General Division of the High Court · Decided 5 August 2025
The defendant's standard terms did not become part of the contract
Straco Leisure Pte Ltd v Sumitomo (Shi) Cyclo Drive Asia Pacific Pte Ltd
Feedback & support[2025] SGHC 150 · Case no. Originating Claim No 383 of 2023 · 77 paragraphs
✱ The decision, in one line
Not legal advice
The defendant's standard terms did not become part of the contract
Summary by laws.sg·Paragraphs [90], [95]
There is no fuller plain-English summary of this judgment yet.
Ask about this judgment →Laws this judgment relies on
Grounds of decision
Official text from eLitigation
Introduction
- [1]
[1] The “Singapore Flyer” is a Giant Observation Wheel (the “GOW”) located along Raffles Avenue. It has been a prominent, and some might say iconic, feature of the Singapore skyline since its opening in 2008. In January 2018, a serious breakdown of the GOW occurred, which spawned the present dispute. The breakdown resulted in the GOW suspending operations for approximately two months, with full operational capacity not resuming until a year later. The claimant blames the defendant for the breakdown occurring and seeks to make the defendant liable for the substantial losses the claimant says it incurred as a result.
Background Facts
The GOW
- [3]
[3] The GOW was designed and manufactured by Mitsubishi Heavy Industries Ltd. Its rotational movement is provided by 12 “Drive Modules” distributed along the circumference of the wheel, respectively labelled: “DN1”, “DN2”, “DN3”, “DS1”, “DS2”, “DS3”, “DE1”, “DE2”, “DE3”, “DW1”, “DW2”, and “DW3”. As the labels suggest, they correspond to the four cardinal points (North, South, East, and West). An illustration of DW1, DW2, and DW3 (highlighted) is provided in Figure 1 below for reference:
- [4]
[4] Each Drive Module consists of an upper and lower “Drive Wheel” – thus, with two Drive Wheels for each of the 12 Drive Modules, there are a total of 24 Drive Wheels. The Drive Wheels rotate along the drive track, thereby providing the GOW’s rotational movement. Figure 2 below depicts a diagrammatic representation of each Drive Wheel:
- [5]
[5] In turn, and as shown in Figure 3 below, each Drive Wheel is connected to the GOW by a “Drive Shaft”:
- [6]
[6] To assist the reader, I will adopt the following naming convention in this judgment: for example, the Drive Shaft affixed to the upper Drive Wheel of the DW3 Drive Module will be referred to as the “DW3 Upper Drive Shaft” (or “DW3 Upper” in short), the Drive Shaft affixed to the lower Drive Wheel of the DE2 Drive Module will be referred to as the “DE2 Lower Drive Shaft” (or “DE2 Lower” in short), and so on.
The parties
- [7]
[7] The claimant is Straco Leisure Pte. Ltd. – it was at all material times the owner and operator of the GOW. I heard evidence from two of the claimant’s witnesses:
(a) Leung Kwok Ho Ringo (“Mr Ringo Leung”), the claimant’s General Manager; and
(b) Loke YunXiang Stanley (“Mr Stanley Loke”), the claimant’s Maintenance Manager.
- [8]
[8] Paul Raymond Fitzpatrick (“Mr Fitzpatrick”) is another employee who was slated to give evidence for the claimant, but he was unable to make it for the trial due to a personal familial matter. Counsel for the claimant, Mr Raymond Wong (“Mr Wong”), was content to proceed with the preliminary trial without Mr Fitzpatrick’s evidence, and Mr Lim Yee Ming, counsel for the defendant, did not object to this course of action. In the circumstances, I granted the claimant’s application, made at the start of the trial, for leave to withdraw Mr Fitzpatrick’s affidavit of evidence-in-chief (“AEIC”). The result is that Mr Fitzpatrick’s AEIC was not admitted into evidence, and I have not considered it in my determination of the preliminary issues.
- [9]
[9] The defendant, Sumitomo (Shi) Cyclo Drive Asia Pacific Pte. Ltd., is a subsidiary of Sumitomo Heavy Industries Ltd. Three witnesses were called by the defendant:
(a) Ronny Poon Foo Heng (“Mr Ronny Poon”), the defendant’s Managing Director;
(b) Roy Ho Teck Loon (“Mr Roy Ho”), who was an Assistant Manager with the defendant at the material time; and
(c) Lim Yee Ching (“Mr Albert Lim”), who was a Service Supervisor with the defendant at the material time.
The parties’ business relationship
- [10]
[10] The defendant describes itself as a “designated vendor” of certain specific components of the GOW, and who provided “maintenance and repair works” for these designated components.
- [11]
[11] That said, it is undisputed that from time to time the claimant would engage the defendant to also carry out various ad hoc works for the GOW (the “Ad Hoc Works”). The Ad Hoc Works generally proceeded according to the following protocol (the “Protocol”); the relevant documents are in bold and are collectively referred to as the “Protocol Documents”:
(a) The claimant would contact the defendant to discuss an issue which had arisen with the GOW and which required repair/rectification work to be carried out. A quotation would be issued by the defendant to the claimant for the requisite works that were to be undertaken.
(e) Lastly, the defendant would issue a tax invoice to the claimant.
