District Court · Decided 1 September 2026
EG Development Pte. Ltd. v Our Cocomo Pte. Ltd. & anor
Feedback & support[2026] SGDC 280 · Case no. [2026] SGDC 280
✱ What happened, in plain English
There is no plain-English summary of this judgment yet.
Ask about this judgment →Laws this judgment relies on
Grounds of decision
Official text from eLitigation
- [1]
[1] EG Development Pte Ltd (“EGD” or the “Claimant”) is the subsidiary proprietor of, and the owner entitled to possession of the property known as 81 Lorong K Telok Kurau #05-06 Singapore 425711, Cubik (the “Premises”). By a tenancy agreement in writing dated 9 May 2023 (the “First Tenancy Agreement”), EGD let to Our Cocomo Pte Ltd (“Cocomo” or the “First Defendant”) the Premises for 12 months, commencing 31 May 2023 at a monthly rent of $8,888 payable monthly in advance without deduction whatsoever on the last day of each calendar month. By a second tenancy agreement in writing dated 15 March 2024 (“Second Tenancy Agreement”), the lease was renewed for another term of 12 months commencing 31 May 2024 at a monthly rent of $7,800. Won Shi Lin Yura (“Yura” or the “Second Defendant”), the sole shareholder and a director of Cocomo, is listed as an occupier of the Premises under the tenancy agreements. Cocomo and Yura are collectively referred to as the “Defendants”.
The Claimant’s case
- [2]
[2] EGD claimed that in breach of clause 7(a) of the Second Tenancy Agreement, Cocomo failed to pay rent of $7,800 from 31 July 2024. By way of a letter dated 13 August 2024, EGD demanded from Cocomo payment of all rent in arrears including interest on arrears calculated in accordance with clause 7(c) of the Second Tenancy Agreement within a day. By way of the same letter, EGD also notified Cocomo to deliver up possession of the Premises by 19 August 2024. As Cocomo did not do so, EGD claimed that it is entitled, under clause 7(a) of the Second Tenancy Agreement, to re-enter the Premises and terminate the Second Tenancy Agreement. Pursuant to section 28(4) of the Civil Law Act 1909, EGD claimed double-rent as against Cocomo at the rate of $15,600 per month commencing 20 August 2024.
- [3]
[3] EGD claimed that Cocomo had also breached clauses 4(d), 4(h) and 4(n) of the Second Tenancy Agreement.
- [4]
[4] First, Cocomo has failed to allow EGD’s pool maintenance contractor to enter the Premises for the purposes of maintaining the swimming pool. EGD claimed that during the period when the First Tenancy Agreement was in force, there were 12 occasions where Cocomo, through Yura, had failed to allow its pool maintenance contractor to enter the Premises for the weekly cleaning of the Premises’ swimming pool despite advance notice. This amounted to a breach of clause 4(h) of the First Tenancy Agreement under which Cocomo agreed to permit EGD and its agents, surveyors and workmen with all necessary appliances to enter upon the Premises at all reasonable times by prior appointment for the purpose whether of viewing the condition thereof or of doing such works and things as may be required for any repairs, alterations or improvements whether of the Premises or of any parts of any building to which the Premises may form a part of or adjoin.
- [6]
[6] Cocomo, through Yura, had also failed to allow the pool maintenance contractor to enter the Premises for the weekly cleaning of the swimming pool on 7 August 2024, 25 September 2024, 28 September 2024 and 2 October 2024.
- [7]
[7] Secondly, EGD claimed that Cocomo had failed to properly maintain the Premises.
- [8]
[8] As against Cocomo, EGD claimed (a) rent amounting to $5,032.26 for the period from 31 July 2024 to 19 August 2024; (b) double rent at the rate of $15,600 per month from 20 August 2024 until delivery up of possession of the Premises; (c) damages to be assessed in respect of Cocomo’s breaches of clauses 4(d), 4(h) and/or 4(n) of the tenancy agreements.
- [9]
[9] As against Yura, EGD claimed that as director of Cocomo and occupier of the Premises under the tenancy agreements, she owed a duty of care to EGD to comply with clauses 4(d), 4(h) and 4(n) of the tenancy agreements. It was reasonably foreseeable that Yura’s failure to properly maintain the premises would cause harm to EGD. EGD therefore claimed against Yura damages to be assessed for breaches of her duty of care.
- [10]
[10] In the affidavit of Pun Chiu (“Cynthia”), the Claimant quantified the damages to be in the sum of $84,584.18. The amount comprises
The Defence and Counterclaim
- [11]
[11] Cocomo admitted that rent has not been paid from 31 July 2024. However, Cocomo claimed that it is entitled to set-off its own claims for EGD’s own breaches of the tenancy agreement. Cocomo disputed that the 13 August 2024 letter amounted to the exercise of the right of re-entry under clause 7(a) of the Second Tenancy Agreement and that the lease was determined on 20 August 2024. Cocomo’s position is that the amount of rent that double rent is calculated from should be reduced owing to the defects to the Premises which EGD has failed to satisfactorily rectify. The Defendants vacated the Premises on 9 November 2024.
- [12]
[12] The Defendants denied that they had breached clause 4(h) of the First Tenancy Agreement. Their position was that EGD had informed them that the pool maintenance service was optional and that they were entitled to decline pool maintenance services at their convenience, as pool maintenance was always conducted every Wednesday morning when Yura was usually at work and not at the Premises. EGD did not insist on the necessity of pool maintenance to the Defendants until around April 2024. Nevertheless, the pool maintenance contractor was allowed into the Premises as and when Yura was at home when they visited.
- [14]
[14] In respect of EGD’s claims, Cocomo averred that any claim needs to be set off against the security deposit of $8,888 that has already been paid to EGD.
- [15]
[15] Yura denied that there is any breach in respect of any duty of care owed to EGD in their landlord-occupier relationship.
Counterclaim
- [16]
[16] Cocomo claimed that under the tenancy agreements, EGD owed the following obligations in respect of the Premises
- [17]
[17] Yura claimed that she is also entitled to the benefits of the above-mentioned terms of the tenancy agreements pursuant to the Contracts (Rights of Third Parties) Act 2001. In the alternative, EGD owed Yura a common law duty of care as between landlord and occupier to ensure that the Premises were free from water seepage, electrical defects and that the development was safe and secure.
