arises in connection with the surrounding circumstances is whether the defendant represented to the plaintiff that it would be able to and would purchase the Estimated Sales Amount from the plaintiff and whether such representation became a contractual term. The defendant denies having made the alleged representations. My consideration of this issue at this stage will also affect the plaintiff’s separate claim founded in misrepresentation.

  77. [32] The plaintiff’s case is that the representation was made by way of:

  78. (a) the defendant informing the plaintiff, during the tender stage (in or around May/June 2007), that the Project involved the construction of 2,800 rooms in a three-tower hotel;

  79. (b) the defendant handing a Bill of Quantities (“June BQ”) to the plaintiff in June 2007; and/or

  80. (c) Mdm Oh stating to Mr Chew at the 18 September meeting that the defendant would be able to and would purchase at least $5m worth of products from the plaintiff.

  81. [34] The next development was that in June 2007, one of the plaintiff’s employees, one Mr Ron Lee, passed Mr Chew a copy of the June BQ. Ron Lee told Mr Chew that he had been given the June BQ by Mdm Oh on an informal basis and the June BQ was to be kept confidential as the defendant had not yet been awarded the Project. Upon receiving the June BQ, Mr Chew computed the total value of the quantities listed in it as coming up to between $7m and $8m. The plaintiff says that by handing the June BQ to it and thereby informing the plaintiff of the scale of the Project, the defendant implicitly make representations to the plaintiff as to the value of the products it would purchase from the plaintiff.

  82. [35] The defendant’s position is that it did not pass the June BQ to the plaintiff and that the source of the document was unclear. Mdm Oh claimed to be unable to recall handing the June BQ to Ron Lee.

  83. [36] The plaintiff did not call Ron Lee to testify how he obtained the June BQ. Mr Chew’s evidence that it was given to Ron Lee by Mdm Oh is hearsay and cannot prove this fact. The document itself is of little assistance. The defendant’s letterhead does not appear on the June BQ and it is undated. It is also not helpful to the plaintiff’s case that the plaintiff only discovered and disclosed this document in 2015 in the course of reviewing documents for the purpose of preparing its affidavits of evidence in chief thus giving the defendant very little opportunity to investigate whether, and if so how, the document had been passed to the plaintiff more than seven years earlier.

  84. [37] I agree with the defendant that the plaintiff has not proved the provenance of the June BQ. Even if it was supplied by the defendant to the plaintiff, there is no evidence that Mdm Oh handed it over for any particular purpose on the part of the defendant. It could just as well have been requested from Mdm Oh by the plaintiff because the plaintiff wanted to know which of its price lists would be relevant to the defendant. It is not in dispute that after the initial supply of the May 2007 price list, the parties communicated with each other and other price lists were subsequently given by the plaintiff to the defendant. It would useful for the plaintiff for its own pricing purposes to know what the possible quantities involved would be. In these circumstances, I do not consider it justified to draw any inference from the plaintiff’s possession of the June BQ. To me, the ambiguity of the circumstances in which the June BQ came into the plaintiff’s hands precluded it from constituting an implied representation.

  85. [38] I am also impressed by the defendant’s argument that legally a bill of quantities is not to be treated as a warranty of its contents. In Hock Chuan Ann Construction Pte Ltd v Kimta Electric Pte Ltd [1999] 2 SLR(R) 237, the court, citing Keating on Building Contracts (Sweet & Maxwell, 6th Ed, 1995), noted that it had frequently been held that the inclusion of bills of quantities in an invitation to tender or even in a schedule to a contract does not show that the employer is warranting their accuracy. This means that bills of quantities are guidelines and do not confirm the actual quantities that would be needed as construction progresses. The plaintiff was therefore not entitled to treat the June BQ as a warranty or representation by the defendant as to the value of the Project. It was an indication, no more. Mr Chew himself showed some appreciation of this. When I asked him why at the 18 September meeting he had mentioned the proposed value of the contract as being between $3m and $4m when his calculations based on the June BQ came to double that figure, his reply was that it was because he wanted the defendant to give him a better BQ, “the final BQ”. Thus, even to the plaintiff, the June BQ was a provisional estimation.