- [13]
[13] The defendant submits that the Incorporation Clause refers to the 2016 version of its general terms and conditions – this is a two-page set of standard terms containing 19 clauses (the “Sumitomo Standard Terms”). Of particular relevance to the dispute is clause 17 of the Sumitomo Standard Terms (“Clause 17”), which reads:
- [15]
[15] It bears emphasising that while the Protocol was generally followed, this was not always the case – for example, works would sometimes commence before the exchange of documents.
- [16]
[16] Leaving aside the question of incorporation of the Sumitomo Standard Terms, both parties accept that generally, the Protocol Documents capture the terms of the defendant’s engagement by the claimant. As I discuss in greater detail later in this judgment (at [96] below), the defendant relies on this “concession” from the claimant in support of its case.
Reconditioning Works on the Drive Shafts
- [17]
[17] Factual disputes permeate throughout this case, but what follows is an outline of the (largely) undisputed facts.
- [18]
[18] Sometime in or around February 2017, abnormal noises were detected emanating from the DW3 Drive Module. Investigations were conducted, and it was discovered that the diameter of the DW3 Upper Drive Shaft had reduced to a level below the prescribed specifications. Figure 3 (at [5] above) illustrates where the Drive Shaft for each Drive Wheel is located.
- [19]
[19] The exact contents of the discussions that followed between the parties are disputed. Mr Roy Ho and Mr Albert Lim both said that they had recommended to Mr Stanley Loke that the DW3 Upper Drive Shaft be replaced, but that the suggestion was not accepted because it would have been too expensive for the claimant. Mr Stanley Loke disagreed, and could not recall Mr Roy Ho ever making such a recommendation. For completeness, I note that the claimant’s closing submissions appear to accept the version of events set out at paragraph 12 of Mr Albert Lim’s AEIC. This would include the alleged recommendation made to Mr Stanley Loke to replace the DW3 Upper Drive Shaft. That having been said, I have not given much weight to this “concession” as nothing substantive turns on whether the defendant’s employees had actually made the recommendation, apart from lending credence to its version of events.
- [20]
[20] Regardless, it is agreed that at some point, the defendant’s employees raised three possible solutions to Mr Stanley Loke to address the drive shaft tolerance issue. These solutions were: (a) metal spraying; (ii) metal chroming; and (iii) re-bushing. Metal spraying and metal chroming “involve applying a layer of metal to a metal shaft to return it to its original diameter”. Re-bushing involves the installation of a “sleeve or collar on a metal shaft to return it to its original diameter”. For clarity, a “sleeve” in the context of these proceedings refers to a “Speedi-sleeve” – this is an off-the-shelf product manufactured by the company “SKF”, and it comes in the form of a single metal “ring” which slides onto the shaft. “Collaring” work, by contrast, involves placing two semi-circular metal pieces around the shaft and welding them together.
- [21]
[21] Mr Stanley Loke opted to perform re-bushing on the DW3 Upper Drive Shaft. At trial, Mr Stanley Loke suggested that he understood that the re-bushing works would take the form of applying a sleeve to the shaft (as opposed to installing a collar). The circumstances surrounding how this purported misunderstanding arose were not canvassed in detail, but the undisputed fact remains that ultimately, a collar was installed around and welded to the DW3 Upper Drive Shaft – henceforth, the addition of a collar to a Drive Shaft will be referred to as “Reconditioning Works”. After the Reconditioning Works were completed, the DW3 Upper Drive Shaft was eventually reinstalled on or around 7 March 2017. The DW3 Upper Drive Shaft was the first time that Reconditioning Works had been conducted on any of the Drive Shafts.
- [22]
[22] From March 2017 to August 2017, Reconditioning Works were also conducted on three other Drive Shafts: DS3 Lower, DN2 Upper, and DE1 Lower. Mr Stanley Loke’s evidence was that he had told Mr Roy Ho to go ahead with the “hard chroming method instead of re-bushing from the second shaft onwards” [emphasis added]. I will leave my findings on this for later on in my analysis but it suffices to say at this point that it is undisputed that Reconditioning Works were in fact performed on these three shafts as well.
- [23]
[23] The following table sets out the approximate dates of the first four sets of Reconditioning Works on the Drive Shafts:
- [24]
[24] Protocol Documents were issued for the Reconditioning Works performed for these four Drive Shafts. Mr Stanley Loke was brought through some of these documents at trial and confirmed that (at least for the DW3 Upper Drive Shaft and the DN2 Upper Drive Shaft) these were the correct documents issued for the Reconditioning Works undertaken for the relevant Drive Shafts. As an example, Mr Stanley Loke confirmed that the quotation issued in respect of the Reconditioning Works for the DW3 Upper Drive Shaft bore reference number “QSSC-170038”, and was found at page 1344 of the agreed bundle of documents (“ABOD”). Mr Stanley Loke was not taken to the documents pertaining to the DE1 Lower Drive Shaft. I am nonetheless prepared to accept that, subject to the qualification at [25] below, the Protocol Documents listed in the index to the ABOD are the correct documents issued for the Reconditioning Works – more so since neither party has disputed the correctness of the documents listed therein. Indeed, both parties’ affidavits and submissions appear to work off the common understanding that the documents listed in the index to the ABOD accurately reflect the Protocol Documents issued for each of the Reconditioning Works.