- [18]
[18] The Defendants claimed that EGD breached such obligations by failing to address severe and chronic water seepage on the Premises. The Defendants referred to the following list of water seepage events:
- [19]
[19] The Defendants also claimed that the Premises was plagued by electrical issues such as the following:
- [20]
[20] The Defendants claimed that the water seepage and flooding caused damage to the Defendants’ belongings including:
- [21]
[21] Cocomo also claimed damages to be assessed for the inability to use various parts of the Premises as intended and that the measure of damages should be an abatement of rent for the period which the use of the Premises is disrupted due to the water seepage and electrical issues. Yura also claimed for loss of amenity caused by stress and inconvenience, as well as the additional time spent maintaining the unit to address the water seepage and electrical issues quantified at $40,000. Yura also claimed the amount of $801.45 on additional cleaning materials as well as dehumidifiers at $1,500. The Defendants claim a total of $122,755.22 as damages.
The Defence to the Counterclaim
- [23]
[23] EGD claimed that prior to Yura moving into the Premises in or around May 2023, EGD’s property agent and one of EGD’s former employees, Caroline, had conducted a joint inspection with Yura and the Premises were observed to be in a proper and habitable condition. Once Cocomo took over possession of the Premises pursuant to the tenancy agreements, the obligation is on Cocomo and Yura to maintain the Premises. The water seepage and electrical issues were the result of the Defendants’ own breaches of their obligations. The Defendants are estopped from raising water seepage or electrical or security issues within the Premises given that Cocomo had entered into the Second Tenancy Agreement albeit at a lower rent of $7,800 notwithstanding its full awareness of the same by then and had refused to vacate the Premises despite its breaches of its obligations under Clause 7(a) of the tenancy agreements.
- [24]
[24] EGD had requested its contractor to rectify the electrical issues at their convenience without charging the Defendants, purely out of goodwill. Nevertheless, EGD referred to clause 7(b) where the landlord is not to be held to have waived the conditions where the landlord has permitted the tenant to do any act in breach of the conditions and the landlord shall always have the right to enforce such conditions or stipulations notwithstanding any antecedent breach of the conditions or stipulations permitted by the landlord.
- [25]
[25] EGD claimed that the alleged losses were the result of the Defendant’s own breaches of their obligations under the tenancy agreements and/or under common law and were hence self-inflicted. In addition, the Defendants have failed to mitigate their losses in so far as they had failed to properly store their luxury and/or valuable items at appropriate locations despite being fully aware of the alleged water seepage issues.
Issues
- [26]
[26] The Defendants stated in their closing submissions that they would not be pursuing their claim against EGD in relation to the security issue. Hence, what remains in dispute is whether there has been a breach of the tenancy agreements by the parties in respect of the water seepage incidents and the electrical issues. The issues to be determined are as follows:
Amount of rent payable
- [27]
[27] Clause 4 of the Second Tenancy Agreement requires the tenant to “pay the said rent and hiring charges at the times and in the manner aforesaid without any deduction whatsoever”. Clause 7 of the Second Tenancy Agreement goes on to provide as follows:
- [28]
[28] EGD claimed that Cocomo has failed to pay rent of $7,800 from 31 July 2024 in breach of Clause 7(a) and 7(c) of the Second Tenancy Agreement. EGD had written to Cocomo on 13 August 2024 to give written notice for them to vacate the unit by 19 August 2024. On 23 August 2024 , EGD wrote to Cocomo again to serve notice to vacate the unit within 7 days. EGD claimed that the unpaid rent amounted to $46,296.78 comprising $5,032.26 of unpaid rent from 31 July 2024 to 19 August 2024 for 20 days and double rent of $41,264.52 from 20 August 2024 to 9 November 2024 for 82 days. It is not disputed that the Defendants vacated the Premises on 9 November 2024.
- [29]
[29] Pursuant to clause 7(a) of the Second Tenancy Agreement, EGD was entitled to exercise its right of termination as a result of unpaid rent. While Cocomo pleaded that it was entitled to set off its own claims for EGD’s breaches of the Second Tenancy Agreement, what is in dispute is when double rent should be payable. EGD claimed that double rent should be payable from 20 August 2024 as the 13 August 2024 letter amounted to the exercise of the right of entry under clause 7(a) of the Second Tenancy Agreement and the lease was determined on 20 August 2024. The Defendants disputed this and argued that if the Court was minded to award double rent to EGD, the earliest it should do so was from 18 October 2024 which was the date the originating claim was served on Cocomo.
- [30]
[30] EGD’s claim for double rent is pursuant to section 28(4) of the Civil Law Act 1909 which provides
- [31]
[31] Pursuant to clause 7(a) of the Second Tenancy Agreement, it was the re-entry into the Premises which determines the Second Tenancy Agreement.
- [32]
[32] In Campbell Hospitality Pte Ltd & ors v Marchmont Pte Ltd and another appeal [2025] 1 SLR 816, the Appellate Division of the High Court was of the view at [60] – [61] that the exercise of a landlord’s contractual right to terminate was insufficient to bring the tenant’s proprietary interest to an end and that a notice of termination was insufficient to operate as forfeiture. The tenancy was forfeited only upon the commencement and service of the originating claim.
- [33]
[33] In the present case, the originating claim was stated to be served on the Defendants on 18 October 2024. In the circumstances, double rent should only run from 18 October 2024.
- [34]
[34] The amount of unpaid rent therefore amounts to the sum of $31,703.22, being the sum of the following:
Was there a breach of the tenancy agreements by Cocomo?
- [35]
[35] EGD claimed that Cocomo had breached clauses 4(d), 4(i) and 4(o) of the Second Tenancy Agreement and that Yura had breached her duty of care to EGD in failing to keep the Premises in good and tenantable condition, fair wear and tear excepted, and to yield up the same in such condition, resulting in damages to EGD. The damages were quantified as follows:
Invoice on 29 December 2023 for rectification works
- [36]
[36] The invoice on 29 December 2023 related to the water leakage from the water heater of the Premises. Specifically, the items of work done were (a) urgent inspection of water leakage; (b) replacement of water heater pipe; (c) reinstatement of false ceiling of the master toilet and making good with paint; and (d) painting and making good the master bedroom ceiling and the toilet ceiling of the unit below.