  86. [39] This leaves me with the representations made at the 18 September meeting. Mr Chew’s evidence was that at the meeting Mr Tan told him again about the size of the Project and he responded that based on the number of rooms, the size of the supply contract appeared to be between $3m and $4m. Mdm Oh replied that it would be more than that and that the defendant would be able to and would purchase from the plaintiff a few million dollars-worth of products for the Project. Mr Chew asserted in court that he understood from the June BQ and the representations by Mdm Oh at the 18 September meeting that the defendant would be able to and would purchase at least $5m worth of products from the plaintiff.

  87. [40] Mr Chew explained how he had come to the figure of $3m to $4m as being the value of the supply contract. He said that when he received the June BQ, he had computed the total value of the quantities listed in it as being between $7m and $8m. This calculation was based on the figures reflected in the plaintiff’s May 2007 price list and the price lists of other suppliers for items which the plaintiff did not deal in. The figure of $3m to $4m was the total value of the products which the plaintiff was the appointed supplier of and would be able to supply to the defendant. However, Mdm Oh informed Mr Chew that the defendant wished to purchase other products that the plaintiff was able to supply that were not listed in the June BQ. On this basis, the Tans asked for more discount, especially because the plaintiff’s Duker products had, the Tans said, already been specified by the owner of the Project and they wanted to purchase them from the plaintiff. As a result, the Total Package Agreement was born.

  88. [41] The defendant accepts that, after it was appointed as subcontractor for the Project, it arranged the 18 September meeting during which the parties negotiated special discounts that would be applied to each category of products purchased from the plaintiff for the duration of the Project. The defendant agreed that its primary concern, during these and other negotiations with the plaintiff in 2007, was to lock in discounted prices and the supply of products. The defendant agreed that Mdm Oh was trying hard to get the highest possible discounts.

  89. [44] The problem for the plaintiff is that it has not been able to clearly articulate what form the dangled carrot took. Even if Mr Chew’s evidence in court is to be accepted at face value, the most that Madam Oh said was that the orders would amount to a few million dollars. How did that statement translate to at least $5m? When pressed, Mr Chew had to admit that Mdm Oh had never said she would purchase $5m worth of products from the plaintiff. It is further evidence of the plaintiff’s difficulty with delineating the representation that the assertion that the Estimated Sales Amount would be $5m was made only in the sixth iteration of the SOC filed in March 2015. When the writ was issued in August 2012, the Estimated Sales Amount was said to be $2.93m. Two months later, the Estimated Sales Amount was amended to $2.89m and it remained at this level till March 2015.

  90. [45] Mr Chew was queried at trial why his initial pleadings had put the Estimated Sales Amount first at $2.93m and thereafter at $2.89m if Mdm Oh had in fact represented that the amount was $5m. Mr Chew had some difficulty in giving a coherent reply justifying either of the earlier figures. He then insisted that Mdm Oh had said “Oh, we can buy everything from you, it’s above $5m”. I asked him whether Mdm Oh said that the defendant would buy $2.93m worth of goods and Mr Chew gave the odd reply that “I think at that time Mdm Tan [sic] also won’t know the actual figure”. Subsequently, he confirmed that Mdm Oh had never said that the defendant would buy $2.93m worth. He insisted, however, that the figure mentioned was $5m and that Mdm Oh had said that “it could be more than $5m” [emphasis added] which had prompted him to consider how the figure could be more than $5m.

  91. [49] For the reasons given above, I have concluded that no representation as pleaded by the plaintiff was made by the defendant. This conclusion means that even if there was a Total Package Agreement, such contract did not contain a term specifying that the defendant would purchase products valued at the Estimated Sales Amount from the plaintiff. That term is the raison d’etre of the Total Package Agreement and without it the parties’ agreement moves much closer to the Master Contract.

