High Court · Decided 18 April 2019
Seraya Energy Pte Ltd v Denka Advantech Pte Ltd and another suit (YTL PowerSeraya Pte Ltd, third party)
Feedback & support[2019] SGHC 100 · Case no. Suit No 1328 of 2014 · 13 paragraphs
✱ What happened, in plain English
There is no plain-English summary of this judgment yet.
Ask about this judgment →Grounds of decision
Official text from eLitigation
Introduction
- [1]
[1] The background to this action is set out in my judgment dated 2 January 2019 in Seraya Energy Pte Ltd v Denka Advantech Pte Ltd and another suit (YTL PowerSeraya Pte Ltd, third party) [2019] SGHC 02 (“the 1st Judgment”). Subsequent to that, I determined the extent of the liability and quantum in a supplementary judgment dated 29 January 2019 in Seraya Energy Pte Ltd v Denka Advantech Pte Ltd and another suit (YTL PowerSeraya Pte Ltd, third party) [2019] SGHC 18 (“the 2nd Judgment”).
The Offer to Settle
- [3]
[3] It transpired that on 31 October 2016, Denka had made an offer to settle (“the OTS”) SE’s claims. The offer remained open for five months and was withdrawn on 31 March 2017. The first day of the trial was 7 November 2017, more than seven months after the OTS was withdrawn.
- [7]
[7] However, upon hearing further arguments, I am of the view that more weight should be given to the fact that the OTS had remained open for acceptance for five months and less weight to the fact that it was withdrawn after five months. After all, there was no suggestion by SE that it would have accepted the OTS had it not been withdrawn.
- [8]
[8] Under the 2nd Judgment (at [4]–[5]), SE was entitled to receive/retain:
(a) $1,850,000 being the aggregate sum received from three bank guarantees (on 22 December 2014); and
(b) $77,911.72 from DAPL.
- [10]
[10] Under the OTS, SE would have been entitled to receive/retain:
(a) $1,850,000; and
(b) $ 792,450.
The total would have been $2,642,450 (excluding interest and costs).
- [11]
[11] The difference between the principal amounts offered under the OTS and awarded under the 2nd Judgment was $715,636 or about 37% of the principal amount under the 2nd Judgment. In absolute and in percentage terms, this was not a small difference even though the maximum aggregate amount of SE’s claim was about $31m and the total sum offered, ie, about $2.642m, was less than 10% of the maximum claimed.
Quantum of costs
- [15]
[15] However, I also considered two other points. First, it was not entirely unreasonable for SE not to accept the OTS since the total sum offered was less than 10% of the maximum sum claimed and one could not say then that it was obvious that SE would not succeed for the maximum sum claimed. Secondly, Denka had lost on the issue of liability for repudiatory breach of contract. While it is true that this issue would not even have to be considered if SE had accepted the OTS, I place some weight on Denka’s conduct in resisting liability for breach of contract.
- [16]
[16] In my view, it was obvious that Denka had reneged on its contractual bargain in the three electricity contracts in question. Denka had sought an accommodation from SE regarding a steam supply agreement and agreed to the terms thereof except for some technical details which remained outstanding. The terms of the accommodation required Denka to enter into the three electricity contracts with SE. When the price of electricity eventually went against Denka, it reneged on the three electricity contracts and attempted to avoid liability, using arguments which were clearly without merit.
- [17]
[17] Also, as mentioned, while SE lost its claim for liquidated damages, I could not say that its case for such a claim was clearly without merit. Likewise, I could not say that its alternative claim for general damages of a substantial sum which called for the court to disregard a contract for difference, was also clearly without merit.
- [23]
[23] However, in my view the arguments on liquidated damages were complex enough to warrant some increase from the guideline of $17,000 daily although this rate was already the daily tariff for complex contract cases. Furthermore, there should also be an uplift as the maximum amount of SE’s claims was for about $31m. As already mentioned, it was not clear that the claim for this sum was without merit, unlike some other cases where it is quite obvious that the sum claimed is without basis. In other words, the potential liability of Denka for this sum was quite real. Likewise, the potential gain for SE was also quite real.
- [25]
[25] I would also mention that, aside from the OTS, parties also argued as to whether the bulk of the work done for the trial was in respect of liability or quantum. In my view, the issue of liability was much less difficult than the issue of quantum which included the question as to whether the applicable provision on liquidated damages applied and, if not, what the general damages amounted to. In any event, I have taken into account the point that SE had resisted liability.
- [26]
[26] As for disbursements, I am pleased to note that parties have agreed on the quantum thereof although this is on the basis of disbursements for the entire duration of the action. I am of the view that Denka is entitled to disbursements incurred from the date the OTS was served. For the avoidance of doubt, SE is not entitled to the disbursements incurred before the date the OTS was served.
- [27]
[27] In summary, I make the following orders:
(a) I set aside my earlier decision of 5 March 2019 on costs and disbursements.
(b) SE is to pay Denka 90% of the costs of the action, on a standard basis, from the date the OTS was served. This is fixed at $390,000.
(c) SE is to pay Denka the disbursements of the action from the date the OTS was served. This is to be agreed or fixed by the court.
Parties are to agree on such disbursements within 14 days from the date of this judgment, failing which Denka is to write in for an appointment to fix the quantum of disbursements within 21 days from the date of this judgment.
(d) SE is to pay Denka $3,000, all in, for getting up and for work done for submissions on costs and disbursements.