- [37]
[37] I noted that the water leakage issues in the master toilet were first highlighted by Yura to Dominic, EGD’s representative by WhatsApp on 17 November 2023 . On 24 November 2023, Dominic informed Yura that the plumbing company would come the next day to change the heater and fix the pipes and they subsequently arranged this to be done on 27 November 2023. However, it is unclear if any work was done on 27 November 2023, given that Yura complained about the inability to use the master toilet and swimming pool on 18 December 2023 and highlighted at 9:28 a.m. on 19 December 2023 that the neighbour below came up to complain to her that his unit was affected and that it was also the master bedroom toilet that was leaking .
- [38]
[38] Subsequently on 19 December 2023 at 10:18 a.m., Yura reported that her whole house was flooded . She discovered that a bidet hose in the common toilet had burst and that water was dripping from the ceiling of her daughter’s room causing her sheets to be soaked with water . It would appear from the WhatsApp messages between Yura and Dominic that the swimming pool cleaner and a worker sent to do waterproofing subsequently turned up on 20 December 2023 to perform the services . This was consistent with the invoice from Guan Teck dated 29 December 2023 where the completion form was dated 23 December 2023 .
- [39]
[39] Based on the evidence, the water seepage issues on 17 November 2023 stemmed from a water heater pipe concealed in the false ceiling of the master bedroom toilet. It was unrelated to any issues with the swimming pool and neither the Claimant’s expert, Mr Chin Cheong nor the Defendants’ expert, Mr Toh Thye Ann Jeffrey suggested otherwise . In fact, Mr Chin agreed that it was more likely that the water seepage in November 2023 was due to the water heater pipe and not from the swimming pool .
- [40]
[40] As for the water seepage on 19 December 2023, the cause is unclear. The experts offered little assistance in this regard. There is no evidence as to how regularly the swimming pool was maintained prior to this date. Mr Chin’s postulation that the water seepage was because the tenant/occupier did not close the window and sliding glass door properly during rainy days was speculative given that Yura was in the Premises when she reported the flooding. The postulation that the water seepage was due to the air conditioning unit was also unsupported.
- [41]
[41] The water seepage issues appeared to be arrested after the rectification works on the water heater pipe as there did not appear to be any further complaints relating to water seepages after 20 December 2023 in the WhatsApp chat group between Yura, Lionel, Yura’s partner, and Dominic. The complaints from Yura between 21 December 2023 and 17 April 2024 relate to a rectification of the vinyl flooring as exposure to water caused by the prolonged seepage issues had caused the vinyl flooring to retain moisture, crack and peel, resulting in sharp floor edges . Given that the water heater pipes did not appear to be rectified until after 19 December 2023, after which any water seepage issues appeared to be arrested, I am of the view that the water seepage incident on 19 December 2023, affecting the neighbour below, and where water was dripping from the ceiling of her daughter’s room, was not caused by the burst bidet.
- [42]
[42] Under clause 6(c) of the First Tenancy Agreement, the landlord is the one responsible for keeping the “roof, ceiling, main structure, walls, floors, wiring and pipes” of the Premises in good and tenantable repair and condition. The tenant on the other hand is responsible under clause 4(d) to keep and maintain at the tenant’s expense “all the interior of the said Premises including the kitchen and lavatories therein, the flooring and interior plaster or other finishing materials to walls floor and ceiling and the Landlord’s fitting, fixture and furniture therein including but not limited to all doors and door locks, windows, electrical installations, pipes, drains, cable, wiring, ducting or main supplies and closets in good clean tenantable and proper repair condition, fair wear and tear excepted.” While there appeared to be an overlap between the reference to “electrical installations, pipes, drains, cable, wiring, ducting” in clause 4(d) and “wirings and pipes” in clause 6(c), I accepted the Defendants’ argument that the scope of the obligations in clause 4(d) is expressly limited and governed by the terms “all the interior”.
- [43]
[43] As Mr Toh pointed out, the occupant did not have direct access to the water heater. As such, repair to the water heater pipe, which had necessitated reinstatement of the false ceiling, did not fall within clause 4(d) of the First Tenancy Agreement as being within the interior of the Premises and was more likely than not, due to fair wear and tear. As the water heater pipe had to be replaced, I am also of the view that this did not constitute minor repairs and routine maintenance falling within clause 4(n) of the First Tenancy Agreement. Instead, this fell within the purview of the landlord as set out in clause 6(c) of the First Tenancy Agreement. This was also the initial position taken by EGD, given that Cynthia agreed on the stand that it was a concealed water heater and that EGD paid for the invoice without asking the Defendants for payment . In the circumstances, I find that EGD had breached clause 6(c) of the First Tenancy Agreement in failing to keep the water heater pipe in good and tenantable repair and condition.
Invoices by Quartz Water dated 25 April 2024
- [44]
[44] The invoices by Quartz Water dated 25 April 2024 relate to the replacement of the filter pump, lights and light driver of the swimming pool. Quartz Water is EGD’s swimming pool contractor as well as the maintenance contractor for the swimming pool and both Amrul and Andrew are from Quartz Water .
- [45]
[45] On 20 April 2024, Yura messaged in the WhatsApp chat group with Dominic that the swimming pool guy mentioned that the pump is not working and that there were already symptoms of it malfunctioning prior to it not working as the swimming pool water was yellow despite the swimming pool guy cleaning it . She stated that she had highlighted that something was wrong with the swimming pool in December as the swimming pool water was yellow despite regular cleaning. She has assumed that it was due to the master bedroom toilet leaking that resulted in the pool water being yellow . On 22 April 2024, Dominic replied that the pool maintenance contractor will go and clean the pool and one John who is their contractor will also go and check on how to rectify, repair or change the flooring that week as well as check on the pump to see if it should be replaced and if affirmative, to give them a quote. Yura replied to ask Dominic to resolve the problem as soon as possible as she was going to travel out of Singapore . Yura said that it was mentioned to her that it was unclear if the pump was switched off when EGD’s contractor went to repair the master bedroom toilet. They inspected the swimming pool when they went to repair the water heater. She postulated that the contractor repairing the water heater may have switched off the pump during inspection but did not switch it back on because since November and December 2023, the swimming pool water has always been yellow or green . After the swimming pool maintenance contractor left on 20 April 2024, substances started to float on the water after the contractor added something into the pool. The contractor also told Yura that he could not do a good job to clean the pool as he did not know the root cause . Dominic replied on 22 April 2024 that he had told the contractor to check with his boss on the pump .