- [25]
[25] As for the DS3 Lower Drive Shaft, there was an evidentiary hiccup at trial relating to the correct document representing the quotation for the Reconditioning Works performed on the DS3 Lower Drive Shaft. Mr Lim Yee Ming subsequently tendered Exhibit D1, which is ostensibly the correct quotation for those works. No one from the defendant was asked to confirm this, and as no dispute was raised by Mr Wong on the document or its accuracy, I am content to accept the accuracy of Exhibit D1.
- [28]
[28] Second, it would be apparent from the table at [26] that the quotations for the DS3 Lower and DE1 Lower Reconditioning Works have the same reference number of “QSSC-170048”. This is because the quotation for DE1 Lower had been mixed up with the quotation for DS3 Lower in the evidentiary hiccup I had alluded to earlier (see above at [25]). Nevertheless, I do not think this raises any concerns. While the reference numbers and dates of the two quotations are identical, their contents, including the final sums quoted, are not. As neither party has raised any issue with the state of the documents, I need not say any more on it.
- [29]
[29] Lastly and most importantly, Mr Stanley Loke confirmed at trial that the Reconditioning Works for the DW3 Upper Drive Shaft were referred to in the Protocol Documents by the following description (or a description in similar terms): “Repair shaft assembly for worn bearing seating” (henceforth, the “Repair Shaft Description”). There was no dispute that this same Repair Shaft Description (or a description in substantially similar terms) appears in all the Protocol Documents for the other three Drive Shafts which underwent Reconditioning Works.
The DW3 Lower Drive Shaft
- [30]
[30] On or around 7 August 2017, abnormal noises were heard from the DW3 Lower Drive Shaft. While the exact sequence of events that followed is still somewhat hazy, what is clear is that at some point, the DW3 Upper and Lower Drive Shafts were removed together and brought back to the defendant’s workshop, where the defendant was instructed to replace the bearings for the DW3 Lower Drive Shaft.
- [32]
[32] After reinstallation, abnormal noises persisted from the DW3 Lower Drive Shaft. In September and October 2017, the DW3 Lower Drive Shaft underwent a chroming process to increase its shaft tolerance from a “h6” value to a “p6” value (the “DW3 Lower Chroming”). The defendant contends that it had referred the claimant to its sub-contractor, Ri Jia Engineering Service Pte Ltd, for the chroming works and was subsequently not involved in those works. But nothing substantive turns on this as it is not in dispute that chroming works were in fact carried out. Further troubleshooting tests were conducted on 25 and 27 October 2017 and it appears that the problem abated as the following months passed without incident.
- [33]
[33] On 25 January 2018, the DW3 Lower Drive Wheel broke from its shaft (the “Incident”), causing the DW3 Lower Drive Wheel to fall onto the GOW’s service platform. The next day, the Building and Construction Authority issued a Notice and Direction under s 54(2) of the Amusement Rides Safety Act (Cap 6A, 2012 Rev Ed) applicable at the time, ordering the claimant to suspend operation of the GOW until further notice. Operations were eventually allowed to resume at 50% capacity on 31 March 2018. Full operational capacity was only restored just over a full year after the Incident, on 31 January 2019.
Background to the dispute
- [34]
[34] Various expert reports were commissioned by the claimant and its insurer to investigate the cause(s) of the Incident. The claimant’s position, arising from some of the findings in these reports, is that the Incident was caused by the DW3 Lower Reconditioning Works undertaken by the defendant. Amongst other things, the claimant avers that the DW3 Lower Reconditioning Works had been performed without its knowledge and / or authorisation, and that by negligently recommending an inappropriate method of repair and / or otherwise causing the Incident, the defendant had acted in breach of contract and / or negligently. The claimant seeks special damages in excess of $380,000, and estimates that its loss of profit arising from the (full and partial) closures of the GOW is in excess of $9 million.
- [35]
[35] Two of the defendant’s arguments in response are relevant here:
(a) First, the DW3 Lower Reconditioning Works were authorised by the claimant.
(b) Second, the claimant’s damages (if any) are limited to the “price of the subject Equipment” pursuant to Clause 17 of the Sumitomo Standard Terms, which the defendant says have been incorporated into the parties’ contractual relationship by virtue of the Incorporation Clause.
- [36]
[36] Evidently, if the Sumitomo Standard Terms were successfully incorporated into the parties’ contractual relationship, Clause 17 might have the effect of significantly limiting the claimant’s recoverable damages (if any).
Issues
(a) “[w]hether the Defendant’s standard Terms and Conditions, in particular clause 17 thereof, … are incorporated into the contract entered into between the Defendant and the Claimant on or around August 2017 and are binding and applicable to the Claimant’s claim against the Defendant for the alleged breach of contract in relation to the Reconditioning Works … on the DW3 Lower Drive Shaft” (the “Incorporation Issue”); and
(b) “[w]hether the Reconditioning Works were part of the contracted scope of works and were undertaken with the knowledge and authorisation of the Claimant” (the “Authority Issue”).
- [38]
[38] I will consider the Authority Issue first as it is a threshold issue – in my view, the Incorporation Issue will cease to be relevant if the DW3 Lower Reconditioning Works were not even part of the contracted scope of works in the first place.
