Grounds publishedDecided 27 Apr 2020

High Court

Viking Engineering Pte Ltd v Feen, Bjornar and others and another matter

Feedback & support

[2020] SGHC 78Case no. Suit No 294 of 2017 (Summonses Nos 4610 of 2019 and 793 of 2020)53 paragraphs

What happened, in plain English

There is no plain-English summary of this judgment yet.

Ask about this judgment

Grounds of decision

Official text from eLitigation

  1. Background

  2. [3] Viking Engineering and Mr Feen were joint venture partners in VIG. On 4 April 2017, Viking Engineering commenced S 294/2017, as minority shareholders of VIG, for minority oppression under s 216 of the Companies Act (Cap 50, 2006 Rev Ed). In these grounds, the term “the defendants” refers to the defendants in S 294/2017, notwithstanding that they are the plaintiffs in OS 1324/2019.

  3. [4] S 294/2017 arose out of a sale and purchase agreement dated 10 September 2013 between Viking Engineering and Mr Feen in relation to VIG. By this agreement, Viking Engineering, at that time a 51% shareholder in VIG, sold a 21% shareholding in VIG to Mr Feen, thereby giving Mr Feen a 70% shareholding in VIG. This resulted in Viking Engineering holding a remaining 30% shareholding in VIG. Mr Feen was obliged to abide by various undertakings in return, including an undertaking to change the corporate name of VIG to Feen Marine Pte Ltd, the same name that was later used for the second defendant (“Feen Marine”). Mr Feen is the sole director of Feen Marine, the fourth defendant, Scanjet Feen IGS Pte Ltd (“Scanjet Feen”), and the fifth defendant, Feen Marine Scrubbers Pte Ltd (“Feen Marine Scrubbers”), collectively referred to as “the Feen Companies”.

  4. [5] Viking Engineering’s initial claim in S 294/2017 included contentions that, in breach of the sale and purchase agreement, Mr Feen failed to change the name of VIG to Feen Marine and instead incorporated a company of the same name. This is the second defendant. Mr Feen thereafter transferred his entire shareholding in VIG to Feen Marine. The business and corporate opportunities of VIG were said to have subsequently been diverted to Feen Marine and Scanjet Feen. In particular, these corporate opportunities related to the supply of oil discharge monitors, contracts for the supply of inert gas systems (“IGS”) and exhaust gas cleaning services (“ECGS”).

  5. [7] Counsel for the defendants asked for time to submit on whether a discount ought to be applied by the valuer to Viking Engineering’s minority holding in VIG. At the same time, in the course of proceedings, after Viking Engineering contended that there was also evidence of diversion of business opportunities from VIG to Feen Marine Scrubbers, the latter was added by consent as the fifth defendant.

  6. The applications: context and issues

  7. [14] The single central issue in this case was whether the Report is binding between the parties or whether it should be set aside. It was common ground that the Report, being an expert determination, may only be set aside on one or more of the following three grounds (see The Oriental Insurance Co Ltd v Reliance National Asia Re Pte Ltd [2009] 2 SLR(R) 385 (“Oriental Insurance”) at [47]; and also Poh Cheng Chew v K P Koh & Partners Pte Ltd and another [2014] 2 SLR 573 at [36]):

  8. (a) where the expert materially departed from instructions;

  9. (b) where there is a manifest error in the expert’s determination that justly requires judicial intervention; or

  10. (c) there was fraud, corruption, collusion, dishonesty, bad faith, bias, or the like.

  11. In the present case, only the first two grounds were in issue.

  12. Decision

  13. [15] For the reasons that follow, I decided that Mr Hayler had not materially departed from his instructions, nor was there any manifest error in the Report. In the result, I dismissed OS 1324/2019 and fixed the price for the purchase of Viking Engineering’s shares in VIG at S$13.2 million, the valuation stated in the Report.

