Beyonics Technology Ltd and another v Goh Chan Peng and others

Feedback & support

[2016] SGHC 120Case no. Suit No 672 of 2013

What happened, in plain English

There is no plain-English summary of this judgment yet.

Ask about this judgment

Grounds of decision

Official text from eLitigation

  1. Introduction

  2. [1] The first defendant, Mr Goh Chan Peng (“Mr Goh”), was a former director and chief executive officer (“CEO”) of the plaintiffs (“the Plaintiffs”). The Plaintiffs allege that Mr Goh had breached various duties owed to them and further engaged in a conspiracy with the third defendant, Wyser International Limited (“Wyser International”), and a competitor to injure the Plaintiffs. Mr Goh’s wrongdoing purportedly resulted in the diversion of certain business with a customer to the competitor and culminated in the loss of the entire business with the customer. For the role Mr Goh played, he allegedly received two payments from the competitor via Wyser International, which dishonestly assisted in Mr Goh’s breach of duties. The First Plaintiff’s claims relate to the loss of the customer’s business (in part and in whole) and the two payments made. Separately, the Second Plaintiff claims against Mr Goh for unjustified expenses and salary.

  3. [2] In response, the defendants (“the Defendants”) deny that Mr Goh was in breach of duties and maintain that he acted in the best interests of the Plaintiffs at all times. While Mr Goh does not deny that he received payments from the competitor, he claims that they were for consultancy services provided to the competitor. Further, there was no conspiracy between Mr Goh, Wyser International and others to injure the Plaintiffs. Wyser International did not dishonestly assist in the breach of his duties. The loss of the customer’s business, in whole or in part, was not caused by them. Finally, the expenses and salary were justified.

  4. [3] The trial dealt with both liability and quantum. It was heard over 19 days in August and September 2015, with written submissions filed in November and December 2015. I now deliver my judgment.

  5. Background Facts

  6. Parties, entities and persons

  7. [4] To begin, I set out the background facts of this case. The first plaintiff, Beyonics Technology Ltd (“the First Plaintiff”), is a company incorporated in Singapore on 9 November 1994. It was listed on the Singapore Stock Exchange on 30 August 1995. In February 2012, Channelview Investments Ltd (“Channelview”), a company incorporated in the British Virgin Islands, completed its acquisition of the First Plaintiff and became its sole shareholder. The First Plaintiff was delisted on 15 February 2012.

  8. [5] The First Plaintiff has wholly owned subsidiaries in many countries. The second plaintiff, Beyonics International Pte Ltd (“the Second Plaintiff”), is one such subsidiary. Collectively, the First Plaintiff and its subsidiaries shall be referred to as the “Beyonics Group”. The Beyonics Group is engaged in a variety of businesses. In particular, its precision engineering division (“PE Division”) manufactures (inter alia) baseplates, which are key components of hard disk drives (“HDDs”). The PE Division comprises the following subsidiaries:

  9. (a) Beyonics Precision Engineering Pte Ltd, which is incorporated in Singapore;

  10. (b) Beyonics Precision Machining Sdn Bhd (“BPM”), which is incorporated in Malaysia, and runs a plant in Tampoi, Johor Bahru, Malaysia;

  11. (c) Wealth Preview Sdn Bhd (“Wealth Preview”), which is incorporated in Malaysia;

  12. (d) Beyonics Technology (Thailand) Co Ltd (“BTT”), which is incorporated in and ran a plant in Thailand;

  13. (e) Beyonics Technology Electronic (Changshu) Co Ltd (“BTEC”) which is incorporated in China and runs a plant in Changshu, Suzhou, China; and

  14. (f) Beyonics Asia Pacific Limited (“BAP”), which is incorporated in Mauritius.

  15. [6] While there are four defendants in this suit, substantively, the action is against Mr Goh and Wyser International. From 1 May 2000, Mr Goh was the director and CEO of the Plaintiffs, as well as the CEO of the Beyonics Group. He resigned on 9 January 2013. Wyser International and the fourth defendant, Wyser Capital Limited (“Wyser Capital”), are companies incorporated in the British Virgin Islands. The companies are beneficially owned and controlled by Mr Goh. There is no substantive case against Wyser Capital. Nor is there any substantive claim against the second defendant, Mdm Lee Bee Lan (“Mdm Lee”), who is Mr Goh’s wife. They were sued mainly for the purpose of a Mareva injunction application filed earlier by the Plaintiffs. I shall make no further mention of Mdm Lee and Wyser Capital in the judgment.

  16. [7] It is also necessary to introduce the “competitor” of the Beyonics Group mentioned in [1]. Nedec Co Ltd (“NEDEC”) and Kodec Co Ltd (“KODEC”) are both companies incorporated in South Korea. Together with other associated companies, they shall be referred to as the “NEDEC/KODEC Group”. The NEDEC/KODEC Group is also involved in the precision engineering business, including the manufacturing of baseplates for HDDs. In particular, one of its entities, Langfang NEDEC Machinery & Electronics Co Ltd (“LND”), has a baseplate manufacturing facility located in Hebei, China. Mr Tae Sung Lee (“Mr Tony Lee”) is the chief financial officer (“CFO”) and managing director of the NEDEC/KODEC Group, while Mr Hwang Sejoon (“Mr Stephen Hwang”) is the CEO of the same.

  17. [8] The “customer” of the Beyonics Group described in [1] is Seagate Technology International (“Seagate”), one of the largest manufacturers of HDDs, and a key customer that purchased baseplates from the PE Division of the Beyonics Group. Mr Billy Chua is the Senior Manager of the Asia Commodity Management Team at Seagate. He was the main point of contact with the Beyonics Group and the NEDEC/KODEC Group at the relevant time.

  18. Key events

  19. Manufacturing of baseplates for Seagate

  20. [9] I now set out the key events relevant to the present suit. From about 1987, Seagate began purchasing baseplates from the Beyonics Group. When Channelview was in the process of acquiring the First Plaintiff in early October 2011, Seagate remained an important customer of the First Plaintiff.

  21. [10] At this juncture, I briefly explain the process of manufacturing baseplates for Seagate. Broadly speaking, this can be divided into two main stages: the “First Stage Work” and the “Second Stage Work”. The First Stage Work involves processes such as die-casting, and ends with e-coating so as to produce “e-coated baseplates”. The Second Stage Work involves, among other things, precision machining and other works on the e-coated baseplates leading to the production of the “finished baseplates” supplied to Seagate.

  22. [11] Seagate baseplates are produced under various programmes, each having its own specifications. To be able to supply baseplates to Seagate for a particular programme, a supplier must undergo a qualification process. Over the years, the Beyonics Group has achieved qualification to perform both the First and Second Stage Work for numerous Seagate baseplate programmes, and supplied finished baseplates to Seagate. A programme known as “Brinks 2H” is the programme at the centre of the case.

  23. Floods in Thailand and the aftermath

  24. [12] In October 2011, a major disruption to the global HDD business occurred. Severe floods in Thailand caused serious destruction to the facilities of many HDD manufacturers and component suppliers. BTT’s factory, the Beyonics Group’s baseplate manufacturing facility in Thailand (see [5(d)]), was not spared and had to be shut down.

  25. [13] After the disaster, Seagate was anxious to secure capacity from the HDD component suppliers to supply baseplates for its HDDs. It reached out to its suppliers to assist. What transpired among Seagate, the Beyonics Group and the NEDEC/KODEC Group in the aftermath of the Thailand floods is heavily disputed, especially in relation to Mr Goh’s role from October 2011 to 24 November 2011. I shall return to these disputes in due course.

  26. The B–N Alliance

  27. [14] On 24 November 2011, at a meeting between Mr Billy Chua, Mr Tony Lee and Mr Goh, Seagate approved of a new collaboration between the Beyonics Group and the NEDEC/KODEC Group. This collaboration shall be referred to as the “B–N Alliance”.

  28. [15] On 10 January 2012, the B–N Alliance was encapsulated in an agreement between BAP, a subsidiary of the Beyonics Group (see [5(f)]), and LND, a subsidiary of the NEDEC/KODEC Group (see [7]) (“the BAP–LND Contract”). In relation to the manufacture of Seagate baseplates for the Brinks 2H programme, it was agreed that BTEC, the Beyonics Group’s plant in Changshu, China (see [5(e)]), would complete the First Stage Work to produce e-coated baseplates for supply to LND. LND would then perform the Second Stage Work, produce the finished baseplates and sell them to Seagate. From January 2012 to January 2013, the Beyonics Group duly supplied e-coated baseplates to the NEDEC/KODEC Group.