- [46]
[46] On 23 April 2024, Yura messaged Dominic that the pool contractor went to the Premises and informed her that the pumps were damaged due to wear and tear and that it could be repaired for around $700. He also mentioned to her that the algae bloom was due to the pump malfunctioning. Kacy from PropNex also messaged in the chat that the pool contractor had similarly explained this to her over the phone. Yura added that the cause was standard wear and tear and that the pumps required minor repair work . Dominic subsequently replied on the same day that they would replace the pool pump for Yura and settle the invoice . Based on the messages in the chat group, the issues relating to the swimming pool pumps were subsequently dealt with by Quartz Water on 27 April 2024 .
- [48]
[48] In this suit, EGD argued that the pool pump had to be replaced due to the Defendants’ failure to allow Amrul to enter the Premises to clean and service the swimming pool . There were 10 such occasions on 20 December 2023, 17 and 31 January 2024, 7 and 28 February 2024, 6, 13, 20 and 27 March 2024 and 3 April 2024. This was supported by the messages by Amrul to Dominic that no one was there to give access on 20 December 2023, 31 January 2024, 7 February 2024, 14 February 2024, 6 March 2024, and 13 March 2024. There were also video clips of no one answering the door on 28 February, 20 March, 27 March and 3 April .
- [49]
[49] Clause 4(h) of the First Tenancy Agreement provides
- [50]
[50] It would appear that there was a misunderstanding between the parties as to how the swimming pool maintenance should be arranged. The WhatsApp messages between Dominic and Amrul indicated that Dominic had forwarded Amrul the contact details of both Yura and her partner so that Amrul could contact Yura to arrange for the services . However, this appeared not to have been done, given that there were no messages between Amrul and Yura until 17 April 2024 despite the fact that Amrul became a contact of Yura on 20 December 2023 . Yura also complained on 20 April 2024 in the WhatsApp chat group that they had not previously allowed her to arrange for swimming pool maintenance on Saturdays to which Dominic replied that it was a misunderstanding as they had never said that the pool maintenance contractor could only come on weekdays. She was free to rearrange another date with the swimming pool maintenance contractor since she had his contact. Yura stated that it was never made known to her that she could change the weekday maintenance slot to a weekend slot. She claimed that it was not until 17 April 2024 when the pool contractor did not turn up that Dominic asked her to arrange for a date with the pool contractor herself and she realised that a Saturday slot was available.
- [51]
[51] Under the First Tenancy Agreement, it is the responsibility of the landlord to maintain the swimming pool. The onus is therefore on EGD to make prior appointments with Yura for access to the Premises for such maintenance. If EGD chooses to delegate this to Quartz Water, which then fails to make such prior appointment, I do not think this would be fault attributed to the Defendants. It would also appear from the WhatsApp messages between Dominic and Amrul and Dominic and Yura that EGD did not raise the issue of lack of access to the Premises for pool maintenance to either Amrul or Yura and did not insist on the weekly maintenance of the swimming pool. In the circumstances, I did not think Cocomo had breached clause 4(h) of the First Tenancy Agreement.
- [52]
[52] Based on the evidence above, it would appear that the swimming pool had been maintained at least twice in January 2024 and February 2024. Yura admitted that it was only in the month of March and April 2024 that the pool contractor was not able to enter as she was out of Singapore. However, there is no evidence that the lack of maintenance from 28 February to 20 April 2024 had caused the filter pump to fail requiring replacement. There is also no evidence that the lack of maintenance had caused the lights and light driver of the swimming pool to fail requiring replacement. In the circumstances, the Defendants are not liable for the Quartz Water invoices.
Post-recovery rectification costs
- [54]
[54] SH/030R1-24 states the following:
- [55]
[55] SH/030R1/VO2-24 states the following:
- [56]
[56] The experts were unable to carry out joint inspection, despite a request by the Defendants on 17 December 2024, as the Premises had been sold. As the experts agreed that most of the damage was due to water seepage, I turn to the water seepage incidents in the Premises on 14 May 2024 and 16 May 2024. It will also be necessary to look at whether the new wiring and cabling works relate to any breaches of the First Tenancy Agreement or the Second Tenancy Agreement and the cause of the electrical issues at the Premises.
Water Seepage on 14 and 16 May 2024
- [57]
[57] On 30 April 2024, Yura messaged in the chat group that the swimming pool man went to the Premises and informed her that while the pump was working, it was flooding and that his boss, one Mr Yeo, would go and check .
- [58]
[58] Based on the WhatsApp messages in the chat group between Dominic, Andrew, one Neo Que Yau and Cynthia, both directors of EGD, Andrew had informed Dominic on 27 April 2024 that while the pump has been installed, the floor trap is stuck and water does not flow out quickly. When they do backwash and if there is heavy rain, it will flood the pump room and cause damage to the pump. Andrew told Dominic to engage a plumber to clear the floor trap as they have tried to do so but did not have the necessary tools to clear the choke . Dominic then forwarded Fang’s details to Andrew and asked Andrew to call Fang and brief Fang on the details and Andrew agreed . Based on Yura’s message , Quartz Water serviced the swimming pool on 8 May 2024. Andrew proceeded to ask Dominic on 8 May 2024 why his plumber has yet to settle the choke and stated that they had already contacted Dominic’s contractor and briefed him, as per Dominic’s instructions .
- [59]
[59] Based on the messages between Dominic and Fang , Dominic gave instructions to Fang on 8 May 2024 to text and make an appointment with the tenant directly to go and see how to resolve the pump room flooding issue. Dominic was therefore clearly aware that the floor trap was choked and that the pump room was flooding on 27 April 2024 and that the problem had yet to be resolved on 8 May 2024. However, nothing appeared to be done.