  14. Was there material departure from instructions?

  15. [16] The defendants contended that Mr Hayler had departed from his instructions. In Oriental Insurance at [48], Chan Seng Onn J adopted the dictum in Jones v Sherwood Computer Services Plc [1992] 1 WLR 277 at 287, which provides a two-step approach to this issue (see also Evergreat Construction Co Pte Ltd v Presscrete Engineer Pte Ltd [2006] 1 SLR(R) 634 (“Evergreat”) at [41]):

  16. (a) first, the court should determine what the parties had agreed to remit to the expert; and

  17. (b) second, the question is whether “the expert departed from his instructions in a material respect”.

  18. [17] The defendants’ contentions went to both aspects of the two-step test. Various aspects of Viking Engineering’s arguments related to the LOE which, the defendants argued, formed the context for Mr Hayler’s mandate. The second aspect was the issue of whether Mr Hayler departed from his mandate in a material aspect. Once it is established that there was a departure from instructions, it would be considered material “unless it can truly be characterised as trivial or de minimis in the sense of it being obvious that it could make no possible difference to either party”: Veba Oil Supply & Trading GmbH v Petrotrade Inc [2002] 1 All ER 703 (“Veba Oil”) at [26], quoted by Oriental Insurance at [57]. In this context, the defendants contended that there were several departures. Further, the defendants submitted that Mr Hayler’s determination was qualified, and therefore not a binding determination made in compliance with his mandate: see Yashwant Bajaj v Toru Ueda [2020] 1 SLR 36 (“Bajaj”) at [66]–[68]. I deal with these points in turn.

  19. What had parties agreed to remit to Mr Hayler?

  20. Was there a material departure from his remit?

  21. [21] The defendants alleged several departures from instructions. Their primary assertion was that Mr Hayler had given a qualified determination, and I deal with that issue first.

  22. Did Mr Hayler give a qualified determination?

  23. [23] The defendants relied on Shorrock Ltd and another v Meggit plc [1991] BCC 471 (“Shorrock”), where the experts, the joint auditors, were asked to provide a certificate on a value described as the “October net deficit”. The certificate itself, however, stated the joint auditors were “unable to determine” a key component of the accounts, specifically a provision of monies in respect of potential legal claims. The English Court of Appeal held that because the qualification meant that the requirement of certainty under the agreement was not met, the determination was therefore not binding on the parties.

  24. [24] Similarly, in Bajaj ([17] supra), an accountant furnished a qualified report. The case concerned the issue of whether a statutory demand should be set aside on the basis that the debts stated therein had not yet accrued: Bajaj at [1]. Mr Bajaj sought to set aside the statutory demand. The parties had entered into a settlement agreement, which provided for an independent accountant to calculate the final sum due from one party to the other. However, the report was qualified, in that the independent accountant concluded that the values reached in his report were subject to adjustments. The Court of Appeal held that the values arrived at were not “final” and therefore did not satisfy the settlement agreement in that case: Bajaj at [65]. At [77], the Court of Appeal concluded:

  25. It was therefore clear from Bajaj that it was the expert’s qualification that was crucial.

  26. [25] In this case, unlike the experts in Bajaj or Shorrock, Mr Hayler did not claim that he was not able to proceed with the valuation exercise. Instead, he simply stated that he lacked certain pieces of information, and then proceeded to make assumptions that enabled him to complete his valuation.

  27. [26] The defendants relied primarily on a number of statements made by Mr Hayler in the Report, which I set out here:

  28. [27] The defendants argued that these statements amounted to qualifications of Mr Hayler’s determination. I rejected these arguments for the following reasons.

  29. [28] First, the statements relied upon were made in the Report’s summary (Section 2) and the description of the procedural background (Section 3). When Mr Hayler proceeded with his analysis and came to his determination, however, his statements were unqualified:

  30. It is clear that these conclusions were unqualified, when taken on their own terms. When stating his conclusions, Mr Hayler did not add any qualifications whatsoever, and provided his valuation categorically.