  29. The Wyser Agreements

  30. [16] From 24 November 2011, there were negotiations concerning agreements to be entered into between the NEDEC/KODEC Group and Wyser International connected to the B–N Alliance. On 5 April 2012, two agreements were signed by Mr Goh, on behalf of Wyser International, and Mr Tony Lee of the NEDEC/KODEC Group. Both were backdated to 24 November 2011 (“the Wyser Agreements”). The first of these agreements (“the First Wyser Agreement”), entered into with KODEC, provided for a payment of US$0.02 per e-coated baseplate as follows:

  31. [17] The second agreement (“the Second Wyser Agreement”), signed with NEDEC, provided as follows:

  32. [18] By a third agreement, US$300,000 of the US$500,000 payable to Wyser International under the Second Wyser Agreement was to be transferred to Mr Stephen Hwang. The third agreement was apparently not signed.

  33. Termination as supplier to Seagate

  34. [19] The Beyonics Group’s sales to Seagate steadily declined from about Financial Year (“FY”) 2012. In FY 2014, being the accounting period beginning 1 August 2013 and ending 31 July 2014, Seagate had terminated the Beyonics Group as its supplier of baseplates for Seagate HDDs. Thus, the Beyonics Group lost the entirety of its baseplate business for both the First and Second Stage Works with Seagate.

  35. Summary of the cases

  36. The Plaintiffs’ case

  37. [20] I now set out the Plaintiffs’ case as pleaded in the Statement of Claim (Amendment No. 1) (“the Amended Statement of Claim”).

  38. [21] The First Plaintiff relies on several causes of action. First, according to the First Plaintiff, Mr Goh, as director and CEO, owed contractual, statutory and fiduciary duties to the Plaintiffs. In breach of these duties, Mr Goh committed acts which fell within four somewhat overlapping areas:

  39. (a) Securing the B–N Alliance. Mr Goh entered into the BAP–LND Contract, which concretised the B–N Alliance, effecting a diversion of business (Second Stage Work for Brinks 2H baseplates) away from the Beyonics Group.

  40. (b) Procuring a US$2.5 million grant from Seagate (“the Seagate Grant”). Mr Goh procured the Seagate Grant for the NEDEC/KODEC Group, thus assisting to boost its technical capabilities, and facilitating its growth as a supplier of baseplates for Seagate HDDs.

  41. (c) Receiving payments under the Wyser Agreements. For his role in diverting e-coated baseplates, payment was made under the First Wyser Agreement based on US$0.02 per e-coated baseplate diverted from the Beyonics Group to the NEDEC/KODEC Group. For his role in procuring the Seagate Grant under the Second Wyser Agreement, Mr Goh received a net gratification of US$200,000.

  42. (d) Facilitating the NEDEC/KODEC Group’s business with Seagate. Mr Goh further facilitated the NEDEC/KODEC Group to undertake business with Seagate in competition with the Beyonics Group, and the ultimate intention was for the NEDEC/KODEC Group to supplant the Beyonics Group in the supply of baseplates to Seagate. This included assisting the NEDEC/KODEC Group to develop e-coating capabilities to carry out First Stage Work, and aggressively pushing for the sale of BTEC to the NEDEC/KODEC Group, which would further strengthen the latter.

  43. [22] Second, the First Plaintiff claims that Wyser International dishonestly assisted Mr Goh’s breaches of fiduciary duties and/or knowingly received the payments under the Wyser Agreements.

  44. [23] Third, the First Plaintiff contends that Mr Goh, Wyser International and the NEDEC/KODEC Group conspired by unlawful means to injure the First Plaintiff and its subsidiaries, with the ultimate intention of hollowing out the baseplate production capacity of the Beyonics Group in favour of the NEDEC/KODEC Group.

  45. [24] The First Plaintiff’s various wholly owned subsidiaries within the PE Division supplied the baseplates to Seagate, and the revenue from all these contracts were recognised in the accounts of BAP. As the holding company, the First Plaintiff claims against Mr Goh and Wyser International, inter alia, equitable compensation for its losses of profits as follows:

  46. (a) Loss of profit as a result of the diversion of the Second Stage Work to the NEDEC/KODEC Group from January 2012 to January 2013 (“Diversion Loss”).

  47. (b) Loss of profit as a result of the loss of future baseplate business from Seagate (“Total Loss”).

  48. [25] In relation to the payments under the Wyser Agreements, the First Plaintiff also claims against Mr Goh and Wyser International, among other things, for an account of the amounts received and payment of the amounts.

  49. [26] Separately, the Second Plaintiff alleges that in breach of his duties, Mr Goh caused or instructed staff members to make unjustified expense claims amounting to S$126,967.45 and HK$38,400.00 against the account of the Second Plaintiff, and claims for a payment of these amounts. Further, the Second Plaintiff claims that it is entitled to recover unjustified salary of S$45,900 paid to Mr Goh from 10 January to 31 March 2013, after Mr Goh’s resignation on 9 January 2013, because Mr Goh did not disclose his breaches of duties.

  50. The Defendants’ case

  51. [27] In the Defence and Counterclaim (Amendment No 1) (“the Amended Defence”), the Defendants deny the breaches of contractual, statutory and fiduciary duties by Mr Goh, dishonest assistance and/or knowing receipt by Wyser International, and that Mr Goh and Wyser International had conspired by unlawful means with the NEDEC/KODEC Group to injure the Plaintiffs.

  52. [28] In relation to the four areas of alleged misconduct relied on by the First Plaintiff, the Defendants’ broad positions are as follows:

  53. (a) Securing the B–N Alliance. Seagate was the one who proposed that the Beyonics Group partner the NEDEC/KODEC Group. Further, there was already a commercial relationship between Seagate and the NEDEC/KODEC Group from around April 2011.

  54. (b) Procuring the Seagate Grant. Mr Tony Lee secured the Seagate Grant for the NEDEC/KODEC Group, not Mr Goh.

  55. (c) Receiving payments under the Wyser Agreements. Prior to agreeing to the B–N Alliance, Mr Goh visited the LND factory and found that the NEDEC/KODEC Group needed to make improvements to meet Seagate’s requirements for the Brinks 2H programme. Mr Tony Lee asked Mr Goh to provide consultancy services to the NEDEC/KODEC Group for such improvements. He agreed to do so and was duly paid under the Wyser Agreements. The payments were not bribes but payments for consultancy services provided.

  56. (d) Facilitating the NEDEC/KODEC Group’s business with Seagate. The NEDEC/KODEC Group was capable of undertaking both the First and Second Stage Works for the manufacturing of baseplates, and Mr Goh did not assist to develop such capabilities. Mr Goh also did not insist on taking charge of the proposed sale of BTEC. Instead, the sale was always subject to the review and approval of the Board of Directors. Therefore, he did not facilitate the NEDEC/KODEC Group’s business with Seagate.

  57. [29] In relation to the claims by the Second Plaintiff, Mr Goh contends that the expenses claimed were incurred in the best interests of the operations and staff of the Second Plaintiff. Mr Goh, as the CEO, had the authority to incur the expenses claimed. The Second Plaintiff is also not entitled to recover the salary justifiably paid to Mr Goh. Instead, Mr Goh counterclaims S$17,000 from the Second Plaintiff for salary still unpaid to him for April 2013.

  58. [30] Further or in the alternative, Mr Goh states that he acted honestly and reasonably at all times. Specifically, it is pleaded that under s 391 of the Companies Act (Cap 50, 2006 Rev Ed), Mr Goh ought to be excused from liability for negligence, default or breach of duty, if any.