- [60]
[60] Then on 14 May 2024 at 7:01 p.m. , Yura informed the chatgroup that water was leaking all over the place . Dominic responded on 14 May 2024 at 8:33 p.m. that he would ask a contractor to check and subsequently forwarded Yura the contact of a plumber from Guan Teck – Terry who did the heater and pipe installation and repair. Dominic informed Yura that he has asked the plumber to go at 11 p.m. to turn off the water since the water has leaked to the fourth floor.
- [61]
[61] On 15 May 2024 at 1:37 p.m., Yura informed that the water is green again and that the pool man said the pump is flooding which caused the pump not to run. Dominic responded at 1:39 p.m. that the pool maintenance guy should clean it and the maintenance guy would get his boss to go and take a look at how to resolve the flooding. However, Yura told Dominic that the pool man said that he was unable to contact his boss. Dominic then told Yura that he would ask Terry to arrange for his plumber to go and fix the pool flooding and choked pipe and that John would go with him to see how to fix the wall crack and leaking.
- [62]
[62] On 16 May 2024 at 11:00 a.m. , Dominic informed Yura that the plumber was unable to resolve the pool choke and asked for a site survey on Friday (17 May 2024) between 10 to 11 a.m. for another team to view and give a quote. Dominic then forwarded Fang’s contact to Yura. However, on 16 May 2024 at 4:20 p.m. Yura informed Dominic that her whole floor was flooded again and that everywhere was leaking. Kacy also messaged in the chatgroup at 4:33 p.m. asking Dominic to give the matter urgent attention. Dominic replied at 4:40 p.m. to state that his contractor would ask John and bring a worker to pack the crack first to see if he could stop the leaking. Dominic also replied at 4:42 p.m. that someone would go the next day to see how to fix the pool choke and he would ask his boss to confirm the work after they send him a quote. Kacy then replied at 4:42 p.m. and 4:43 p.m. that at this rate all the items would be damaged by the water leakage and that the apartment was not in a condition for staying. Lionel, Yura’s partner, then messaged at 5:11 p.m. that the flooding in the house was uncontrollable and that all the electrical appliances would be damaged. Lionel also stated that they need manpower to help clean up and that it was flooding faster than they could wipe. Dominic replied at 5:20 p.m. that John would be going with his worker to help to do the cleaning and patch the wall crack. Other than the plumber and his contractor who would go and check the pump room and ceiling the next day, he has also asked the MCST to go and check the areas related to the roof and waterproofing. At 5:23 p.m., Lionel replied that the leakage was too rampant and asked for permission to call in a professional company called Big Red to do clean up as the water was causing more damage with every minute.
- [63]
[63] According to Yura , as she was concerned that the seepage was from the swimming pool piping system, she requested a representative from Skypeak Maintenance Services Pte Ltd (“Skypeak”), a swimming pool specialist, to inspect the swimming pool pump room. Mr Marco Yang from Skypeak informed her that the reason why the swimming pool pump was flooded was because there was debris left by the pump contractor which had caused a choke. Separately, John also informed her that one of the pump tubes had been disconnected, which prevented the water from being discharged, which in turn caused the water to leak into the walls of the living room, the master bedroom toilet, the junior room and the store room. She proceeded to convey the contents of these conversations to Dominic on 16 May 2024 at 9:50 p.m. and informed Dominic that the partition in the master room toilet, living room walls, junior room and store room were damaged. Yura also informed Dominic that Marco stated that due to the flooding of the pump, the pump was damaged and needed to be replaced. Dominic acknowledged this on 17 May 2024 at 11:30 a.m. and stated that he has passed along the information to Mr Neo and the pool maintenance boss. He would also get the plumber, who went the previous day to clear the pool pipe choke, to see the false ceiling and leakage.
- [64]
[64] Based on the WhatsApp messages in the chatgroup among Dominic, Andrew, Mr Neo and Cynthia, Dominic did get the plumber to do the works as well as pass along the information to Quartz Water. The messages between Dominic and Fang as well as those between Dominic and Andrew were also instructive as to the cause of the water seepage.
- [65]
[65] On 15 May 2024 at 2:35 p.m., Dominic asked Fang to quote for the choked pool pipe in case they needed his help. On 15 May 2024 at 6:28 p.m., Dominic informed Fang that water was leaking all over the place. Fang replied that he could not repair the ceiling leak which is under building defect and Dominic replied that his new contractor would do so and he is asking only for the choked pipe in the swimming pool. Dominic highlighted on 16 May 2024 at 4:52 p.m. that the whole floor was flooded again and everywhere was leaking and that water was going down from the pump room to the unit. Dominic also stated at 6:13 p.m. on 16 May 2024 that the water from the swimming pool needed to be pumped out and the pipe would need to be repaired as the leak was from the pipe in the swimming pool. It was at 7:11 p.m. that Fang agreed to do the urgent work and settle the bill with Dominic.
- [66]
[66] On 16 May 2024 at 7:40 p.m., Dominic told Andrew that Andrew’s people went to install the new pump but did not connect the water discharge pipe well and caused all the water to be trapped inside the pump room such that the pump was not working well. After two days of heavy rain, the water overflowed and leaked to the unit on the fifth floor and went further down to the fourth floor. Hence, Andrew has to go and fix all these, connect the pipes, reinstall the new pump and they would be charging them the professional cleaning and maintenance works . At 7:43 p.m., Andrew responded that the flooding was due to the choked floor trap and the fact that Dominic did not engage a plumber to clear the floor trap. The pump was not working due to the flooding in the pump room. At 7:58 p.m., Dominic responded that the tenant said that the choke was due to the pump installation and inadequate and improper cleaning after installation such that rubbish was stuck inside. However, the tenants had asked their people to clean and clear the flooding as well as remove the choke but they would need to install a new pump and everything had to be borne by the previous installer. Andrew responded at 8:17 p.m. that the floor trap was already choked when they installed the pipe and that they had informed Dominic immediately but Dominic did not promptly engage a plumber to clear the choke. When Andrew’s guy went to service the pool that week, it was flooded so they called Dominic but Dominic did not manage to get a plumber. If Dominic had acted earlier, this would not have happened. In any event, Andrew asked Dominic if the choke has been cleared because the plumber contact Dominic gave Andrew (i.e. Fang) told Andrew that he could not do the job. On 17 May 2024, Andrew reiterated that the flood would have been avoided if Dominic had acted earlier . Andrew stated that while they tried to clear all the clog above the floor trap, they knew that if the choke inside the floor trap was not cleared, flood will occur. The loose piping alone will not cause the pump room to flood but heavy rainwater will. That was why they warned Dominic that if that happens, the pump will be affected. There was heavy rain the past few weeks which was why the flooding occurred. They had reminded him on 8 May 2024 to get the choke cleared. For this reason, they would not be bearing responsibility for the damages mentioned as they have given Dominic ample notice and warnings.