  31. [29] In response, the defendants argued that the Report should be read as a whole. I found that this did not assist their case. When the Report was read as a whole, and the statements relied on by the defendants viewed in context, it was clear that Mr Hayler’s statements were not qualifications. These statements were made in the context of explaining the process by which the valuation was conducted. The purpose of those statements was to set out the gaps in information provided, which set the context for explaining how the valuation process compensated for those gaps. The gaps required articulation as part of the process because clauses 7 and 14 of the LOE expressly gave various discretionary powers to Mr Hayler where such gaps existed. For example, para 2.7 of the Report, which was cited by the defendants, was immediately followed by a number of paragraphs which detailed the assumptions that needed to be made in the absence of information. Paragraphs 3.77 and 3.78 were the concluding paragraphs of a section dedicated to the procedural background of the valuation. As such, the statements cited by the defendants were not qualifications but served as a explanatory preface to remedial steps that were then taken by Mr Hayler in his valuation process.

  32. Remaining alleged departures from instructions

  33. (1) No discount for lack of marketability

  34. [31] The defendants highlighted that Mr Hayler did not apply a discount for the lack of marketability. At para 5.35 of the Report, Mr Hayler explained:

  35. (2) Reliance on assumptions

  36. [35] In their submission, Mr Hayler was instructed to determine the value of the Shares, not to engage in estimation or to assume the value of the Shares. Relying on Mr Collard’s report, the defendants argued that Mr Hayler was effectively “valuing his own numbers”, which was not what he was mandated to do.

  37. [37] Similarly, the LOE granted the valuer wide discretion. As cl 6 of the LOE provided:

  38. In my view, cl 6 provided Mr Hayler with a discretion to determine how the valuation exercise was to be conducted. The only pre-conditions were that he “obtained a good understanding” of VIG’s business, assets and liabilities, and that he had the information “that [was] available” for the exercise. I did not find any reason to doubt – and the defendants did not submit otherwise – that these preconditions were met.

  39. [38] Further, the LOE provided a process for the provision of information and Mr Hayler had accordingly furnished a timetable for the information that he considered necessary. Under cl 7 of the LOE, Mr Hayler was to inform parties of first, the information he believed he needed, and second, his reservations or qualifications before rendering his decision. This should be read together with cl 14 of the LOE:

  40. The LOE clearly allowed Mr Hayler to proceed in the absence of information, since there is provision for the drawing of adverse inferences in such circumstances. Therefore, the LOE did not mandate Mr Hayler to abandon the valuation if he determined that necessary or useful information was still missing.

  41. [39] Having determined the scope of Mr Hayler’s instructions, I turn to the issue of whether the assumptions made amounted to a material departure. I found that they did not. Mr Collard, in his report, stated that he agreed in principle with the Discounted Cash Flow (“DCF”) and comparative analysis approaches. The use of these various methodologies would require the use of assumptions in application. It was the application of the methodology and specific assumptions used that Mr Collard criticised. In this regard, it was not the court’s role to assess if the assumptions were correct, but whether Mr Hayler had materially departed from his instructions by making the assumptions. In light of the discretion given to Mr Hayler described above, I could not agree that there were departures. Mr Hayler had decided, well within the bounds of his discretion, to use the DCF and comparative approaches which themselves required the use of assumptions and estimations.

  42. [40] I deal with two more of the defendants’ arguments here. First, they argued that the timelines under the LOE were mere guidelines, and therefore, there was no real need for Mr Hayler to have proceeded with the valuation without the necessary information. In my view, Mr Hayler could not be criticised for seeking to complete the valuation with regard to the timeline that the parties had themselves agreed to. While clauses 31 and 32 of the LOE provided that Mr Hayler “will aim” to complete the valuation within six weeks, and to complete the report within three weeks after the end of valuation, it was also envisaged that Mr Hayler would have to inform parties of any delay and to provide an explanation. In any case, it is clear that cl 14 allowed Mr Hayler to proceed in the absence of information and even to draw adverse inferences. Second, the defendants argued that Mr Hayler should have applied to court directly for directions when it was clear that information was not forthcoming. I did not find this argument relevant at all, since I had already determined above that Mr Hayler had the discretion to proceed as he did. Mr Hayler’s actions were therefore unobjectionable.

  43. (3) Diversion of business

  44. [42] In this context, I was concerned only with determining if Mr Hayler had departed from his instructions and not whether Mr Hayler had made any errors in his approach to the assumptions regarding the diverted businesses. As Chan J stated in Oriental Insurance ([14] supra) at [54]:

  45. The pertinent issue for me to decide is therefore whether Mr Hayler had directed himself to value VIG on the assumption that the diverted business was performed by VIG. In my view, there was no doubt that he had done so.