  92. Other matters supporting the conclusion of the Master Contract

  93. [52] Mr Chew was, apparently, alive to the difference in the approaches of the plaintiff and the defendant from 21 November 2007 itself. His evidence was that early that morning he visited the defendant’s premises, was shown the defendant’s November letter and asked to sign it. He was surprised at the contents of the letter because four of its terms, including para 3.iv, were wrong. The other terms that he objected to were:

  94. (b) para 3.ii which stated that the plaintiff was to keep at least 10% extra stock of the products throughout the duration of the Project; and

  95. (c) para 3.iii – which stated that the products were to be subject to the approval of the Consultant/Owner/Client.

  96. [54] Mr Chew said that, accordingly, when he got back to the plaintiff’s office, he drafted and sent out the plaintiff’s November letter. This letter was sent out at 3.51pm. It is a short letter, marked urgent, which states the following:

  97. [55] In its November letter, the plaintiff simply repeated the 10% Variation Term. The letter did not, additionally, expressly reject the Estimated Quantities Clause or state that the plaintiff would not be bound by the terms of the defendant’s November letter. Although the plaintiff asserted that from the time Mr Chew saw the defendant’s November letter, he knew that it was incorrect in four aspects, one being the Estimated Quantities Clause and the others being as set out in para 52 above, the plaintiff’s November letter did not deal with these other matters. In view of the failure of the letter to mention all these important points, it is difficult to believe that the plaintiff’s November letter was drafted in response to the signed contract represented by the defendant’s November letter. It is also difficult to accept Mr Chew’s evidence that he signed the defendant’s November letter because he was pressured to do so by Mdm Oh and despite having serious misgivings regarding its terms.

  98. [56] There is quite a bit of confusion about when Mr Chew signed the defendant’s November letter. In court, Mdm Oh did not accept it was signed the day it was dated, but said it was signed on 11 or 13 December 2007. The presence of three copies of the letter in the Agreed Bundle, each with slightly different embellishments, only adds to the confusion. I will describe these letters and then state what I believe is the reasonable inference to draw from the same. The letters are:

  99. (a) The copy appearing at 2AB790-791. This bears the signatures of both Mdm Oh and Mr Chew. There is a company stamp next to Mdm Oh’s name but none next to Mr Chew’s. At the top of page 790 there is a “FAX REC’D” stamp with a handwritten date that appears to be “21/11” and at the top of page 791 is a fax transmission date and time record, being “21-11-07:09:35”.

  100. (b) The copy appearing at 2AB788-789. This bears the signatures of both Mdm Oh and Mr Chew and next to each of their names is their respective company’s stamp. There are no stamps regarding date of fax transmission nor is there any fax transmission record at the top of the page. Below Mr Chew’s signature is a handwritten endorsement that was written by Mr Chew. It reads:

  101. This sentence is followed by Mr Chew’s signature and the date “11/12/07”.

  102. (c) The third copy appears at 2AB765-766. It is identical to the second copy, company stamps and handwritten endorsement and all. The difference is that at the top of page 765, a “FAX OUT” stamp appears and below that is the handwritten date “13/12/17”. Mr Chew confirmed that the “Fax Out” stamp was the plaintiff’s. There is a connected “Fax Transmission report” that shows this copy was sent out by the plaintiff on 13 December 2007.

  103. [57] Scrutinising these documents as best I can, I have come to certain conclusions. First, the document at 2AB790-791 supports Mr Chew’s evidence that he signed the defendant’s November letter early on the morning of 21 November 2007 itself and in the defendant’s office. This is because the fax transmission details show that the signed document was sent out at 9.35am that day. Also, the document does not contain the plaintiff’s company stamp. It is believable that Mr Chew would not have been carrying that stamp around with him on his visit to the defendant’s office when that visit was not planned for the purpose of executing the defendant’s November letter.