Authority Issue
The parties’ cases
- [39]
[39] The claimant accepts that in August 2017 the defendant was authorised to remove the DW3 Lower Drive Shaft, whereupon it was brought into the defendant’s workshop for examination. It also accepts that the defendant was authorised to replace the bearings of the DW3 Lower Drive Shaft when it was at the defendant’s workshop. However, it claims that the defendant went further to perform the DW3 Lower Reconditioning Works without the claimant’s knowledge or instruction. It also disclaims knowledge that AMC had been engaged to carry out the DW3 Lower Reconditioning Works. The claimant says that it only became aware of the DW3 Lower Reconditioning Works after the Incident – in support of its case, it points to the fact that it is unable to find any Protocol Documents referencing the DW3 Lower Reconditioning Works.
- [40]
[40] In its closing submissions, the claimant makes reference to Mr Stanley Loke’s evidence that (a) when he gave approval to proceed with re-bushing of the DW3 Upper Drive Shaft, he understood that a “Speedi-sleeve” would be applied (instead of the collaring works that were eventually conducted) (above at [21]); and (b) that he intended to approve hard chroming instead of re-bushing in respect of the remaining Drive Shafts (above at [22]). No explicit submission is made from these two aspects of Mr Stanley Loke’s evidence, but the implication appears to be that the defendant’s history of not following instructions and / or acting without authorisation would lend credence to the claimant’s account that the defendant had gone on a frolic of its own with respect to the DW3 Lower Reconditioning Works.
- [41]
[41] The defendant’s case is that it would always obtain the claimant’s approval before commencing Ad Hoc Works. It alluded to receiving documents from the claimant comprising “method statements or written instructions setting out the proper procedures and/or methodologies it requires [the defendant] to follow when conducting the Ad Hoc Works” – the defendant refers to these as “Work Instructions”.
- [43]
[43] The defendant’s evidence relating to the Reconditioning Works conducted for the remaining four Drive Shafts (including the DW3 Lower Reconditioning Works) was materially the same. Mr Roy Ho and Mr Albert Lim were only able to say that they would not have performed any works without Mr Stanley Loke’s confirmation.
- [44]
[44] As to Mr Stanley Loke’s allegation that he gave instructions to do hard chroming, the defendant submits that this allegation is not supported by the evidence. The DW3 Lower Chroming (see above at [32]) was the first time that the parties partook in discussions on chroming processes. The extensive emails surrounding the DW3 Lower Chroming suggest that if Mr Stanley Loke had indeed given instructions to do hard chroming, similar discussions would have been produced in evidence – but there is no evidence of any such discussion. In any event, Mr Stanley Loke must have been aware that the Reconditioning Works were being performed.
- [45]
[45] The defendant points to the fact that Mr Stanley Loke accepted that the Protocol Documents referred to the Reconditioning Works using the Repair Shaft Description (see above at [29]). This description was consistent across all of the first four Drive Shafts, the sole exception being the fifth and last ie, the DW3 Lower Reconditioning Works, for which there are no Protocol Documents available.
- [47]
[47] The defendant also refers to an email chain between Mr Roy Ho and Mr Stanley Loke which spans from 28 March to 29 May 2017. Of particular relevance is an email from Mr Stanley Loke to Mr Roy Ho on 29 May 2017, in which Mr Stanley Loke asks Mr Roy Ho to amend a table he has attached to the email (the “29 May Table”). Mr Roy Ho replies in about ten minutes with the amended table, as shown in Figure 5 below:
- [48]
[48] One of the middle columns (highlighted in yellow) is titled “Rework shaft bearing seat” (ie, words similar to the Repair Shaft Description). This column also accurately reflects that the Reconditioning Works had already been performed on the DN2 Upper Drive Shaft, the DS3 Lower Drive Shaft, and the DW3 Upper Drive Shaft. The DE1 Lower Drive Shaft is not reflected in this table because the Reconditioning Works were only performed on it around a day later on 30 May 2017 (see above at [23]). The defendant says that by asking Mr Roy Ho to amend this table, Mr Stanley Loke must have been familiar with its contents, and would have known that Reconditioning Works had been conducted on the three collared shafts listed there.
- [49]
[49] Lastly, the defendant proffered an explanation for the lack of documentation surrounding the DW3 Lower Reconditioning Works: Mr Stanley Loke had allegedly mentioned on multiple occasions that the claimant was suffering from budget constraints (see above at [19]). Mr Roy Ho recalled that the claimant had requested for a discount on the Ad Hoc Works relating to the DW3 Lower Drive Shaft due to these budget constraints. In the circumstances, it was decided that the defendant would not charge the claimant for the DW3 Lower Reconditioning Works (the “Goodwill Discount”). In turn, Mr Roy Ho asked the defendant’s sub-contractor AMC for a similar discount. The defendant stresses that it would not have waived its charges “if there had not been a request for the same”.
- [51]
[51] I was also brought to a letter from AMC to the defendant dated 21 August 2017 (the “AMC Letter”), which the defendant says was also issued following its request to discount the DW3 Lower Reconditioning Works. The AMC Letter reads:
- [52]
[52] Somewhat curiously, despite the documentation from AMC evidencing the discount AMC had provided the defendant, the defendant was unable to provide any contemporaneous documents issued by itself or the claimant evidencing the Goodwill Discount.