  46. [48] The defendants then argued that Mr Hayler’s analysis was in error, primarily on the basis that he had failed to consider the contents of the letter sent by the defendants’ then-solicitors on 7 September 2018. I was not persuaded by this submission. Mr Hayler clearly quoted from the 7 September 2018 letter and addressed what he saw to be the key issues. It was not for the court to look behind Mr Hayler’s report to consider the adequacy of his treatment of the evidence. Mr Hayler’s disagreement with the defendants’ submissions to him, namely that VIG did not have the capacity to engage in engineering work, that Viking had previously refused to give a capital injection, that VIG was perceived to be a racist organisation, and that VIG had been blacklisted by major clients , do not reflect points of departure (or show any manifest error) on Mr Hayler’s part. He was entitled to assess and to reject the defendants’ claims. This was entirely within Mr Hayler’s remit.

  47. Conduct of the defendants in the valuation

  48. [49] The defendants’ contentions in respect of Mr Hayler’s assumptions and methodology raised issues concerning Mr Feen’s conduct, which I turn now to consider.

  49. (1) Lack of co-operation

  50. [50] The conduct of parties in respect of the submission of documents was set out by Mr Hayler in Appendix 3 to the Report. I highlight here the key facts. On 22 June 2018, Mr Hayler wrote to parties with his information request, pursuant to cl 20 of the LOE. Mr Hayler gave the parties two weeks for the provision of documents, from 25 June to 9 July 2018 (“the document provision period”). By agreement of parties, the document provision period was extended to 13 July 2018. This deadline was again breached, and Mr Hayler gave the parties another extension to 31 August 2018. Yet another extension was given to the parties until 7 September 2018, and then once again until 4 October 2018, nearly three months after the close of the initial document provision period. Despite these extensions, there remained significant gaps in the documents provided to Mr Hayler.

  51. [51] I previously dealt with Mr Feen’s failure to co-operate with the valuation process in Viking Engineering v Feen, Bjornar (No 1) ([10] supra) at [23]. Mr Feen is the sole director of the remaining defendants, who were party to the same LOE. All were subject to the same obligation to co-operate, specified in FTI’s standard terms and conditions, at Annexure A to the LOE. I detail here the following instances of failure to co-operate:

  52. (a) As recounted above, there were numerous delays due to the failure of the defendants to provide documents and information that should have been within their possession and control. Despite the numerous extensions, the submissions “failed to include most of the documents [Mr Hayler] requested”.

  53. (b) Further, there were significant doubts over the information that was provided. As Mr Hayler noted in the Report, there were electronic files containing unaudited financial statements that were created and last modified on dates before the end of the relevant period (eg the file containing statement for the full year of 2017 was created on 20 April 2016 and last modified on 29 March 2017). There were also questionable entries for “Subcontractor services” for which Mr Hayler sought explanations. Despite repeated reminders, no explanations were forthcoming.

  54. (c) Specific information requests from Mr Hayler were not fulfilled by the defendants:

  55. (i) On 27 July 2018 and 31 August 2018, Mr Hayler requested information relating to the defendant companies, including general ledgers, sales ledgers, journal entries and trial balances. Notwithstanding Mr Hayler’s six repeated reminders, none of this information was forthcoming.

  56. (ii) In the course of attempting to obtain the bank statements and tax records for the defendant companies from third parties, Mr Hayler required authorisations to do so. After obtaining Mr Feen’s signature, the third parties requested further authorisations from Mr Feen. Mr Hayler relayed the requests to the defendants’ counsel at the time on 15 October 2018, and requested the authorisation to be done by 19 October 2018 so that the information would be obtained within the time period for the valuation exercise. This was not done.