- [67]
[67] It was clear from the messages between Dominic and Andrew that Quartz Water did not dispute that the water discharge pipe was loose, just that it was not the sole contributing factor. On the stand, Cynthia did not dispute that they had blamed Quartz Water for choking the floor trap with construction debris .
- [68]
[68] Mr Toh was of the view that water had risen to the point of the overflow pipe and there were issues with the overflow pipe such that water went into the Premises. Mr Chin acknowledged that that was one possibility . Mr Chin agreed that in the conversation between Dominic and Fang, Fang highlighted that the floor trap is choked and when water is poured into the overflow pipe, the unit would leak . Based on a photograph of the floor trap and the debris that was inside the floor trap , Mr Chin accepted that the clog was caused by the debris . While Mr Chin was of the view that a heavy build-up of debris and impurities will choke up the filtration system as well as the overflow pipes and cause flooding in the event of heavy rainfall , Mr Toh was of the view that it cannot be determined why the overflow outlet pipe was blocked by what appeared to be cement mortar and the drainage outlet pipe was obstructed inside the pipe outlet by a half-moon plastic “cap”. These were foreign objects introduced into the pipework intentionally or negligently. It cannot be ascertained whether there was an accumulation of silt, dirt or detritus although construction debris and a towel were visible beside the floor drainage outlet. Despite heavy rainfall events after 19 December 2023, no water seepage or flooding occurred on the Premises. Issues emerged only during heavy rain on 14 and 16 May 2024, coinciding with a licensed plumber’s discovery of blocked drainage and overflow pipes. Hence, the blockages were due to the placement of foreign objects rather than a lack of regular maintenance.
- [69]
[69] Having considered the evidence of both experts, I preferred the evidence of Mr Toh, as it was supported by the other evidence. While EGD claimed that the water seepage flowed from the lack of maintenance of the swimming pool, I did not accept such an argument given that no evidence was tendered as to what Quartz Water would do when servicing the pool every week and how the failure to do so on the ten occasions claimed had led to choking of the floor trap or issues with the overflow pipe. In the days leading up to the water seepage incidents of 14 and 16 May 2024, the swimming pool was maintained regularly and there is no evidence that such maintenance would involve maintenance of the floor trap or overflow pipe. Given that Quartz Water did not have the necessary tools to clear the choking of the floor trap, it was unclear that the lack of weekly maintenance by them was the reason for the accumulation of silt, dirt or detritus . On the evidence before the Court, the floor drainage outlet pipe was choked due to construction debris or foreign objects and did not relate to the lack of maintenance of the pool for the occasions alleged. The water seepage on 14 and 16 May 2024 was therefore caused by a combination of the choking of the pipes due to construction debris or foreign objects, EGD’s failure to take prompt action in clearing the choke after the issue was highlighted to them and issues with the overflow pipe.
- [70]
[70] Given that Quartz Water did not have the necessary tools to clear the choking of the floor trap, clearance of the choked pipes could not be described as a minor repair and routine maintenance falling within clause 4(n) of the First Tenancy Agreement. The maintenance of the swimming pool and pipes was EGD’s responsibility and Dominic had been alerted of the pump flooding problem as early as 27 April but chose not to take prompt action despite receiving warning about the consequences from Andrew. There was no indication that Yura had refused access to EGD between 27 April and 8 May 2024 so as to constitute a breach of clause 4(h) of the First Tenancy Agreement. It was also clear that there were issues with Quartz Water’s replacement of the pool pump, given that Andrew did not dispute the fact that they were responsible for the loose connection of the water discharge pipe . As pool maintenance fell within the purview of the landlord pursuant to the First Tenancy Agreement, I find that EGD has breached clause 6(c) of the First Tenancy Agreement by failing to keep the pipes of the Premises in good and tenantable repair and condition. As this was a contractual breach on the part of EGD, whether EGD had contracted compliance of the clause to Quartz Water fell outside the scope of this suit. As between EGD and Cocomo, the claims between them were grounded in contract. It is not Cocomo’s case that EGD was vicariously liable for the negligence of Quartz Water.
Electrical issues
- [71]
[71] Electrical issues in the Premises were first highlighted in July 2023. Based on Lionel’s message to Caroline, EGD’s representative, on 1 July 2023, the complaint appears to be the fact that the 8 chandelier lights do not turn off at all with the dinner lights. On 25 July 2023, Caroline responded that she has the electrician but Yura did not give her a date on which she would be free . Yura highlighted on 29 April 2024 that the light can never be switched off and that it has been going on for a year . The fact that Mr Toh observed that the occupant was unable to switch off the chandelier lights when he inspected the Premises in October 2024 suggested that this issue was not fixed. Mr Toh also observed that the master bedroom lights could only be switched on and off using the master control switch which is at the main door.
- [72]
[72] On 21 June 2024 at 2:40 p.m. , Lionel messaged that P13, which is the light at the swimming pool, was causing the whole house to trip and that it would trip whenever it rained. On 22 June 2024 at 10:13 p.m. , Yura messaged that the whole level 2 has no electricity and that she was unable to use her computer or printers. On 23 June 2024 at 5:17 a.m. she threatened not to pay rent for the month of June as she was unable to work upstairs as electricity was tripping all the time. Dominic replied at 9:08 a.m. to inform her that his electrician would be going in half an hour’s time. On 23 June 2024 at 3:11 p.m., Yura informed Dominic that the electrician came and solved part of the problem and would update him on the unsolved issue. On 26 June 2024, Yura asked Dominic when he would resolve the other issues. When Dominic asked her to explain the situation, Yura updated Dominic on 28 June 2024 that the electricity in the second room was not functioning.
- [73]
[73] On 16 July 2024 at 8:31 p.m. , Yura updated that the light was not able to be switched on for two weeks but there was no update from anyone. Dominic responded on 19 July 2024 to inform Yura that he had Covid from the week before and that he had asked their contractor John to liaise directly with Yura early that week.