Analysis and decision on the Authority Issue
- [53]
[53] As should have become apparent from the preceding discussion, the evidence in this case has been far from satisfactory. The defendant alluded to receiving “Work Instructions” (as defined above at [41]), but of the five occasions on which Reconditioning Works were conducted, I only had the benefit of one example of “Work Instructions”, which were purportedly issued in respect of the DW3 Upper Drive Shaft. These instructions comprise a single page drawing exhibited in both Mr Roy Ho’s and Mr Albert Lim’s AEICs, and which I reproduce below as Figure 6:
- [54]
[54] As this drawing did not, on its face, appear to include any sort of instructions from the claimant to the defendant as to the nature and scope of works the claimant wished to be carried out, I sought Mr Roy Ho’s clarification at trial as to whether this drawing actually constituted the “Work Instructions” he referred to in his AEIC. Mr Roy Ho replied: “This is not the work instruction. That is more detailed. On the shaft tolerance.” Further attempts at clarification with Mr Roy Ho and the defendant’s counsel, Mr Lim Yee Ming, were not fruitful and in the end, what Mr Roy Ho had intended “Work Instructions” to mean was still unclear with the only document in support of those “instructions” being the drawing referred to above at [53]. Additionally, and as I had pointed out to the defendant’s counsel, it was not put to the claimant’s witness Mr Stanley Loke in cross-examination that the drawing constituted the instructions from the claimant’s representatives on the works to be carried out to the DW3 Upper Drive Shaft.
- [55]
[55] For completeness, the defendant has exhibited an example of “Work Instructions” purportedly provided in respect of other works. This consisted of an email chain between the claimant and defendant’s representatives. Of note is an email from Mr Stanley Loke dated 5 July 2016, in which Mr Stanley Loke informs one “Marco Wong” from the defendant that “We are fine with the proposed installation date. … Attached picture and drawings for reference”. The picture and drawings are affixed to the email chain and are also in the evidence.
- [56]
[56] I find it difficult to give much (if any) weight to these “instructions” as (i) they were in respect of other works unrelated to any Reconditioning Works, and (ii) Mr Stanley Loke was not brought to these drawings or questioned on them in cross-examination. In respect of the Reconditioning Works, the only document purporting to be “Work Instructions” is the drawing at Figure 6 above. Given these circumstances, I place very little weight on the alleged “Work Instructions” referred to by the defendant in so far as Reconditioning Works were concerned.
- [58]
[58] I turn then to the Protocol Documents exchanged between the parties in respect of the Reconditioning Works performed for the first four Drive Shafts (see above at [26]). Unlike the “Work Instructions” and Mr Roy Ho’s photographs, these Protocol Documents are useful and relevant in assisting to determine the Authority Issue.
- [62]
[62] To summarise:
(a) I find that, on the balance of probabilities, the claimant and / or Mr Stanley Loke knew that the Reconditioning Works had been conducted on the first four Drive Shafts, including the DW3 Upper Drive Shaft. Additionally, the Reconditioning Works on the first four Drive Shafts had been expressly authorised or ratified when Mr Stanley Loke / Mr Fitzpatrick signed off on the respective delivery orders.
(b) As for the fifth shaft, ie, the DW3 Lower Drive Shaft, I also find that the defendant did, at the claimant’s request, grant the Goodwill Discount to the claimant in respect of the DW3 Lower Reconditioning Works.
(c) Taken together, I am persuaded by the defendant’s evidence that it is unlikely they would have not only proceeded with the DW3 Lower Reconditioning Works, but performed those works free of charge, without the claimant’s knowledge, approval and / or authorisation.
- [63]
[63] I am therefore of the view that the Reconditioning Works were part of the contracted scope of works for the DW3 Lower Drive Shaft although eventually, the claimant was not billed for those works. I am also of the view that it is more likely than not that the claimant knew about and / or authorised the DW3 Lower Reconditioning Works. As such, my answers to the questions raised in the Authority Issue are “Yes”.
Incorporation Issue
- [64]
[64] Having found that the DW3 Lower Reconditioning Works did form part of the parties’ contracted scope of works, the second issue concerns whether Clause 17 is part of the parties’ contract for those works. This in turn depends on whether the Sumitomo Standard Terms were successfully incorporated into the parties’ contract, either by virtue of the Incorporation Clause or by some other means. For present purposes, I will refer to the contract between the claimant and defendant in respect of the DW3 Lower Reconditioning Works as the “DW3 Lower Contract”.
The parties’ cases
- [65]
[65] The DW3 Lower Contract was not signed. The defendant’s case is that the Sumitomo Standard Terms were incorporated into the DW3 Lower Contract “by virtue of its past dealings” with the claimant:
(b) In particular, the delivery orders bearing the Incorporation Clause had been signed off by the claimant. Applying the principles set out in Press Automation Technology Pte Ltd v Trans-Link Exhibition Forwarding Pte Ltd [2003] 1 SLR(R) 712, the defendant contends that a party who signs a document giving notice of additional terms is bound by those additional terms, and that this was the case for the Reconditioning Works for the first four shafts. By signing on the delivery orders containing the Incorporation Clause, the claimant had agreed to be bound by the Sumitomo Standard Terms for each of the contracts arising from the first four sets of Reconditioning Works. The defendant also highlights that the claimant has agreed in its pleadings that the terms of the defendant’s engagement are captured in all the Protocol Documents (see above at [16]).