  57. (d) In their submissions, the defendants tried to argue that they had in fact co-operated, citing in particular the fact that they had provided contact details to Mr Hayler for the purpose of meeting with the accountants on 7 September 2018, but which meeting never took place. This was a mischaracterisation of the facts. Mr Hayler first suggested the idea of a site visit to the accountants to look at the accounting system on 27 July 2018. The defendants’ solicitors at the time replied that they would try to arrange an appointment. Mr Hayler responded to ask for the appointment to be arranged within the next two weeks, which the solicitors acknowledged. However, despite seven reminders, this was never done. The next update came on 7 September 2018, when the defendants’ solicitors provided contact details to Mr Hayler as follows:

  58. This last-minute attempt at co-operation came on 7 September 2018 when the information had been requested much earlier, on 27 July 2018. More importantly, Mr Hayler rightly felt the information was not reliable: “Navig8” was elsewhere identified by the defendants’ then-solicitors as one of the companies that had decided not to contract with Mr Feen or VIG or other associated companies since 2016, suggesting that it was a client, not an accountant. Mr Hayler justifiably exercised his discretion, given that that particular document provision period had ended, to continue with the valuation exercise without arranging a meeting.

  59. [52] The defendants’ excuse was that they did not have the available documents because VIG did not have a proper office and there was an absence of a proper accounting and document management system, and further, because Mr Feen had not been resident in Singapore since 2014. These arguments were attempted but failed in Viking Engineering v Feen (No 1) and did not become more persuasive on repetition. First, the defendants were almost entirely passive throughout the process, and failed to request extensions of time even though that was provided for under cl 20 of the LOE, as Mr Hayler observed in his email dated 15 July 2018 to the parties. Further, I noted that this explanation did not arise in the email dated 14 July 2018 from the defendants’ solicitors at the time to Mr Hayler. Rather, the explanation there was that the defendants needed more time to obtain the documents, not that these were not available. Second, these fact, if true, must have been known by the defendants prior to their agreement to the appointment of an independent valuer, the design of the procedure, and the terms of the LOE. They cannot now seek to undermine the bargain simply because of their later failures to comply with the agreed procedures.

  60. [53] Viking Engineering has raised two points in relation to the above sequence of events. First, that the defendants were estopped from complaining about how the valuation exercise continued because they had failed to apply to court when they had represented that they would. Second, that the defendants could not now rely on their lack of co-operation to complain about alleged assumptions made in Mr Hayler’s determination and the Report. I deal with each possible implication in turn.

  61. (2) Estoppel

  62. [55] The facts said to amount to a representation were these. In an email dated 15 July 2018, Mr Hayler wrote to the solicitors for both sides, expressing his frustration at the defendants’ repeated failures to abide by the timelines and to provide the requested documents. He then stated:

  63. [56] On 18 July 2018, solicitors for Viking Engineering replied to Mr Hayler, expressing support for Mr Hayler’s proposal to proceed with the valuation. They further stated that where information was lacking, Mr Hayler should draw the appropriate inferences necessary and incorporate those into the valuation. That same day, then solicitors for the defendants replied, explaining that they were not in possession of the documents and they were seeking information from those who did have the documents on the state of the requested information. They reiterated that the defendants were not withholding documents and would arrange for the documents to be available to Mr Hayler. In relation to the proposed course of action, they wrote:

  64. [57] On 19 July 2018, Mr Hayler replied, acknowledging that the parties had liberty to apply to court to seek directions “on the timetable or provision of documents”, and asked only that he be “kept appraised of any such application and the outcome”. On the same day, the defendants responded by providing additional documents, and noting:

  65. [58] The defendants, however, did not apply to court for directions. Instead, they proceeded to provide some documents on 31 August 2018, and on 7 September 2018, provided submissions in the form a letter. This failure to apply to court, contended Viking Engineering, gave rise to an estoppel by representation.

  66. [60] The fact that Mr Hayler decided to commence the valuation process at that time is not the subject of dispute in the present case. Rather, the defendants’ complaints deal with the substance of Mr Hayler’s valuation after further information was given in later submissions. Their complaint was that, having seen all the information available at the end of the last deadline in September 2018, that Mr Hayler should not have made the determination that he did. I turn then to deal with this aspect of the arguments.