  104. [58] The second conclusion is that the documents at 2AB788-789 and 2AB765-766 are the same document and are different from that at 2AB790-791. This is because Mr Chew’s signatures as they appear on 2AB788-789 and on 2AB765-766 are identical. However, the signature on 2AB790-791 is not the same. It would thus seem that 2AB790-791 was signed on a different day from 2AB765-766 and 2AB788-789. The latter two documents are copies of each other: they bear the same handwritten endorsement from Mr Chew and the same handwritten date “11/12/2007”. The only difference between them is that one bears imprints showing that it was faxed out from the plaintiff’s office on 13 December 2007. I infer that what happened was that sometime after 21 November 2007, the defendant passed a second unsigned copy of the defendant’s November letter to the plaintiff as the original signed in the defendant’s office (2AB790-791) did not bear the plaintiff’s stamp. Mr Chew then signed this copy and put the plaintiff’s stamp on it and also his handwritten note. It was then sent out to the defendant. Accordingly, 2AB788-789 is most likely a copy of the document that Mr Chew retained in the plaintiff’s office after signing, stamping and writing his note, whilst 2AB765-766 is the copy that was faxed out to and received by the defendant. So there are two originals of the defendant’s November letter.

  105. [59] Mdm Oh maintained in court that the plaintiff signed the defendant’s November letter on either 11 or 13 December 2007. I think she was mistaken and was misled because the multiple copies of the document in the agreed bundle showed the date of the handwritten note as 11 December 2007 and the fax transmission as having happened on 13 December 2007. Her mistake and lapse of memory are not surprising due to the lapse of time between the event and the hearing and also due to the proliferation of copies of the defendant’s November letter.

  106. The Product Agreements

  107. Did the parties enter Product Agreements?

  108. [61] I move on to the three contracts that the plaintiff called “Product Agreements”. The first Product Agreement concerned valves. On 15 November 2007, the plaintiff sent the defendant a quotation for the supply of valves. The defendant asked for lower unit prices for the valves on 16 November 2007 but this request was rejected by Mr Chew a few days later in a note that said that the prices quoted by the plaintiff were its “best prices base[d] on total package offer”. On 21 November 2007, after Mr Chew had signed the defendant’s November letter in the defendant’s office, Mdm Oh signed the valve quotation. It should be noted that apart from the description of the products, the quantities and the discounts agreed on, the quotation contained terms and conditions.

  109. [62] It is the plaintiff’s position that its valve quotation of 15 November 2007, as accepted by the defendant on 21 November 2007, was a Product Agreement and therefore constituted a separate contract between the parties which was subject to the terms of the Total Package Agreement. The defendant on the other hand says that the purpose of the so-called Product Agreement was simply to fix the prices at which the valves would be sold and to indicate an estimate of the quantities required. The defendant’s position is that the supply of valves was subject to the terms of the Master Contract and, in so far as the terms of the valve or any Product Agreement were inconsistent with the Master Contract, they were not effective.

  110. [63] The second Product Agreement that the plaintiff relies on arose out of a quotation dated 13 December 2007 which the plaintiff gave the defendant for the supply of Fusiotherm PPR Pipes and Fittings (“Fusiotherm quotation”). This Fusiotherm quotation was signed and returned by the defendant on 13 December 2007 with a few amendments endorsed thereon. The plaintiff accepted these amendments.

  111. [64] The third Product Agreement related to the supply of Duker Hubless Pipes and Fittings. The plaintiff sent the defendant its second quotation for these items on 12 December 2007 and the defendant signed the same and returned it to the plaintiff on the same day. The plaintiff says that this led to the formation of a Product Agreement for Duker Hubless products.

  112. [66] Each of the quotations sent out by the plaintiff contain terms and conditions. The terms and conditions contained in the valve quotation are as follows:

  113. [70] Secondly, it was contended that Mdm Oh had admitted that orders had been placed by way of the Product Agreements. On 15 January 2008, the plaintiff had asked the defendant if it could proceed with the delivery of the Duker Hubless pipes and fittings in accordance with the schedule supplied by the defendant. The defendant’s response the next day was that it was still waiting for confirmation from the management of the Project about the availability of a container to store the defendant’s stock and that once it had received the confirmation, the plaintiff would be able to make the delivery. The plaintiff pointed out that in court Mdm Oh had accepted that if no orders had been placed, there would be no stock to store and this admission, the plaintiff said, would lead to the inescapable conclusion that at the material time the defendant was of the view that orders had been placed for Duker Hubless pipes and fittings.