  59. The trial

  60. [31] At the trial, the main witnesses for the Plaintiffs were Mr Kyle Arnold Shaw Jr (“Mr Shaw”) and Mr Gerhard Hans-Joachim Christoph Mueller (“Mr Mueller”) (who were both appointed as directors of the First Plaintiff after its acquisition by Channelview), Mr Michael Ng (who replaced Mr Goh as the CEO of the First Plaintiff), and Mr Lee Leong Hua (who is the general manager of BTEC). Mr Goh and Mr Tony Lee were the key witnesses for the Defendants, while Mr Billy Chua was subpoenaed as a witness for the Defendants. There were also two expert witnesses, one each for the Plaintiffs and the Defendants, who dealt with the quantification of the losses allegedly suffered by the Plaintiffs. I shall deal with the relevant portions of the witnesses’ evidence when discussing the specific issues in contention.

  61. [32] I should highlight at the outset that the Plaintiffs had to recover email communications between Mr Goh and the NEDEC/KODEC Group through digital forensics. These emails had been deleted from the desktop computer and the laptop Mr Goh used in his term with the Beyonics Group (“the recovered emails”). In the interlocutory stages of the action, Mr Goh admitted to deleting the emails, but claimed that he had done so because it was the company policy to free up memory space. At the trial, he denied that he had deleted the emails. Instead, he suggested that the deletion might have been the result of reformatting carried out as a matter of standard procedure after he resigned. However, the Plaintiffs’ position is that the reformatting of Mr Goh’s devices had not been carried out so as to enable forensic recovery of evidence. Mr Goh has not challenged this.

  62. [33] I shall set out my views on Mr Goh’s credibility at [180] onwards, along with my observations of the other witnesses. For now, it suffices to comment that the recovered emails, together with other emails, form a contemporaneous record of the developing relationship between Mr Goh and the NEDEC/KODEC Group, the discussions between them, and the nature of certain transactions. The emails provide the invaluable context to understand the unfolding events, and I rely on them extensively to arrive at my findings.

  63. Preliminary issue – an unpleaded defence

  64. [34] I turn to deal with a preliminary issue. In the Defendants’ closing submissions, counsel for the Defendants, Mr Ng Lip Chih, argues that in view of the Plaintiffs’ express admission in the Amended Statement of Claim that the revenue from the baseplate contracts with Seagate was recognised in the accounts of BAP (see [24]), BAP, rather than the First Plaintiff, should be the proper party to claim for any damages and/or losses of profit arising from the alleged breaches by Mr Goh. It would be erroneous at law to equate a loss of profits incurred by BAP to a loss of profits by the First Plaintiff. At best, the First Plaintiff would have a claim for loss of dividends flowing from BAP to the First Plaintiff. However, there was no quantification of such a loss. Therefore, Mr Ng Lip Chih submits that the First Plaintiff’s claims against the Defendants must fail. In the Plaintiffs’ reply submissions, counsel for the Plaintiffs, Ms Marina Chin, makes two points. First, she contends that the defence has never been pleaded, and should be disregarded. Second, she argues that the defence is in any case unmeritorious. I shall deal with these points in turn.

  65. [35] It is uncontroversial that pursuant to O 18 r 8(1)(a) of the Rules of Court (Cap 322, R 5, 2014 Rev Ed) (“ROC”), a party, in any pleading subsequent to a statement of claim, is required to specifically plead any matter which “he alleges makes any claim … of the opposite party not maintainable”. A defence that BAP, and not the First Plaintiff, is the proper party should be specifically pleaded, as it is clearly intended to render the First Plaintiff’s claim unsustainable. Alternatively, the defence should have been pleaded because it is a matter “which, if not specifically pleaded, might take the opposite party by surprise” (see O 18 r 8(1)(b) of the ROC). It is trite that if pleadings are not sufficiently specific, the courts may not allow the party to pursue a certain line of argument (see Tan Kia Poh v Hong Leong Finance Ltd [1993] 3 SLR(R) 429 at [30] and [33]).

  66. [36] Apart from the matter not being pleaded, I note that it is not even contained in any of the affidavits of evidence-in-chief (“AEICs”) filed by the Defendants’ witnesses. Mr Ng Lip Chih alluded to this argument only on the first day of the trial, during the cross-examination of Mr Shaw. This drew an immediate objection by Ms Marina Chin on the ground that the defence has not been pleaded. Mr Ng Lip Chih acknowledged this, and did not touch on this point again for the rest of the trial. In addition, no step was taken to seek leave of court to further amend the Amended Defence so as to include this defence. In these circumstances, I am of the view that the Defendants should not be allowed to rely on this argument at all.

  67. [37] In any event, I agree with Ms Marina Chin that the defence is substantively flawed. The First Plaintiff’s claims have always been for its own losses as the holding company of all the subsidiaries in the PE Division. It did not seek to equate the losses of BAP with its own losses, as the Defendants claim. As will be seen at [192] onwards, in computing the alleged losses, the First Plaintiff relied on financial information on a consolidated basis, and did so from the perspective of the First Plaintiff (and not its subsidiaries). There is nothing to show that the First Plaintiff is not in the position to direct and control the application of the cash and profits of its subsidiaries, including BAP. Therefore, I find that the First Plaintiff is able to pursue the claims. I should add that had this matter been pleaded, the First Plaintiff could have simply taken steps to add BAP to the action, if at all necessary.

  68. The First Plaintiff’s claims for breaches of duties

  69. [38] With that, I move on to the substantive claims by the First Plaintiff, beginning with Mr Goh’s purported breaches of duties. Given that the First Plaintiff pleads breaches of contractual, statutory and fiduciary duties, analytically, there are three distinct causes of action grounded in contract, tort and equity respectively. Broadly speaking, the elements to be proved are the existence of the duties, the breaches of these duties, and the breaches causing the losses allegedly suffered.

  70. [39] On the existence of the duties, as pleaded in the Amended Statement of Claim, the contractual, statutory and fiduciary duties owed to the First Plaintiff largely overlap. To prove the breaches of these three categories of duties, the First Plaintiff cites the same alleged misconduct. However, to establish causation, the First Plaintiff relies principally on the equitable principles applicable to breaches of fiduciary duties. The remedies elected are also primarily equitable ones. From the Plaintiffs’ closing submissions, it seems clear to me that the First Plaintiff’s case rests mainly on the equitable basis. Therefore, for the purpose of this judgment, my primary focus is on the breaches of fiduciary duties. If these are established, there will be no practical need to consider the alleged breaches of contractual and statutory duties.

  71. Duties owed by Mr Goh

  72. [40] The company–director relationship is a well-established category of fiduciary relationship. It is not seriously disputed (nor do I think it can be seriously disputed) that Mr Goh, as a director and the CEO of the Plaintiffs, owed fiduciary duties to the Plaintiffs. In my view, Mr Goh owed these four overlapping duties which are pleaded in the Amended Statement of Claim:

  73. (a) Duty to act honestly and bona fide in the best interest of the First Plaintiff. In this regard, it has been stated that “[d]irectors … may only consider the interests of their company when making a decision. Their overriding motive must be to advance the company’s interests”: see Walter Woon on Company Law (Sweet & Maxwell Asia, 3rd Ed, 2009) (“Walter Woon on Company Law”) at para 8.16.

  74. (b) Duty to avoid and disclose conflicts of interest. Flowing from the duty to act honestly and in the best interests of the company, a director should not “place himself in a position where his duty and his interest conflict”, such that there is a risk that he prefers his personal interest over that of the First Plaintiff: see Walter Woon on Company Law, at para 8.37 and 8.43.

  75. (c) Duty not to make any secret or improper profit. This is a particular instance of the rule against conflicts of interest. As stated in Walter Woon on Company Law at para 8.45, this rule “is so strict that if an opportunity to make a profit or obtain a benefit comes to him because he is a director, that profit or benefit must be disclosed to the company and approved. In the absence of such disclosure and approval, the director is liable to account for that profit even if he has been guilty of no moral wrong.”

  76. (d) Duty to disclose wrongdoing. Encompassed within the duty to act bona fide in the best interests of the company is a duty on the fiduciary to disclose his wrongdoing to the company. In Quality Assurance Management Asia Pte Ltd v Zhang Qing [2013] 3 SLR 631 (“Quality Assurance”) at [97], the High Court cited Item Software (UK) Ltd v Fassihi [2004] EWCA Civ 1244 at [41]–[44] for the proposition that “[a]n employee who is also a fiduciary and who owes his employer a general fiduciary duty of loyalty – that is, a duty to act in good faith in the best interests of his employer – is obliged pursuant to that general duty to disclose his own wrongdoing to his employer”.