  67. (3) Effect of lack of co-operation

  68. [61] What then is the effect of the defendants’ lack of co-operation? Viking Engineering relies on Evergreat ([16] supra), to contend that the defendants may not take advantage of their own wrong to set aside the determination. In Evergreat, Rajah J explained at [51]–[52] as follows:

  69. [62] In contrast, the defendants argued, citing Bajaj ([17] supra), that this principle did not apply in the present case.

  70. [63] Again, the exact scope of the decision in Bajaj is important. The Court of Appeal there accepted the Evergreat principle, but decided that it was not applicable in that case, because the accountant chose to qualify his report: [65]. The Court of Appeal concluded that the contractual benefit that Mr Bajaj asserted was not a direct result of his breach of his duty to co-operate: Bajaj at [77]–[78]. As I had found that Mr Hayler had not qualified his report in this case, the issue of the defendants’ conduct became potentially relevant to the other complaints that Mr Hayler departed from his instructions. I turn then to these specific complaints.

  71. [64] The decision in Evergreat stands for the proposition that a defendant would not be able assert a contractual right if the right arose from the direct result of its own misconduct: at [52]. Coming to the present case, the contract between parties did not furnish the defendants a right to set aside a validly made determination. In so far as the defendants sought to argue that Mr Hayler’s valuation was manifestly in error or a material departure from instructions, I observe that Viking Engineering had not one rejoinder but two. In my judgment, the parties’ contract in this case allowed for Mr Hayler to use his discretion, and his exercise of such discretion was entirely reasonable. First, his use of discretion was the direct result of the defendants’ own breaches of the duty to co-operate. Second, clauses 7 and 14 of the LOE allowed Mr Hayler to make suitable adjustments in the absence of information. The adjustments Mr Hayler made were the result of the defendants’ conduct, and were effected reasonably:

  72. (a) In relation to the use of assumptions, aspects of Mr Hayler’s reliance on assumptions were a direct result of the defendants’ failure to co-operate and to provide the necessary documents. This is clear from the Report itself, where Mr Hayler discussed the limitations of the information at paras 6.10 and 6.11. The defendants could not complain about Mr Hayler’s use of assumptions to set aside the Report, insofar as the assumptions were necessitated by the absence of information due to the defendants’ breach of the duty to co-operate in the very first place.

  73. (b) In relation to the diversion of business, again the absence of information arose from the defendants’ failure to co-operate. Mr Hayler’s approach was the direct result of the absence of information about the contracts, VIG, and the Feen Companies.

  74. (c) In relation to the issue of physical impossibility, the defendants’ failure to provide information on the contracts and the Feen Companies meant that Mr Hayler was constrained to assess the issue of diversion in relatively broad strokes, which also prevented him from undertaking the specific analyses that the defendants now argue he should have done.

  75. Was there manifest error in the Report?

  76. [66] I turn then to the arguments on manifest error. In Geowin Construction Pte Ltd (in liquidation) v Management Corporation Strata Title Plan No 1256 [2007] 1 SLR(R) 1004 (“Geowin”), Rajah J summarised the applicable principles as follows (at [19]):

  77. [67] At the outset, I note that there is a difference of opinion in the High Court on whether underlying sources may be examined. On one hand, in Oriental Insurance ([14] supra), the court had regard to underlying sources to understand the IA’s reasoning. On the other hand, the courts in Geowin and Teo Lay Gek and another v Hoang Trong Binh and others [2019] SGHC 84 (“Teo Lay Gek”) preferred the view that in considering the report, the court should not stray from errors appearing on “the face of the report”.

  78. [69] On both approaches, the threshold for a manifest error remains a high one. I summarise the applicable principles as follows:

  79. (a) a manifest error is an error that is obvious (Veba Oil ([17] supra) at [33]), or patent (Geowin at [16]);

  80. (b) a manifest error is an error that is “obviously capable of affecting the determination” (Veba Oil at [33]; Oriental Insurance at [86]);

  81. (c) a manifest error is an error that admits “of no difference of opinion” (Veba Oil at [33]); and

  82. (d) arithmetic miscalculations (Oriental Insurance at [90]), mistakes as to the identity of parties (Legal & General Life of Australia Ltd v A Hudson Pty Ltd (1985) 1 NSWLR 314 (“Legal & General Life”) at 335 quoted by Geowin at [17]) or a reference to a building that does not exist (Walton Homes Ltd v Staffordshire County Council [2013] EWHC 2554 (Ch) (“Walton Homes”) at [46]) are all examples of manifest errors.