(c) The first four sets of Reconditioning Works were conducted over approximately five months. This meant that the Incorporation Clause “had been repeatedly, and frequently applied to contracts for works between [the] parties”. In other words, there was a prior course of dealing. Further, the defendant contends that the Sumitomo Standard Terms would have been incorporated into all other works it had conducted for the claimant since the Incorporation Clause would also have been present in the Incorporating Documents arising from those other works – this lends further support to establishing a prior course of dealing.
(d) The Sumitomo Standard Terms would have been incorporated into the DW3 Lower Contract due to this prior course of dealing, which concerned (i) works of the same nature as the first four Drive Shafts which underwent Reconditioning Works, and (ii) which took place repeatedly and immediately before the DW3 Lower Contract.
- [66]
[66] Somewhat surprisingly, the claimant does not address the defendant’s submissions on incorporation by a prior course of dealing, notwithstanding that this constitutes a large plank of the defendant’s case. The claimant’s submissions, summarised below, only deal with the issue of whether the Incorporation Clause has been directly incorporated into the DW3 Lower Contract, either by way of signature or reasonable notice:
(a) Only the delivery orders had been signed by the claimant. However, as the delivery orders “were issued after the respective contracts had already been formed”, the Incorporation Clause contained within them did not form part of the parties’ contracts.
(c) In any event, as there was no signed contract, the court needs to consider whether Clause 17 of the Sumitomo Standard Terms is so “onerous or unusual such that the Defendant ought to have brought it fairly and reasonably to the Claimant’s attention”. The defendant should have but failed to bring Clause 17 to the claimant’s attention.
(d) The Sumitomo Standard Terms cannot be incorporated into the DW3 Lower Contract because the Incorporation Clause “does not convey to any third party customer like the Claimant the existence of a separate document which the Defendant is incorporating by way of reference”. It is “wrought with ambiguity” and does not make reference to “any specific terms and conditions”. Mr Ringo Leung explained in cross-examination that he understood the Incorporation Clause to be referring to the Quotation Express Terms instead of some other set of standard terms (see above at [14]).
(e) Lastly, the Incorporation Clause has no legal effect because the Sumitomo Standard Terms had not been implemented at the time of the relevant contracts.
Analysis and decision on the Incorporation Issue
- [68]
[68] Reverting to the analysis proper, standard terms can generally be incorporated into a contract in one of three ways (Wartsila Singapore Pte Ltd v Lau Yew Choong and another suit [2017] 5 SLR 268 at [105]):
- [69]
[69] It is undisputed that in this case, the Incorporation Clause could not have been expressly incorporated into the DW3 Lower Contract by way of signature because there were no written documents, much less any signed documents, expressly referring to the DW3 Lower Contract. The doctrine of incorporation by reasonable notice, as set out in Thornton v Shoe Lane Parking Ltd [1971] 2 QB 163, is also inapplicable in this case because the lack of documentation means that there was no notice of the Incorporation Clause to speak of when it came to the DW3 Lower Contract. In this regard, the claimant’s arguments at [66(b)] were unnecessary.
- [70]
[70] I therefore turn to consider the nub of the case surrounding the Incorporation Clause – were the Sumitomo Standard Terms incorporated into the DW3 Lower Contract by a prior course of dealing? The applicable principles on the question of incorporation by a course of dealing may be summarised as follows:
(a) The applicable test is set out in Vinmar Overseas (Singapore) Pte Ltd v PTT International Trading Pte Ltd [2018] 2 SLR 1271 (“Vinmar Overseas”). The Court of Appeal began by endorsing at [53] the statement in The Law of Contract (Michael Furmston gen ed) (LexisNexis, 6th Ed, 2017) (“Furmston”) that a term is incorporated into a contract by a course of dealings on the basis that “the circumstances are such that, at the time of contracting, both parties, as reasonable persons, would have assumed the inclusion of the [term] in the offer and acceptance” [Court of Appeal’s amendment retained]. The Court of Appeal then endorsed the following statement from Furmston as to the applicable test (at [54]):
(b) A “high threshold must be met” before a court will find that a party is “entitled to infer” the presence of a term from past dealings: Vinmar Overseas at [54].
(c) Factors relevant to the court’s assessment include: “the number of previous contracts, how recent they are, whether they have a similar subject matter and whether they were made in a consistent manner”: Vinmar Overseas at [55].
(d) It is “easier to establish incorporation by a course of dealing[s] where both parties are in business, rather than where one is a consumer”: Vinmar Overseas at [58(a)], citing Furmston.
(e) A term is less likely to be incorporated if it is unusual or unreasonable: Vinmar Overseas at [58(b)], citing Furmston.
(f) The term sought to be incorporated must itself have had contractual force in the prior dealings; thus, a party cannot rely on terms found in prior non-contractual documents such as mere receipts as the terms will (like the documents they are found on) have no contractual force: Nambu PVD Pte Ltd v UBTS Pte Ltd and another appeal [2022] 1 SLR 391 (“Nambu”) at [24].
- [71]
[71] Having regard to these principles, it is my view that the Sumitomo Standard Terms were not incorporated into the DW3 Lower Contract. I have come to this view for the following reasons.
- [74]
[74] It is useful to begin this exercise with the defendant’s quotations, which are chronologically the first of the Protocol Documents issued under the Protocol (see above at [11]). Two features immediately stand out:
(a) First, the defendant’s quotations start with the following statement: “Thank you for your valued inquiry. We are pleased to make the following offer.” [emphasis added] This suggests that the quotation is intended to be an offer capable of being accepted by the claimant, as opposed to merely being an invitation to treat.