  77. [41] For completeness, I should add that ss 156, 157(1) and 157(2) of the Companies Act impose statutory duties on directors, largely similar in scope and extent to the abovementioned fiduciary duties. In particular, as observed by the Court of Appeal in Townsing Henry George v Jenton Overseas Investment Ptd Ltd [2007] 2 SLR(R) 597 at [59], s 157(1) of the Companies Act (which inter alia imposes a duty on a director to act honestly in the discharge of duties of his office) is the “statutory equivalent of the duty to act bona fide which exists at common law” [emphasis in original]. I also find that the employment contracts impose similar express or implied duties on Mr Goh. Nonetheless, as I stated at [39], it is unnecessary to go into these matters in any depth.

  78. Whether the alleged acts were committed

  79. [42] I proceed to consider whether Mr Goh committed the alleged acts falling into four clusters of events as summarised at [21]. Mr Goh denies the First Plaintiff’s version of the events and attempts to explain how and why, when viewed in context, his actions were in the best interests of the Beyonics Group. I shall discuss the factual disputes before dealing with Mr Goh’s explanations.

  80. Securing the B–N Alliance

  81. [43] The details of the B–N Alliance are set out at [14]. According to the First Plaintiff, after the Thailand floods, Mr Goh either conceived of or facilitated the formation of the B-N Alliance, thus diverting the Second Stage Work to the NEDEC/KODEC Group. However, Mr Goh stated that Seagate had requested the Beyonics Group to partner the NEDEC/KODEC Group.

  82. [44] I observe that Mr Billy Chua was consistent in maintaining (during both examination-in-chief and cross-examination) that it was Seagate which proposed the B–N Alliance. Thus, I accept that Seagate initiated the collaboration. Be that as it may, I find that Mr Goh was instrumental in the process leading to the approval of the B–N Alliance by Seagate, and entry into the BAP–LND Contract. This is borne out by a close examination of the events prior to, and culminating in, a meeting on 24 November 2011.

  83. Growing relationship between Mr Goh and the NEDEC/KODEC Group – June to September 2011

  84. [45] According to the First Plaintiff, in late June 2011, Mr Goh initiated contact with the NEDEC/KODEC Group. Thereafter, he pursued the relationship for his personal benefit. Mr Goh explained that at that juncture, he was in contact with the NEDEC/KODEC Group solely for the sale of BTEC, pursuant to the Beyonics Group’s policy to divest the PE Division (see further discussions from [92] below).

  85. [46] From the emails produced before me, I note that in late June 2011, Mr Goh requested a business contact to introduce him to the NEDEC/KODEC Group. He was introduced to Mr Stephen Hwang, who indicated that he wanted to discuss with Mr Goh about business with Seagate. On 12 July 2011, Mr Stephen Hwang visited BTEC in China. From 4 to 7 September 2011, Mr Stephen Hwang and Mr Tony Lee visited BTT and BPM in Thailand and Malaysia.

  86. [47] After these visits, the parties exchanged a series of emails, which form part of the recovered emails with subject matter headings “Thank you for your favour” and “Appreciation for Hospitality”. On 8 September 2011, Mr Stephen Hwang wrote to thank Mr Goh for “well meant advice [which would] be a great help how Nedec survives in HDD business”. On the same date, Mr Tony Lee sent an email expressing his appreciation for the “warm hospitality”, and stated that he had been informed that Mr Tay Peng Huat, the Chief Financial Officer (“CFO”) of the Beyonics Group, was “going to dispatch the data and information” that Mr Stephen Hwang and Mr Tony Lee had requested. On 30 September 2011, Mr Stephen Hwang extended an invitation to Mr Goh to visit LND, which Mr Goh accepted. Mr Tony Lee sent a reply on 4 October 2011, and expressed appreciation for Mr Goh’s “intention to visit NEDEC factories around Nov. 10”, and saw this as an opportunity for the parties to engage in “further talks for co-operation and collaboration.”

  87. [48] From the above, it is clear that Mr Goh and the NEDEC/KODEC Group were open to pursuing business opportunities together. Even if there was the plan to divest BTEC and the PE Division, it does not seem to have been necessary for Mr Goh, as the CEO of the Beyonics Group, to offer a competitor of the Beyonics Group access to information on the PE Division and arrange factory visits at such an early stage, or to give advice on surviving in the HDD business. There was also no reason for Mr Goh to accept a visit to LND. In my assessment, even in the early days, there was already some indication that Mr Goh pursued the relationship partly in his personal capacity, rather than solely for the Beyonics Group.

  88. Seagate’s preference after the Thailand floods – October 2011

  89. [49] After the floods in Thailand in October 2011, the First Plaintiff claims that Seagate would have preferred to work with its existing suppliers (including the Beyonics Group) to increase production, rather than with a new supplier, as it would take some time for a new supplier such as the NEDEC/KODEC Group to become qualified as a Seagate baseplate supplier. Mr Goh refuted this by stating that the NEDEC/KODEC Group was an existing supplier of Seagate, not a new supplier.

  90. [50] In my view, Mr Goh’s position is misleading. It was not disputed that Seagate acquired Samsung’s HDD business sometime in 2011, and that by virtue of the acquisition, the NEDEC/KODEC Group had become pre-qualified to supply baseplates to Seagate for Samsung HDDs. However, the NEDEC/KODEC Group did not automatically qualify to supply baseplates for Seagate HDDs. Indeed, in October 2011, the NEDEC/KODEC Group was not a supplier of baseplates for Seagate HDDs. Further, Mr Billy Chua’s evidence is that Seagate would have preferred to depend on existing suppliers. He explained that Seagate had stringent standards. It was not simple, quick or certain for a new supplier to obtain qualification for Seagate HDDs.

  91. Level of commitment and support indicated by Mr Goh – mid-October 2011

  92. [51] Against this backdrop, around mid-October 2011, Mr Goh received a telephone call from Mr Billy Chua. According to Mr Goh, it was a brief conversation in which Mr Billy Chua merely asked what the Beyonics Group could do to help and requested for a proposal to support Seagate. Mr Billy Chua gave a different account of the conversation. He said that there was a discussion about the Beyonics Group’s production capacity, with Mr Goh informing him that the Beyonics Group was only able to continue with the supply of three million Brinks 2H baseplates per quarter. Seagate, however, wanted a commitment of more than four million per quarter. On this point, I prefer the evidence of Mr Billy Chua. In my view, Mr Goh under-represented the Beyonics Group’s capacity to produce baseplates at the time, and showed little commitment and willingness to support Seagate. I deal with the production capacity issue from [97] onwards.

  93. Discussions on the B–N Alliance – 24 to 26 October 2011

  94. [52] Sometime on 24 October 2011, Mr Billy Chua contacted Mr Tony Lee for the first time via email to ask whether the NEDEC/KODEC Group wished to participate in Seagate’s baseplate production programme. Later the same day, the parties spoke on the telephone. This conversation was recorded in an email at 5.20pm on the same day from Mr Billy Chua to Mr Tony Lee, indicating that the parties had discussed, inter alia, the Pharaoh 2H (another name for Brinks 2H) baseplate programme. I note that Mr Billy Chua’s initial contact with the NEDEC/KODEC Group came after Mr Goh showed a lack of commitment to Seagate, as described immediately above.

  95. [53] While not stated in the email at 5.20pm, it appears that during the telephone conversation between Mr Billy Chua and Mr Tony Lee, the idea of a potential partnership between the NEDEC/KODEC Group and another baseplate supplier was also discussed. On 25 October 2011, Mr Tony Lee wrote an email to Mr Billy Chua stating that the NEDEC/KODEC Group would prefer to obtain e-coated baseplates for a “machining process service” (ie Second Stage Work), and asked whether it should obtain these for machining from the Beyonics Group, or another supplier, MMI. He also asked to meet Mr Billy Chua. Replying on the same day, Mr Billy Chua confirmed a meeting in Singapore on 27 October 2011 from 9am to 4pm to discuss matters.