  83. [70] In contrast, a failure to take into account relevant considerations or a decision to take into account irrelevant considerations (Legal & General Life at 335, cited by Geowin at [17]), errors in judgment (eg treating as good debts that turn out to be bad, or omitting losses that were not known at the time: Walton Homes at [9] citing Lindley & Banks on Partnership (Sweet & Maxwell, 19th Ed, 2010) at para 10-73), mistakes in the expert’s reasoning process (Holt v Cox (1997) 23 ACSR 590 at 596, quoted by Geowin at [18]) and even negligent valuations (Evergreat ([16] supra) at [28]; Teo Lay Gek at [46]) are not regarded as manifest errors.

  84. Criticism of valuation methodology

  85. [71] The defendants argued that Mr Hayler’s approach to valuation was a manifest error. In the Report, Mr Hayler first conducted a DCF analysis, arriving at the figure of S$50.9 million, then conducted a comparative analysis and arrived at a value of S$37.1 million, before proceeding to use the mid-point (or average) between the two, concluding with a valuation of S$44 million. Relying on a report prepared by Mr Collard, the defendants argued that this was inconsistent with the International Valuation Standards Council (“IVSC”) guidelines, which stated that the averaging of valuations is “not acceptable”. Further, the IVSC guidelines appeared to provide that even the process of “weighting”, that is, “the process of analysing and reconciling differing indications of values, typically from different methods and/or approaches”, and excludes averaging, was not acceptable where different methods “result in widely divergent indications of value”, which was, according to the defendants, the situation here.

  86. Criticism of DCF analysis

  87. [73] The defendants made various criticisms about Mr Hayler’s DCF analysis. First, the defendants argued that the Report was erroneous as it represented in the diagram at page 33 that Mr Feen owned 50% of Scanjet Feen. However, there was no error on the face of the Report, as there was no indication of inconsistency. Even considering the company search tendered, I noted that the company search was generated on 22 October 2019, while Mr Hayler’s chart was stated expressly to be correct as at 30 September 2017 for Scanjet Feen. I was not convinced that there was an error. In any case, the defendants have not shown how the error would have affected the valuation in such a way that justified judicial intervention: Oriental Insurance ([14] supra) at [86].

  88. [74] Second, the defendants took issue with Mr Hayler’s use of a Compound Annual Growth Rate (“CAGR”) of 20% to estimate the growth in VIG’s revenue from 2015 to 2018. The defendants complained that Mr Hayler had only used the estimates stated in the summaries to the reports, and that Mr Hayler had failed to distinguish between the different sectors (marine, industrial and aviation) and between the different geographic sectors. The defendants argued that Mr Hayler should have used estimates that were more relevant instead.

  89. [75] In his analysis, Mr Hayler first identified the “major global players” in the global IGS market at paras 4.28–4.29 of the Report. He then noted that the global IGS and EGCS markets were projected to have strong growth of at least 20% per year from 2017 to 2025. He noted that the global IGS market was projected to grow at a CAGR of 21% and 24.1% up to 2022 and 2026 respectively, and the EGCS market was projected to grow at a CAGR of around 45.8% and 40% up to 2022 and 2025 respectively. Mr Hayler also provided reasons for these strong projections. He then found that these projected growth rates were consistent with material prepared for the Feen Companies as well as in the news. In Appendix 4 of the Report, Mr Hayler set out a more detailed analysis of the IGS and EGCS markets, showing how he derived the figures that he relied on in the body of the Report.