(b) Second, the quotations come with the Quotation Express Terms printed near the bottom of the page (see above at [14]). The quotations issued for the first four sets of Reconditioning Works all contain substantially similar Quotation Express Terms. In particular, they all contain a term that the quotation will only be valid for 30 days from the date of issue. This further supports the view that the quotations were intended to be offers capable of being accepted. There would be no need to stipulate a validity period of 30 days if the quotations were not capable of giving rise to legal obligations.
- [76]
[76] The result of the foregoing analysis is that the first three Reconditioning Works contracts were concluded by the claimant’s issuance of the purchase orders, which operated as a valid acceptance of the offers contained in the defendant’s quotations. The defendant also appears to have inadvertently made this same point in its closing submissions, where it argued that:
- [77]
[77] Accordingly, in respect of the first three Reconditioning Works contracts, the Incorporating Documents were issued after the purchase orders were issued. Therefore, the Incorporating Documents were not contractual documents and had no contractual effect; the same goes for the Incorporation Clause contained within them.
- [79]
[79] Regardless, the point remains that for three out of the first four Reconditioning Works contracts, the Incorporation Clause only appeared in non-contractual documents, ie, in documents generated after the conclusion of those contracts (see above at [76]). Applying Nambu, the Incorporation Clause from these three occasions cannot be relied on to establish a prior course of dealing. If that is so, it would then appear that there is only one prior contract for the Reconditioning Works (ie, the works done on the DE1 Lower Drive Shaft) where the Incorporation Clause formed part of the contractual terms, and from which I could infer a course of dealing. However, this is also problematic for the defendant because a single instance is clearly insufficient to support an inference of a prior consistent course of dealings where the Incorporation Clause was part of the parties’ contractual arrangements.
- [81]
[81] I have considered this possibility, but as I explain below, it does not change my analysis. The term sought to be incorporated must appear consistently in the parties’ prior dealings: Vinmar Overseas at [55]. Nambu is binding authority in so far as I am required to ascertain if the term sought to be incorporated is, in the parties’ prior course of dealings, consistently a contractual term. The concern is that “permitting non-contractual documents to give rise to a course of dealing would amount to allowing terms which have been consistently treated by parties as non-binding to take on contractual effect” [emphasis omitted]: Nambu at [42]. Adopting such an approach would defeat the reasonable expectations of parties, who expect that terms which have been consistently non-binding “would remain non-binding for the contract in question” [emphasis in original]: Nambu at [42].
- [84]
[84] Furthermore, one of the factors relevant to my consideration is the similarity of the subject matter in the prior transactions (see above at [70(c)]). On the facts before me, the most similar transactions to the DW3 Lower Contract were the Reconditioning Works undertaken on the first four shafts, of which only one contract incorporated the Incorporation Clause. Even if I assumed that there were a substantial number of other Ad Hoc Works which had successfully incorporated the Incorporation Clause, the approach adopted with respect to the Reconditioning Works would suggest that any prior course of dealing had not been followed by the parties when it came to the Reconditioning Works.
- [85]
[85] For these reasons, even if I expanded the scope of my analysis to consider other Ad Hoc Works apart from the Reconditioning Works relating to the first four Drive Shafts, the defendant is still not able to establish a sufficient prior course of dealings to justify incorporating the Incorporation Clause, or Clause 17 of the Sumitomo Standard Terms, into the DW3 Lower Contract.
- [86]
[86] The preceding discussion is sufficient to dispose of the Incorporation Issue. In sum, the defendant has failed to satisfy me that the Sumitomo Standard Terms, including Clause 17 thereof, were incorporated into the DW3 Lower Contract. Accordingly, my answer to the Incorporation Issue is “No”. For completeness however, I highlight a number of other difficulties with the defendant’s case.
- [87]
[87] For one, I accept the claimant’s submission (at [66(d)] above) that there was no clarity as to which terms and conditions the Incorporation Clause sought to incorporate. It is well established that a contractual term that is too uncertain will simply be unworkable: Kwek Hong Lim v Kwek Sum Chuan [2023] SGHC 67 at [87].
- [88]
[88] In this regard, I find the approach adopted by Justice Quentin Loh in Global Switch (Property) Singapore Pte Ltd v Arup Singapore Pte Ltd [2019] SGHC 122 (“Global Switch”) to be instructive. The case concerned a dispute between “GSS”, an owner / operator of data centres, and “Arup”, their consultant engineers (at [1]). Arup contended that paragraph 8 of their fee proposal incorporated the “ACEA Form Contract” into the parties’ contract; paragraph 8 was in the following terms (at [21]):
- [89]
[89] Similar to the present case, no form was attached to the fee proposal (Global Switch at [21]). Despite there being “more than one type of ACEA Form Contract”, no evidence was led “as to how widespread this Australian form’s use was in Singapore or how the industry would have understood what the phrase ‘ACEA Form Contract’ meant” (Global Switch at [112]). Justice Loh held that it was not for the court to make a contract for the parties when a term was unclear, and in the circumstances, Arup had “not made out its case that the ACEA Short Form Contract has been incorporated into the Contract” (Global Switch at [113]).