  96. [54] On 26 October 2011, Mr Tony Lee sent an email to Mr Goh informing him of the full day meeting with Seagate confirmed for 27 October 2011. He stated that issues to be discussed might include a “‘[j]oint operation’ of your Changsu (sic) factory” (ie BTEC). He asked to meet Mr Goh on 28 October 2011. When cross-examined, Mr Goh said that he did not know what Mr Tony Lee wanted to discuss with him, and he had no clue what the “joint operation” meant. Mr Goh insisted that he only found out about the B–N Alliance from Mr Billy Chua over the telephone on 27 October 2011. However, Mr Tony Lee testified that “joint operation” referred to the proposal for the Beyonics Group to supply e-coated baseplates to the NEDEC/KODEC Group.

  97. [55] From Mr Tony Lee’s email of 26 October 2011 and his evidence, the clear inference I arrive at is that Mr Goh had already spoken to Mr Tony Lee about the proposed B–N Alliance ie the “joint operation” before the email on 26 October 2011. In fact, in Mr Goh’s reply to the 26 October 2011 email, he simply agreed to a meeting on 28 October 2011, without asking any question as to what the “joint operation” meant, rendering his version quite incredible. I should add that the 26 October 2011 email between Mr Tony Lee and Mr Goh formed part of the recovered emails, and carried the subject matter heading “BTEC”.

  98. Meeting between Seagate and the NEDEC/KODEC Group – 27 October 2011

  99. [56] At 8.50 am on 27 October 2011, a mere ten minutes before Seagate was to meet Mr Tony Lee of the NEDEC/KODEC Group for the first time, Mr Goh sent a critical e-mail to Mr Billy Chua claiming that “due to having major losses in PE division; our investment is limited and we could only exercise limited investment strategy to help the current demand faced by our customers” [emphasis added]. This was purportedly Mr Goh’s response to Mr Billy Chua’s request for a proposal from the Beyonics Group to support Seagate. In cross-examination, Mr Goh accepted that when he sent this email, that he was aware that the 27 October 2011 meeting was due to commence, and that the NEDEC/KODEC Group was keen to do business with Seagate.

  100. [57] After the meeting on 27 October 2011, Mr Billy Chua sent an email to Mr Tony Lee including the minutes of the meeting. The minutes reflected that Seagate had agreed to a plan for a partnership between the Beyonics Group and the NEDEC/KODEC Group to produce baseplates, specifically for the NEDEC/KODEC Group to use the Beyonics Group’s e-coated baseplates for the Brinks 2H programme (essentially the terms of the B–N Alliance). The email also stated that Mr Billy Chua had earlier spoken to Mr Goh, who had “no objection[s]”. Mr Goh, however, insisted that the first time he heard about the proposed B–N Alliance was over the telephone from Mr Billy Chua after his email at 8.50am and after the meeting on 27 October 2011. When confronted with Mr Billy Chua’s email recording the minutes of the meeting, he said he did not know “how [Mr Billy Chua] records his minute[s]”.

  101. [58] As stated at [55], I find that well before 27 October 2011, Mr Goh knew about Seagate’s proposal from Mr Tony Lee. It seems to me that Mr Goh’s email at 8.50 am, and his indication of support of the partnership, were aimed at prompting Seagate to proceed to give approval for the B–N Alliance.

  102. Meeting between Mr Goh and the NEDEC/KODEC Group – 28 October 2011

  103. [59] On 28 October 2011, Mr Goh met Mr Tony Lee and agreed that the Beyonics Group would participate in the proposed B–N Alliance, even though the parties had not even discussed fundamental terms such as pricing.

  104. Mr Goh’s visit to LND – 10 November 2011

  105. [60] On 10 November 2011, Mr Goh visited LND. According to Mr Tony Lee, the B–N Alliance was discussed during this meeting. Mr Goh also suggested making improvements for the NEDEC/KODEC Group to achieve qualification to do the Second Stage Work for Seagate. While travelling from Tianjin to Beijing in a three-hour car ride with Mr Tony Lee and Mr Stephen Hwang (“the car journey”), Mr Tony Lee said he proposed that Mr Goh be compensated for his consultancy services. Mr Goh did not say anything.

  106. [61] Mr Goh, however, disagrees with Mr Tony Lee’s account of what transpired. In cross-examination, Mr Goh insisted that his visit to LND was regarding the sale of BTEC, and did not involve discussions regarding the B–N Alliance. He claimed that the Beyonics Group, as the vendor of BTEC, was obliged to visit LND, a potential purchaser of BTEC, to “understand the capability and integration between their plant [and] our plant after the completion of the process”, and to make sure the NEDEC/KODEC Group was getting a good deal.

  107. [62] It is plain that Mr Goh’s evidence that the visit was for the sale of BTEC is unbelievable. There is no commercial reason for a vendor to assist a potential buyer by ensuring that he was getting a good and suitable deal. Instead, it appears that Mr Goh was evasive and simply refused to reveal details of the visit. In fact, Mr Goh shifted his evidence on the purpose of the LND visit in the course of proceedings. In the Amended Defence, it is pleaded that the visit was “for the purposes of evaluating whether the NEDEC/KODEC Group was able to meet the requirements under the Brink 2H Programme”. In Mr Goh’s AEIC, he stated that he visited LND after Seagate’s confirmation of the B–N Alliance. However, this was not borne out as Seagate’s actual confirmation of the B–N Alliance came about only around 24 November 2011. Then, during the trial, Mr Goh’s evidence was that he visited LND in relation to the sale of BTEC. Ultimately, he conceded the “possibility of a tie-up” being discussed during the visit.

  108. Mr Goh’s meeting with Seagate – 18 November 2011

  109. [63] On 18 November 2011, Mr Goh met Seagate concerning the B–N Alliance. In advance of the meeting, on 16 November 2011, Mr Goh forwarded to Mr Toh Han Chiow (“Mr HC Toh”) a set of presentation slides which were to be used at the meeting. Mr HC Toh is the person Mr Billy Chua reported to within Seagate. Some of the salient points in the presentation slides included information on the substantial loss of equipment at BTT, such that there would be a “shortfall of HDD Base supply for the next 12 months due to shortage of [Computer Numerical Control (“CNC”)] machines and other related equipment for HDD industry”. CNC machines are critical for the Second Stage Work in the production of baseplates. More importantly, in the presentation slides, Mr Goh also pushed for the B–N Alliance.

  110. Meeting of Seagate, the Beyonics Group and the NEDEC/KODEC Group – 24 November 2011

  111. [64] On 24 November 2011, representatives from Seagate, the Beyonics Group and the NEDEC/KODEC Group met at the Seagate office. Seagate gave confirmation of the B–N Alliance.

  112. Findings on the B–N Alliance

  113. [65] Summing up, I have no doubt that Mr Goh was instrumental in the formation of the B–N Alliance, and ultimately the entry into the BAP–LND Contract. While Seagate might have initiated the concept and provided the final approval, Mr Goh, together with the NEDEC/KODEC Group, convinced Seagate to take this course of action, thus bringing on board the NEDEC/KODEC Group as a supplier of baseplates for Seagate HDDs.

  114. Procuring the Seagate Grant

  115. [66] I now move on to Mr Goh’s role in procuring the US$2.5 million Seagate Grant for the NEDEC/KODEC Group. According to the First Plaintiff, Mr Goh procured the Seagate Grant for the NEDEC/KODEC Group. Mr Goh, however, claimed that he only included the NEDEC/KODEC Group’s request as part of the presentation slides to Seagate on 18 November 2011. Otherwise, it was Mr Tony Lee who obtained the Seagate Grant.

  116. [67] Contrary to Mr Goh’s stance, Mr Tony Lee testified that it was Mr Goh who first suggested the idea of the Seagate Grant to him. In an email sent to Mr Billy Chua on 29 October 2011 to update him on the 28 October 2011 meeting between Mr Goh and himself, Mr Tony Lee said that Mr Goh had “advised [him] to ask Seagate to cover [the NEDEC/KODEC Group’s] new tooling expenses which will shorten the necessary [lead time]”. During Mr Goh’s visit to LND on 10 November 2011, Mr Goh repeated this idea. In particular, during the car journey, Mr Goh “gave [them] the idea” of asking Seagate for a grant. Pursuant to this, Mr Goh was asked to assist the NEDEC/KODEC Group to act as an intermediary to obtain the Seagate Grant.