- [74]
[74] On 5 August 2024 at 6:07 p.m. , Yura highlighted that the lights for the room were not able to be used for 1 month 2 weeks, the lights for the living room were not fixed for a year and the light for the master room was not able to be switched on for 4 months.
- [75]
[75] Hong Sou Mou, a site supervisor Dominic asked to fix the electrical issues at the Premises, inspected the Premises on 10 August 2024 and rectified the electrical issue in the study room on the second floor of the Unit on 10 August 2024. However, he was not able to rectify the electrical issues on the first floor because he was concerned that any replacement would be damaged soon after due to the water seepage and told Yura that the water seepage would have to be rectified first .
- [76]
[76] Mr Toh was of the view that the water seepage event in June 2024 arose from the lack of water-tightness of the metal sheet roofing which had affected the electrical light fitting in the side resting area of the upper penthouse. Mr Toh was of the view that the water tightness of the metal sheet roofing above the side resting area and the aluminium trellis had failed leading to water ingress at the family room (at the aluminium trellis) and the side resting area (at the false ceiling). The water seepage was in all likelihood due to failure in the sealant works at the flashings and jointing and backflow of rainwater between the metal sheet roofing and the glass canopy above the aluminium trellis. The water seepage caused streaking and staining of efflorescence on the wall and floor tiles within the side resting area with extensive stain marks on the false ceiling indicative of the severity of the water ingress. Hence, the occupant lost the use of the side resting area from 21 June to 10 October 2024 as there were no lights in the room and no windows at the external walls of the side resting area. Mr Chin suggested that the cause could be the leakage of pipes above the ceiling but this was not supported by Mr Toh’s inspection of the area which did not disclose any water-conveying pipework.
- [77]
[77] In the circumstances, the cause of the water seepage issue in June 2024 was the lack of water-tightness of the metal sheet roofing. Under the Second Tenancy Agreement, it was the landlord’s responsibility to keep the roof in good and tenantable repair and condition. Correspondingly, the electrical issues in the Premises, which may have required new wiring or cabling works, were not caused by Cocomo’s breach of the First Tenancy Agreement or the Second Tenancy Agreement or by Yura’s breach of any alleged duty of care. Rather, they were caused by EGD’s breach of clause 6(c) of the Second Tenancy Agreement.
List of defects and damages in the Premises
- [78]
[78] EGD did not relate the invoices to the list of defects and damages documented by Mr Chin which is as follows:
1(1) 1st storey living room - ceiling box-up near downlight appeared to have cracks
- [80]
[80] The experts agreed that cracks and peeling paintwork was observed. They agreed that there had been water seepage and that there could be signs of water seepage at the external wall sloping roof beside the window. It was also agreed that water leakage from the fixed windows were from common areas and that there were no operable window at the vicinity above the ceiling box-up.
- [81]
[81] Given the experts’ agreement that there had been water seepage, I am of the view that the defect could not be due to the improper installation and poor handling of the box up during changing of the downlight. In this regard, I accepted Mr Toh’s evidence that the defect was more likely than not to be caused by water seepage from the external wall or window, given that this is consistent with water stain marks on the window frame and with the paint blistering and efflorescence staining at the external wall where the sloping roof terminates at the window frame .
- [82]
[82] In the circumstances, EGD had failed to prove that the damage was caused by Cocomo or Yura.
1(2) 1st storey living room - damage to the lower wall
1(3) – 1st storey living room - water stain marks observed at the lower part of the window curtain
- [84]
[84] The experts agreed that there was staining to the low section of the curtain.
- [85]
[85] In my view, these were caused by the water seepages on 14 and 16 May 2024 which were not caused by Cocomo or Yura. In the circumstances, Cocomo and Yura were not responsible for the same.
1(4) 1st storey living room - lumps of cotton fibre behind the curtains of the living room along with accumulation of dust
2(1) – 1st storey kitchen and yard area - dents on the upper door surface of the refrigerator
- [87]
[87] The experts agreed that there were dents on the refrigerator door and that they were mechanically induced or by impact.
- [88]
[88] In the circumstances, Cocomo and Yura should be liable for the same. As the experts agree that the diminished amount of this item is $200, I award the same accordingly.
2(2) – 1st storey kitchen and yard area - damage at the bottom part of the side panel of the kitchen island
- [89]
[89] The experts agreed that there was slight lifting at the corners of the side panel laminate at the kitchen counter and that water was the cause for such defect.
- [90]
[90] As the Premises had suffered multiple incidents of water ingress and flooding that were not caused by Cocomo or Yura, EGD has failed to prove that this defect was caused by Cocomo or Yura.
2(3) 1st storey kitchen and yard area - sliding door to yard was not working and sliding smoothly
- [91]
[91] The experts agreed the sliding doors to the yard cannot be opened or closed with ease. However, Mr Chin did not explain the reasons for his conclusion that this was due to the lack of cleaning and maintenance or improper usage. In contrast, Mr Toh explained that given that the TOP of the condominium was approximately 13 years before the time of inspection and the scrapes observed at the bottom track of the door, the sliding door wheels had in all likelihood reached the end of their service life and needed replacement. In view of the severity of the loss of cross section to the aluminium track due to the scraping action, Mr Toh observed that the damage would have been gradual and sustained.
- [92]
[92] I accepted Mr Toh’s reasoned explanation and find that this was more likely than not to be due to fair wear and tear. In the circumstances, Cocomo and Yura would not be liable for the same.
2(4) 1st storey kitchen and yard area - deteriorated ceiling box-up at yard area with water stain marks
- [93]
[93] As the experts agreed that the box-up had worn out externally, and that the maintenance and repair of the same was an MCST obligation, there is no need to deal with this defect.
3(1) 1st storey passageway - lower wall appeared to have peeling paintwork and surface de-bonding
- [94]
[94] The experts agreed that the cause of the observed peeling paintwork and surface de-bonding were caused by water ingress and flooding.
- [95]
[95] As I had earlier found that Cocomo and Yura did not cause the water ingress and flooding, they were not responsible for this defect.