  90. [76] I was unable to find any manifest error in Mr Hayler’s valuation. The defendants’ criticisms revealed a difference in opinion, which is not a matter within the court’s purview. The defendants argued that the CAGR was mistaken because there were better estimates that were more relevant for VIG’s business, but Mr Hayler had proceeded on a different basis based on his professional judgment. The question of what rates to use in projecting revenue, as well as adjustments to make, are matters of professional expertise. In particular, I noted that Mr Hayler provided justification for his use of the reports. For example, in his view, the projected growth rate for the marine sector, which the defendants argued is the relevant one, would have been higher than the estimated rates for the overall IGS market, but he decided to rely on the overall IGS market rates in the exercise of his judgment. That was not something that the court should interfere with in this context.

  91. [77] I was buttressed in my conclusions by considering Mr Collard’s report. I noted that Mr Collard’s views on the CAGR of 20% were couched in terms of his own professional judgment. In his view, Mr Hayler should have purchased the reports or relied on the accounts of comparable companies. Mr Collard noted that Mr Hayler did not consider whether a small company would have the same access to growth in the market. He concluded that “[g]rowth at 20% per annum sustained for 20 years would be unusual in an industry without some element of new technology”. On his analysis, there was nothing wrong on the face of the valuation, but his views on the appropriate rates and applications differed. The defendants’ arguments did not reveal manifest error but merely disclosed a preference for one expert opinion over another.

  92. Criticism of comparative analysis

  93. [78] The defendants criticised Mr Hayler’s comparative analysis because he used two listed companies, Alfa Laval AB (“Alfa Laval”) and Wartsila Oyj Abp (“Wartsila”) as comparable companies. They argued that these two companies were listed companies with significantly larger market capitalisations, that the fact that they were competitors did not mean that they were comparable, and that, relying on Mr Collard’s report, Mr Hayler had erred in failing to apply any adjustments to the multiples used in the analysis. The defendants submitted that even if Mr Hayler was relying on the competitors identified by Mr Feen at VIG’s Annual General Meeting on 1 August 2016, there were also four other companies identified, two of which were local private companies that should have been relied upon instead.

  94. [79] I did not find the defendants’ arguments compelling. The question of which companies to use as comparable companies for the purpose of the comparative analysis is plainly one for the expert to exercise his judgment on and on which there may be a difference in opinion. The same goes for what adjustments should be made to the data to account for differences between the comparable companies and the company being valued. In this case, the decisions against which the defendants are mounting their complaint were within the scope of Mr Hayler’s discretion, given that the parties had tasked him to value the shares in VIG. He made the decision to rely on Alfa Laval and Wartsila, and applied adjustments accordingly. Even if there were more appropriate companies to use as comparators, Mr Hayler’s decision not to do so does not amount to a manifest error.

  95. Other contentions of manifest error not supported by expert evidence

  96. [80] The defendants also submitted that as at 10 September 2013, when Viking Engineering sold its 21% shareholding to Mr Feen, the valuation of VIG was S$1.14 million. FTI’s analysis which valued VIG at S$44 million, meant that VIG would have grown more than 38.5 times in just 5 years. This scepticism should have been expressed by expert opinion, but it was not. It did not feature in Mr Collard’s analysis. Nor would that fact have escaped Mr Hayler or Mr Collard. It was only asserted by Mr Feen and repeated by counsel in oral argument. As a general matter, it is not impossible for companies to grow by more than many times the growth rate attributed to VIG: without expert evidence, it was impossible to conclude that such growth was not possible. Indeed, Mr Hayler’s expert evidence indicated the contrary.

  97. [81] The accounts exhibited in Mr Feen’s two additional affidavits did not assist the defendants either. The 2014 accounts had been available in October 2018 but were not made available to Mr Hayler, nor Mr Collard for that matter. In any case, that set of accounts was ultimately not audited as the independent auditor found insufficient evidence for the auditing process to proceed. As for the remaining accounts for 2015 and 2016 found in Mr Feen’s 3rd and 4th Affidavits, although these appear to have been completed around 30 November 2019 or later, whatever documents they were based upon could and ought to have been shared with Mr Hayler. The defendants did not do so. In addition, there was no legal basis shown by the defendants that would enable the court to consider such financial statements in preference to My Hayler’s determination as parties’ appointed expert.

  98. [82] I noted also that while Mr Collard criticised Mr Hayler’s analysis, he did not attempt to put a competing valuation before the court.

  99. Conclusion