  117. [68] I note that after the LND visit, on 11 November 2011, Mr Tony Lee wrote to Mr Goh, stating that he was waiting “for good news from Seagate and from you.” In reply, Mr Goh said he had not talked to Mr HC Toh about the Seagate Grant yet, but would “talk money” at the “executive discussion” the following week. Thereafter, at the 18 November 2011 meeting between Mr Goh and Seagate, the presentation slides were used to push for the Seagate Grant for the NEDEC/KODEC Group. After the meeting, Mr Goh updated Mr Tony Lee and Mr Stephen Hwang via email with the news that Seagate had given the “go ahead” for the B–N Alliance. Mr Tony Lee replied and asked whether Seagate would be giving the NEDEC/KODEC Group any “concrete” assurance about the Seagate Grant. On 22 November 2011, Mr Goh told him “not worry for the US$2.5m, will get it”. In response, Mr Tony Lee said “so long as you gave us the sign of ‘OK’, I have no doubt about that, sir”. These emails, together with those at [67] above, form part of the recovered emails, and are contained in a thread with the subject matter heading “Re: B-N Alliance Issue”.

  118. [69] In my view, Mr Goh initiated the idea of seeking the Seagate Grant, strategised on how to secure it, and assisted the NEDEC/KODEC Group in obtaining it. In fact, Mr Tony Lee entrusted him with the task. On these aspects, Mr Tony Lee’s evidence is borne out by the email exchanges.

  119. Payments under the Wyser Agreements

  120. [70] I next turn to the payments under the Wyser Agreements. Mr Goh admits that he received payments from the NEDEC/KODEC Group under the Wyser Agreements. It is also undisputed that these were not disclosed to the Board of Directors of the First Plaintiff. However, the parties disagree on the purpose of the Wyser Agreements. Mr Goh contends that the payments were purely for consultancy services he provided to the NEDEC/KODEC Group. The First Plaintiff characterises them as bribes. I now examine the transactions.

  121. The draft Wyser Agreements

  122. [71] On 24 November 2011, a draft Wyser Agreement was forwarded by Mr Goh to Mr Tony Lee. Unfortunately, no copy of this was recovered. According to Mr Tony Lee, it contained a proposal to pay Mr Goh US$20,000 a month for the e-coated baseplates sent from the Beyonics Group to the NEDEC/KODEC Group, as well as a lump sum of US$200,000. Mr Tony Lee separated the terms of draft Wyser Agreement into two documents, and made certain amendments to them. Thereafter, on 20 February 2012, Mr Tony Lee sent Mr Goh the two revised draft Wyser Agreements. The first document provided for the payment of US$0.02 per e-coated baseplate supplied, rather than a lump sum of US$20,000 per month. It also provided for a payment of US$500,000 for Mr Goh’s assistance in securing the Seagate Grant. The second document provided that US$300,000 of the US$500,000 was to be paid out to Mr Stephen Hwang.

  123. The finalised and executed Wyser Agreements

  124. [73] Given the express wording of the Wyser Agreements, I find Mr Goh’s assertion that the payments were for his consultancy services in relation to the improvements required by the NEDEC/KODEC Group to be ludicrous. First, there is no mention of any consultancy services in the Wyser Agreements. If Mr Goh’s version was true, one would expect that the provision of consultancy services would be a key point to be captured. This is especially when Mr Goh had himself provided the draft Wyser Agreement to Mr Tony Lee on 24 November 2011. Although there were subsequent negotiations, there was nothing to show that Mr Goh objected to their contents.

  125. [74] Second, there is absolutely no reason for a consultancy fee to be tied to, and dependent on, the number of e-coated baseplates supplied by the Beyonics Group to the NEDEC/KODEC Group, as was the case under the First Wyser Agreement. Mr Goh explains that his original proposal was for US$20,000 per month to be paid to him, presumably as a flat fee for his consultancy services. He said that the payment of US$0.02 per piece was Mr Tony Lee’s idea. However, again, Mr Goh’s account is unbelievable. Mr Goh estimated that he would spend two to three days a month “resolving his mass production issue for the [NEDEC/KODEC Group’s] baseplate to be accepted by … Seagate”. Compared to his salary of S$45,000 to S$50,000 per month from the Beyonics Group, US$20,000 was an incredible amount for two to three days’ work per month. Instead, the US$20,000 per month proposal seems to accord with the intention that a minimum of one million pieces of e-coated baseplates was to be supplied to the NEDEC/KODEC Group per month, which at US$0.02 per piece works out to be US$20,000. This was precisely Mr Tony Lee’s evidence, which I prefer.

  126. [75] To support his contention that the US$200,000 under the Second Wyser Agreement was for his consultancy services, Mr Goh stated that he did little to assist in procuring the Seagate Grant. However, as discussed above, it is evident that he actively assisted in procuring the Seagate Grant, and the clear provisions of the Second Wyser Agreement provide that the payment of US$200,000 was for such assistance.

  127. Findings on the Wyser Agreements

  128. [76] Upon a review of the evidence, I find that it is patently clear that the Wyser Agreements provided for payments to Mr Goh for his assistance to the NEDEC/KODEC Group in securing business with Seagate, for the supply of e-coated baseplates and to procure the Seagate Grant. In my view, these are appropriately characterised as bribes. I should add that Mr Goh contends that if these were bribes, it would be “silly” of parties to document the transactions. Mr Tony Lee echoed such a sentiment. However, in cross-examination, Mr Goh did not deny that to deal with anti-money laundering concerns, banks might ask for proof to verify the validity of huge transfer of funds. While Mr Goh denied that he was preparing some legal documentation to support the transfer of funds in anticipation of any bank request, I note that in relation to the transfer of the sum of US$300,000 back to Mr Stephen Hwang, Mr Goh provided instructions to the bank, referring to it obliquely as being in relation to a “trade agreement”. Overall, I find that the fact that that the parties documented the transactions by way of the Wyser Agreements did not detract from their improper nature.

  129. Facilitating the NEDEC/KODEC Group’s business with Seagate

  130. [77] With that, I move to the fourth and final area of Mr Goh’s alleged misconduct, which concerns his apparent facilitation of the NEDEC/KODEC Group’s business with Seagate. According to the First Plaintiff, after entry into the B–N Alliance and pursuant to the Wyser Agreements, Mr Goh continued to assist the NEDEC/KODEC Group’s development as a supplier of baseplates for Seagate HDDs. In particular, it is alleged that Mr Goh did the following:

  131. (a) Assisting and procuring the Beyonics Group to help with the NEDEC/KODEC Group’s qualification and performance of the Second Stage Work for Seagate HDDs.

  132. (b) Assisting the NEDEC/KODEC Group in developing the capability for First Stage Work for Seagate HDDs; and

  133. (c) Pushing for the sale of BTEC to the NEDEC/KODEC Group, which would have increased the production capabilities of the NEDEC/KODEC Group.

  134. [78] Mr Goh denies all of the above. His position is that the assistance rendered for the Second Stage Work was to ensure the smooth implementation of the B–N Alliance. Further, the NEDEC/KODEC Group already had the capability to perform First Stage Work, and he did not assist to build such capacity. As for the sale of BTEC, it was always subject to the approval of the First Plaintiff’s Board of Directors. I now deal with the alleged acts in turn.

  135. Assistance to qualify and perform the Second Stage Work

  136. [79] As arranged by Mr Goh, personnel from BTEC were sent to LND on 13 December 2011, 5 January, 14 February, 20 February, 12 April, 22 June, and 30 July 2012. LND’s personnel also visited facilities of BTEC and BPM. In his AEIC and during cross-examination, Mr Lee Leong Hua explained that during visits of BTEC to LND, assistance was provided as follows:

  137. (a) 13 December 2011. BTEC discussed and gave guidance on the production process plan (ie, the flow from raw casting to machining), engineering issues in relation to the Brinks 2H programme, Seagate’s audit process, and the machining process for the Second Stage Work.

  138. (b) 5 January 2012. Mr Lee Leong Hua went to the production floor and identified areas which did not meet Seagate’s requirements for the First and Second Stage Works, as well as areas which were experiencing bottlenecks.

  139. (c) 14 February 2012. BTEC personnel helped LND do “process mapping” of the production line to identify defects that were due to the NEDEC/KODEC Group’s inexperience with Second Stage Work.