- [90]
[90] These principles are equally applicable to the present case. To recapitulate, the Incorporation Clause stated that “[a]ll business is undertaken in accordance with our terms and conditions”. It is undisputed that no terms and conditions were attached to the Protocol Documents, and it was Mr Ringo Leung’s evidence that the first time the claimant had received or seen a copy of the Sumitomo Standard Terms was in March 2018, after the Incident had occurred. Mr Ringo Leung’s evidence was not challenged or countered in any way – the defendant was not able to provide evidence of even a single instance prior to the Incident where it had transmitted or communicated the Sumitomo Standard Terms to the claimant in some way. In the absence of any evidence to counter Mr Ringo Leung’s evidence, I accept the claimant’s evidence that it was not aware, nor did it have a copy of, the Sumitomo Standard Terms prior to the Incident.
- [93]
[93] The defendant points out that the “delivery and payment terms” in the Quotation Express Terms were already recorded in the Conditions, thus rendering the claimant’s interpretation of the Incorporating Clause superfluous.
- [94]
[94] While on its face, the “Conditions” appear to replicate some of the Quotation Express Terms, I do not think this detracts in any material way from the reasonableness of the claimant’s position (at [64(d)]) that it understood the Incorporation Clause to refer to the Quotation Express Terms. Nor do I agree that it would render the Incorporation Clause redundant. For one, the terms found in these Conditions are not clearly identical – for example, it is not certain whether “EXW” under the “Delivery condition” category is meant to have the same meaning as “Ex-works Singapore” under the “Price” category in the Quotation Express Terms (see above at [14]). Further, no evidence was adduced by any party as to the exact purport of the Conditions. As for the defendant’s contention that the Conditions were intended to replicate the Quotation Express Terms, there was no such evidence forthcoming from the defendant’s witnesses in support of such a contention. In these circumstances, it would not be safe or proper for me to assume or infer that the Conditions merely repeated the Quotation Express Terms or that the Incorporation Clause would be rendered superfluous if the claimant’s evidence (above at [66(d)] were accepted.
- [95]
[95] Thus, even if the Incorporating Documents had contractual effect and the Incorporation Clause was a term of the DW3 Lower Contract by virtue of a prior course of dealing, I would be prepared to find that the Incorporation Clause was in any case too vague and uncertain as to be capable of incorporating the Sumitomo Standard Terms into the DW3 Lower Contract. The end result would thus remain unchanged – the Sumitomo Standard Terms (including Clause 17) would not be incorporated into the DW3 Lower Contract.
- [96]
[96] The final section of this judgment considers the defendant’s submission (above at [65(b)]) that the claimant has conceded that the terms of the defendant’s engagement are captured by all the Protocol Documents (ie, including the Incorporating Documents and by extension, the Incorporation Clause). It is true that parties are generally bound by their pleadings, but there are a few reasons why I do not think the claimant’s “concession” is fatal to its case.
- [97]
[97] The alleged concession arises from paragraph 7 of the claimant’s Statement of Claim, which reads:
The claimant then goes on to list out the Protocol Documents as the “following documents”.
- [98]
[98] First, it is not readily apparent to me that the reference to “terms of … engagement” in paragraph 7 was intended to be a concession as to the contractual nature of the Protocol Documents, as opposed to what may be described as loose drafting. A more generous interpretation might interpret the phrase as referring to both contractual and non-contractual terms; the latter might include operational and / or administrative statements as to receipt, delivery, and payment.
- [99]
[99] In any case, I do not think that it would be fair to strictly bind the claimant to its “concession” in this case. Pleadings serve to “ensure that each party [is] aware of the respective arguments against it and that neither [is] therefore taken by surprise”: Ma Hongjin v SCP Holdings Pte Ltd [2021] 1 SLR 304 at [35]. Hence, the court may sanction a departure from the pleadings “where no prejudice is caused to the other party in the trial or where it would be clearly unjust for the court not to do so”: V Nithia (co-administratrix of the estate of Ponnusamy Sivapakiam, deceased) v Buthmanaban s/o Vaithilingam and another [2015] 5 SLR 1422 at [40]. In my view, no prejudice will be caused to the defendant. The defendant addressed the issue of whether its delivery orders were contractual in nature extensively in its reply submissions. Additionally, this issue simply involves a finding of fact which I had to make on the documents available before me – no further evidence or cross-examination at trial would have assisted the defendant on this issue, even if it had been given the opportunity to do so.
- [100]
[100] I would end by noting that even if the claimant is held to its “concession” in its pleadings, there would still be no difference in outcome on the Incorporation Issue. This is because I have found above (at [95]) that even if the Incorporation Clause was a term of the DW3 Lower Contract, it was too vague and uncertain to have any effect and accordingly, would not have incorporated the Sumitomo Standard Terms in any event.
Conclusion
- [101]
[101] For the foregoing reasons, my decision on the two preliminary issues is as follows:
(a) On the Authority Issue, the Reconditioning Works on the DW3 Lower Drive Shaft were part of the contracted scope of works and were undertaken with the knowledge and authorisation of the claimant; and
(b) On the Incorporation Issue, the defendant’s standard Terms and Conditions (ie, the Sumitomo Standard Terms) were not incorporated into the contract entered into between the defendant and the claimant on or around August 2017 and are not binding and applicable to the claimant’s claim against the defendant for the alleged breach of contract in relation to the Reconditioning Works on the DW3 Lower Drive Shaft.