  114. [72] Indeed, Mdm Oh explained that to her “Product Agreement” meant “this product, this agreement, meaning the details of the products that are required from the other party” and that “agreement” meant “contract”, and the two words “product” and contract” together meant the Master Contract. I accept this submission of the defendant as to the meaning that Mdm Oh gave to “Product Agreement”. I also accept that as far as Mdm Oh was concerned, when she signed the various quotations, she was accepting prices of products that would be purchased in accordance with the terms of the Master Contract. Mdm Oh’s evidence was that she was signing to accept the prices set out in the quotations and that her understanding at the time of signing these documents was that:

  115. (a) According to the Master Contract, all quantities provided by the plaintiff were estimates pursuant to the Estimated Quantities Clause.

  116. (c) She was only indicating that the quantities set out in the quotations accurately reflected the correct prices and discounts as discussed between the parties and her concern was to confirm that the quantities matched the BQs then in the defendant’s possession. However, the quantities were to be subject to both the Estimated Quantities Clause and the Fixed Price Clause.

  117. (d) The use of the products as specified in each of the quotations was subject to the consultants’ approval as stated in the Approval Clause in the Master Contract and therefore any quantities provided could not be final.

  118. [73] It is significant that none of the plaintiff’s quotations were signed and accepted by the defendant until after the plaintiff had signed the defendant’s November letter and thereby accepted the terms of the Master Contract. Mdm Oh was very clear as to what the terms of the Master Contract entailed. These were the terms on which the defendant was prepared to purchase products from the plaintiff. The plaintiff’s position was that the Master Contract was signed on the morning of 21 November 2007 and, this being the case, it cannot deny that the conclusion of the Master Contract preceded the acceptance of all the quotations.

  119. [74] The plaintiff made much of the fact that Mdm Oh did not object to those terms of the quotations that were inconsistent with the Master Contract. Her explanation for that, which I accept, is that she considered that they were invalid because the governing contract was the Master Contract.

  120. [77] I also accept the defendant’s submission that when in September 2008 the defendant requested that markings be placed on the products that the plaintiff had prepared for use in the Project, this was not a confirmation that orders had already been placed. It was provided under the Master Contract that the plaintiff was to hold buffer stock amounting to 10% of the estimated quantities. Given that, any markings on the goods in the plaintiff’s warehouse would not necessarily have been evidence of orders having been placed.

  121. [84] It was clear from the above evidence that Mr Chew understood that quantities provided prior to the “final confirmation” were not firm and could be varied.

  122. [85] Second, the plaintiff’s letter of 14 January 2008 to the defendant sets out the situation at the time quite plainly. It is apparent from this letter that:

  123. [87] There was also contemporaneous correspondence between the plaintiff and its suppliers which indicated that the plaintiff was aware that the quantities provided were merely estimates. At some point Mr Chew told his suppliers that the quantities he was giving them were only estimates. He also told them that one of the conditions for the defendant’s orders was that price would have to remain the same throughout the Project until completion regardless of any changes in quantities or sizes of products. Mr Chew explained that he was trying to negotiate for lower prices with his principals and that is why he advised them that competition was stiff and quantities were estimates but prices had to be fixed. In dealing with its suppliers, the plaintiff used the language of the Fixed Price Clause and the Estimated Quantities Clause and there is force in the defendant’s submission that it did so because it was similarly bound to the defendant. The plaintiff’s attempt to hold its suppliers to the same terms as imposed on him by the defendant shows that the defendant’s terms were not commercially unreasonable as the plaintiff had protested in court.

  124. [88] In any event, it is clear from the contemporaneous correspondence that all products which the plaintiff sent quotations for were subject to the approval of the consultants and the owner of the Project. The Approval Clause is found only in the Master Contract. It does not appear in the alleged Product Agreements. None of the products in the quotations were approved before the Products Agreements were entered into. The very fact that the plaintiff acknowledged that the Approval Clause applied shows its recognition that the contractual terms were not contained in the quotations.

  125. Exceptions to the Material Order Form position

  126. Material Order Forms endorsed “deduct from IR stock”