  140. [80] In my view, it is clear that Mr Goh rendered assistance to the NEDEC/KODEC Group in relation to the Second Stage Work.

  141. Assistance to develop capability to perform the First Stage Work

  142. [81] Moreover, Mr Goh actively assisted the NEDEC/KODEC Group to develop its capabilities in e-coating, one of the key stages in the First Stage Work. For a start, I note that during a visit to LND on 5 January 2012, Mr Lee Leong Hua said that help was rendered to identify areas which did not meet Seagate’s requirements for both the First and Second Stage Works: see [79(b)]. In addition, there are two further points I wish to raise.

  143. [82] First, Mr Tony Lee and Mr Stephen Hwang were allowed to visit BPM facilities, particularly to view the e-coating facilities. In an email dated 4 March 2012, Mr Tony Lee requested to see BPM’s e-coating factory on 7 March 2012, as the NEDEC/KODEC Group was “really lack[ing] [an] e-coating facility”. In a reply email on the same day, Mr Goh agreed to the visit and stated that “[he] will advise on the ecoating facility”.

  144. [83] Second, Mr Goh also acted as an intermediary between Mr Tony Lee and two vendors to discuss the design of a new “ED Coating Line” for use by KPI, a subsidiary of KODEC, based in the Philippines. The ED Coating Line was to be developed with the specific goal of satisfying Seagate’s requirements. Mr Goh sent the vendors the NEDEC/KODEC Group’s design requirements, had discussions with them, and requested for quotations. It was clear that Mr Goh took an active interest in assisting with the development of the e-coating capabilities of the NEDEC/KODEC Group.

  145. [84] Mr Goh tried to downplay his role by stating that his role as an intermediary was but a “five minutes job”, and that it was “industry practice” to help develop another manufacturer’s e-coating plant. Also, at the end of the day, the NEDEC/KODEC Group did not purchase the ED Coating Line from the two vendors. Nonetheless, at the relevant time, the NEDEC/KODEC Group was still reliant on the Beyonics Group for e-coating capabilities. There was simply no reason for Mr Goh to be assisting a direct competitor to strengthen its e-coating facilities.

  146. Sale of BTEC

  147. [85] Further, the First Plaintiff’s position is that Mr Goh was instrumental in pushing for the sale of BTEC, one of the Beyonics Group’s largest manufacturing plants, to the NEDEC/KODEC Group, in negotiations which were not at arm’s length. Mr Goh disagrees. He explained that there was nothing untoward about the proposed sale of BTEC, as it was in line with the Beyonics Group’s general policy to divest the PE Division.

  148. [86] I note that as early as 26 October 2011, before the NEDEC/KODEC Group had even met Seagate in Singapore, Mr Tony Lee emailed Mr Goh to express interest in the “Changsu (sic) factory”, ie, BTEC. He claimed in that e-mail that this was “another alternative solution for [the NEDEC/KODEC Group] because [it is] currently expanding… [its] HDD business”. Mr Tony Lee explained at trial that this “alternative solution” involved the NEDEC/KODEC Group buying BTEC so that BTEC can do the First Stage Work for the former as well. It should have been clear to Mr Goh that by acquiring BTEC, the NEDEC/KODEC Group would strengthen its capability for First Stage Work.

  149. [87] Thereafter, there was frequent correspondence between Mr Tony Lee and Mr Goh on the sale of BTEC which amounted to a promise by Mr Goh to deal exclusively with the NEDEC/KODEC Group. On 3 January 2012, Mr Goh informed Mr Tony Lee that he had rejected SEMCO, another interested buyer of BTEC, which Tony Lee lauded as a “superb strategy”. At Mr Tony Lee’s request to reject all other buyers and to consider the NEDEC/KODEC Group as a “top priority as agreed [in a meeting in Suzhou on 10 January 2012]” (where the BAP–LND Contract was signed), Mr Goh duly so promised.

  150. [88] In addition, Mr Goh quoted a “friend price” of US$40 million to Mr Tony Lee for the sale of BTEC, which was apparently below the US$50 million the Beyonics Group would have charged SEMCO. Mr Goh also engaged in extensive discussions with Mr Tony Lee, even proposing options for financing the NEDEC/KODEC Group’s acquisition of BTEC.

  151. [89] I should also add that Mr Tony Lee informed Mr Billy Chua of the intended disposition to the NEDEC/KODEC Group. In my view, regardless of whether there was a policy to divest the PE Division, Mr Goh clearly favoured the NEDEC/KODEC Group when attempting to sell BTEC. This led to Business Development Asia LLC (“BDA”) being engaged to be agents for the sale of PE Division, and to Mr Shaw telling Mr Goh in no uncertain terms that all discussions should go through BDA and that Mr Shaw should also be informed. Specifically, Mr Shaw told Mr Goh that this “includes Nedec [which does not have] exclusivity at this time”. Eventually, the NEDEC/KODEC Group did not purchase BTEC.

  152. Findings on facilitating the NEDEC/KODEC Group’s business with Seagate

  153. [90] To sum up, I find that Mr Goh further assisted the NEDEC/KODEC Group to build its capabilities, for both the First and Second Stages of Work, and favoured the NEDEC/KODEC Group when attempting to sell BTEC. The assistance went beyond what was required to implement the B–N Alliance.

  154. Mr Goh’s explanations for his actions

  155. [91] Having dealt with the factual disputes regarding whether the alleged acts were committed, I go to the Defendants’ broad argument that considered in light of the surrounding circumstances, especially the four matters discussed below, Mr Goh acted in the best interests of the Beyonics Group at all times.

  156. Limited investment in the PE Division

  157. [92] First, the Defendants assert that it has long been the policy of the Beyonics Group to make limited investments and to divest the PE Division which was sustaining losses. This allegedly explains Mr Goh’s efforts to dispose of BTEC and his withholding of investments in the PE Division at the material time.

  158. [93] In the email dated 27 October 2011 from Mr Goh to Mr Billy Chua, ten minutes before the first meeting between Seagate and the NEDEC/KODEC Group, Mr Goh mentioned the Beyonics Group’s “limited investment strategy”: see [56]. Mr Goh claims that this strategy had been decided on by the First Plaintiff’s Board of Directors, referring to minutes of meeting of the Board of Directors on 13 December 2011. However, these minutes simply recorded that Mr Goh briefed the Board of Directors on the situation after the Thailand floods, and stated that “as we had decided on limited investments to the PES division, we informed [the HDD OEMs] that they have to provide us with some financial assistance”. The minutes did not shed light on when and by whom this decision was made. In any case, the email of 27 October 2011 was sent before the 13 December 2011 meeting, and Mr Goh could not have been relying on the minutes at that earlier time.

  159. [94] Separately, Mr Goh stated that the decision to make limited investments in the PE Division was made more than ten years ago. In fact, when Mr Goh first joined the Beyonics Group in 2000, the PE Division was already incurring losses. The Board of Directors had decided then to divest the PE Division. During the period in which he was CEO, limited investments were made to the PE Division. However, Mr Goh accepted that there was no record of any such decision by the Board of Directors placed before the court.

  160. [95] This matter was not pleaded in the Defence or raised in Mr Goh’s AEIC. Such a late introduction of a crucial allegation itself casts doubt on the truth of that allegation. Nonetheless, I will proceed to deal with the merits of the argument. The claim that there was a decision more than ten years ago to make limited investment in the PE Division is contradicted by the acquisition of BTEC in 2004. Further, a substantial shareholding in Wealth Preview, also a subsidiary within the PE Division (see [5(c)]), was acquired only in 2008. I therefore do not accept that there was a clear decision made by the Board of Directors of the First Plaintiff to make limited investments in the PE Division such a long time ago.

  161. [96] Even if there was such an earlier decision, given the situation which presented itself after the floods in Thailand, it was incumbent on Mr Goh, as CEO, to consider the appropriate strategy and recommend the best course forward purely in the interests of the Beyonics Group. However, he decided not to indicate commitment and support to Seagate, forged ahead with the B–N Alliance, accepted the payments under the Wyser Agreements and continued to pursue the sale of BTEC rather than consider whether it should be kept within the Beyonics Group, given the loss of BTT. No specific approval was sought from the Board of Directors.

  162. Production capacity for Second Stage Work

  163. [97] Second, Mr Goh contends that the B–N Alliance was for the benefit of Beyonics Group because BTEC had already maximised its production capacity, and could not have undertaken both stages of work. A “realistic maximum production capacity” of BTEC was only about 2.5 to 2.6 million units per month. The First Plaintiff takes a contrary position, and contends that BTEC had the capacity to produce about 3.5 to 3.6 million baseplates per month, and thus had sufficient capacity to carry out the Second Stage Work on the one million e-coated baseplates diverted to the NEDEC/KODEC Group. Further, BTEC could have taken steps to ramp up production, or make capital investments to increase its capacity to meet Seagate’s demands. Once again, Mr Goh’s line of argument in relation to production capacity was not pleaded in the Amended Defence. However, it was raised in Mr Goh’s AEIC, as well as the AEICs of the First Plaintiff’s witnesses, and dealt with extensively at the trial. Thus, I proceed to deal with matter on its merits.

  164. Overall assessment of production capacity

  165. [98] I start by reviewing four documents created near the time of entry into the B–N Alliance regarding BTEC’s production capacity, as well as a series of emails from Mr Lee Leong Hua to Mr Goh from 11 November 2011 to 17 November 2011 (collectively referred to as the “What-If Analysis emails”).

  166. The PE Memo

  167. [99] The first document is the “Project PE – Information Memorandum” (“the PE Memo”) dated 23 November 2011. This was sent by Mr Goh to Mr Shaw on 31 January 2012. The PE Memo stated that the PE Division “has the necessary machinery and equipment in the Die Casting, E-Coating and Precision Machining processes [ie, both the First and Second Stage Works] with high capacities” and this enables “the PE Division to manage high volume of orders from customers”. It also stated that BTEC had 259 CNC Machines with a capacity of producing 3.5 million units per month.

  168. [100] The PE Memo was prepared by Mr Goh for distribution to potential buyers of the PE Division. A copy of this was provided to the NEDEC/KODEC Group. Relying on this document, the First Plaintiff contends that with the purchase of 10 more CNC machines in February 2012 (a fact which was undisputed), the machining capacity should proportionately increase to approximately 3.64 million baseplates per month, which would more than adequately cover the Second Stage Work on the one million e-coated baseplates diverted to the NEDEC/KODEC Group.

  169. [101] In cross-examination, Mr Goh explained that at the material time, he had accepted the figure of 3.5 million in the PE Memo as accurate, as the information had been provided by the engineering personnel. However, he disassociated himself from the figure by claiming that it was based on a “theoretical maximum” of CNC machining capacity, and that the “realistic maximum” production capacity was only 2.5 to 2.6 million, about a million units fewer than what was stated in the PE Memo. Therefore, BTEC could not carry out the Second Stage Work on one million pieces of e-coated baseplates per month. Instead of the PE Memo, Mr Goh asked that weight be given to the following three documents instead.

  170. The Draft capacity analysis

  171. [102] The next document is the “Draft Capacity Analysis” sent by Mr Lee Leong Hua on 14 March 2012 to the financial controller of the Beyonics Group. This was prepared by Mr Lee Leong Hua for the purpose of a management meeting at the instructions of Mr Goh. The Draft Capacity Analysis stated that BTEC’s machining capacity, based on 247 CNC machines, was 2.36 million. However, this did not take into account a remaining 22 CNC machines at BTEC. It was also prepared on the basis of a five-day work week, and 22 working hours per day, and did not reflect the maximum capacity of BTEC.

  172. The Changshu Capacity Matrix

  173. [103] The “Changshu Capacity Matrix” was sent on 7 June 2012 by Mr Lee Leong Hua to Mr Mueller. After BDA was engaged as agents for the sale of the PE Division, it requested some information from the Beyonics Group, including the Changshu Capacity Matrix which Mr Lee Leong Hua filled in. The Changshu Capacity Matrix stated that BTEC had 269 CNC machines with a “theoretical capacity” of 100,000 baseplates daily, and that the current capacity utilisation rate was 88%. This was on the assumption of a 26-day working plan. Therefore, BTEC had a machining capacity of 2.6 million baseplates per month.

  174. [104] At the trial, Mr Lee Leong Hua explained that the calculation did not take into account that there were 66 unused spare CNC machines available at BTEC. Instead, the calculation was based only on those CNC machines which were running at that point in time. Assuming that these 66 unused spare CNC machines were also used for the Second Stage Work for Brinks 2H baseplates, approximately 1.16 million additional Brinks 2H baseplates could be produced. Therefore, the total machining capacity would be approximately 3.76 million baseplates per month. On this, I accept Mr Lee Leong Hua’s evidence that the Changshu Capacity Matrix did not reflect the maximum production capacity of BTEC.

  175. The BDA Memo

  176. [105] Next, I turn to the confidential information memorandum prepared by BDA (“the BDA Memo”) dated June 2012. In the section entitled “[c]apacity and production”, it was stated that BTEC had an annual machining capacity of 36 million baseplates, or a monthly machining capacity of 3 million baseplates. These figures are stated to be on the assumption that “all capacity is used for production of baseplates”. However, Mr Shaw explained that these figures were conservative, as the BDA Memo was meant to be a document for the sale of BTEC. While the Beyonics Group understood from the PE Memo that the capacity was 3.5 million, they were agreeable for BDA to use the more conservative estimate of 3 million. I accept the explanation by Mr Shaw.

  177. The What-If Analysis Emails

  178. [106] The What-If Analysis emails started with Mr Goh’s email on 11 November 2011 at 9.25am to Mr Lee Leong Hua and others stating that he would be asking Seagate for funding, and requesting Mr Lee Leong Hua to “do the calculation” on BTEC’s baseplate production capacity. On the same day at 1.21pm, Mr Lee Leong Hua emailed Mr Goh stating that he would require a capital investment of US$4.18 million (to purchase new machines, jigs and fixtures) to meet the proposed monthly production plan of 1.1 million Seagate baseplates, 1.9 million Hitachi baseplates, 300,000 automotive parts and one million e-coated baseplates for the NEDEC/KODEC Group. Mr Goh claims that this shows that BTEC required large sums of capital investments to increase its production capacity to meet the proposed production plans.

  179. [107] However, Mr Leong Lee Hua explained that his computation was done on the basis that BTEC did not have any existing equipment or machinery which could be used for production. In fact, it was not necessary to invest in more CNC machines as there were unused CNC machines at BTEC. Instead, he opined in his AEIC that only a small investment for tools and fixtures was required for the Beyonics Group to carry out the Second Stage Work on the one million e-coated baseplates diverted to the NEDEC/KODEC Group.

  180. [108] Although US$4.18 million was requested by Mr Lee Leong Hua, at the meeting with Seagate on 18 November 2011, Mr Goh asked for twice the amount in the presentation slides, being US$8.8 million. In my view, the What-If Analysis Emails were prepared for the basis of getting investments from Seagate. For that purpose, they reflected the full extent of equipment and investments that the Beyonics Group would like to have. However, little weight should be placed on What-If Analysis Emails to establish what the BTEC really required, much less be relied on to conclude that there was a lack of capacity on the part of BTEC.

  181. Findings on documents on the overall assessment of production capacity

  182. [109] Based on the documentary and other evidence discussed above, I agree with the First Plaintiff that the information stated in the PE Memo appears to be the most reliable. It was originally endorsed by Mr Goh. Further, I note that the PE Memo was prepared closest in time to the entry into the B–N Alliance. As pointed out by the First Plaintiff, the timing of the documents was important as the overall capacity of a factory is not static and would vary depending on the mix of programmes being run by BTEC. The information in the PE Memo is thus more probative than that contained in other documents.

  183. Objective evidence of the capacity of the CNC machines

  184. [110] More importantly, the above documents show that of the many factors which determined the production capacity of BTEC, the most crucial factor was the numerical sufficiency of CNC machines. This factor featured in all the documents discussed and was confirmed to be critical by Mr Lee Leong Hua.

  185. [111] The First Plaintiff sought to provide objective evidence that BTEC had a sufficient number of CNC machines to carry out the additional Second Stage Work, especially from January 2012 to January 2013, the period during which e-coated baseplates were diverted to the NEDEC/KODEC Group.