3(2) 1st storey passageway - lower part of timber doorframe showed deterioration
- [96]
[96] The experts agreed that the cause of the observed timber door frame deterioration was water ingress and flooding. The scratches observed by Mr Chin were not captured in the photographs he took or those taken by Mr Toh .
- [97]
[97] In the circumstances, I did not find that there were scratches to the door frame. I accepted the experts’ evidence that the cause of the observed timber door frame deterioration was water ingress and flooding. As I had earlier found that Cocomo and Yura did not cause the water ingress and flooding, they were not responsible for this defect.
4(1) 1st storey master bedroom - water stain marks observed in the false ceiling above the entrance
- [98]
[98] The experts agreed that the cause of the observed false ceiling water stain marks was water seepage originating from the swimming pool and that the cause would be due to the blockages of overflow/drainage outlets.
- [99]
[99] As I held earlier, the water seepage originating from the swimming pool was due to the issues with the drainage outlet and overflow pipe and was unrelated to the lack of weekly maintenance of the swimming pool. As Cocomo and Yura did not cause the water ingress and flooding, they were not responsible for this defect.
4(2) 1st storey master bedroom - cracks observed at the downlight area and edges between the false ceiling and wall
- [100]
[100] The experts agreed that the cracks could be due to water seepage. In this regard, I accepted Mr Toh’s evidence that the movement of the ceiling panels during the downlight replacement would not normally cause the paint to lift or tent along the cracks and that the cause was more likely attributable to water seepage.
- [101]
[101] As I had earlier found that Cocomo and Yura did not cause the water ingress and flooding, they were not responsible for this defect.
4(3) 1st storey master bedroom - water stain marks on the top and back panel of the wardrobe located directly below the air-condition unit
- [102]
[102] Mr Chin’s view was that the defect was due to chokage in the air-condition drainage pipe causing backflow or overflow from the lack of cleaning or maintenance or condensation issue. This was an unsupported view given it was not validated by any other site observations.
- [103]
[103] Mr Toh’s view was that the water stains inside the wardrobe were accompanied by lifting paintwork and where the paint had peeled away, the exposed gypsum matrix of the joint scrim had visibly disintegrated which was consistent with water seepage or saturation as opposed to a condensation or surface vapour deposition.
- [104]
[104] I accepted Mr Toh’s reasoned conclusion and find it more likely than not that the cause of the water stain marks on the top and back panel of the wardrobe was water ingress from the swimming pool (filtration pump room). As this was not caused by Cocomo and Yura, they would not be liable for this defect.
4(4) 1st storey master bedroom - deteriorated timber door frame with water stain marks
- [105]
[105] The experts agreed that the cause of the water stain marks and deterioration of the timber door frame was the door frame coming into contact with water as a result of water seepage.
- [106]
[106] As I had earlier found that Cocomo and Yura did not cause the water seepage, they were not responsible for this defect.
4(5) 1st storey master bedroom - floor panel observed to be uneven, debonding and deteriorated especially near to the sliding glass door area with blister and peeling paintwork on the wall
- [107]
[107] The experts agreed that the floor panels were damp. I did not accept that this was due to the occupants of the Premises leaving the sliding door or window open during rainy days or overflows from the bathroom. Rather, given that the floor panels were damp, the cause was more likely than not due to the water seepage issues at the Premises. Given that Yura had already highlighted issues with the flooring on 21 December 2023 and updated on 16 July 2024 that the flooring was still not done, this likely arose from the water seepage issues at the Premises on 17 November 2023 which was not resolved until after 19 December 2023 as well as the water seepage incidents on 14 and 16 May 2024. As these issues were not caused by Cocomo or Yura, they should not be responsible for the same.
5(1) 1st storey master bathroom - water stain marks at the false ceiling
- [108]
[108] Mr Chin was of the view that the water stain mark was due to the pipe leakage from the water heater and/or water seepage from the overflow of water from the swimming pool. Mr Toh on the other hand was of the view that the cause of the damage was water ingress from the filtration pump room at the swimming pool. The damage was unlikely to be due to the water heater pipe, given the lack of proximity and the absence of water stain marks below the water tank.
- [109]
[109] I accepted Mr Toh’s reasoned conclusion, especially since the water heater pipe was replaced on 29 December 2023 without further complaint and the works on that day included reinstatement of the false ceiling of the master toilet and making good the same with paint. The stains were therefore fresh and could not be due to the water heater pipe. As Cocomo and Yura were not responsible for the water ingress from the swimming pool, they were not liable for making good this defect.
5(2) – 1st storey master bathroom – cracks on timber door frame and joints
- [110]
[110] I did not accept Mr Chin’s evidence that the cracks were due to rough handling, as there is no evidence of such rough handling and it is unclear how rough handling could have led to the cracks. As the door frame is immediately next to the water stain marks on the false ceiling, I accepted Mr Toh’s evidence that the cause was water ingress from the swimming pool (filtration pump room) for which the Defendants were not responsible.
5(3) – 1st storey master bathroom –part of the timber door frame deteriorated
- [111]
[111] The experts agreed that the cause of the observed timber door frame deterioration at the lower parts of the door frame and surface de-bonding was water ingress and flooding. Mr Chin’s evidence that there were scratches on the door frame which appear to be claw marks was not supported by the photographs.
- [112]
[112] As the defect is observed at the lower parts of the door frame, I accepted the experts’ evidence that this defect was caused by water ingress and flooding. As I had earlier held that the water ingress and flooding was not caused by Cocomo or Yura, they were not responsible for this defect.
6(1) – 1st storey junior bedroom and bathroom - floor panel observed to be debonded, uneven and deteriorated especially near to the sliding glass door area with blistering and peeling paintwork on the wall
- [113]
[113] The experts agreed that the floor panels were damp due to water seepage. While Mr Chin was of the view that the water seepage occurred because the sliding door or window was not closed properly during rainy days or the sealant was not effective, Mr Toh was of the view that such postulation was speculative and unfounded and there was no evidence supporting an ineffective sealant. The cause of the observed condition was water ingress from the swimming pool.
- [114]
[114] I accept that the cause of the defect was water ingress from the swimming pool which was not caused by Cocomo or Yura. Hence the Defendants were not liable for this defect.
6(2) – 1st storey junior bedroom and bathroom – timber door frame between bedroom and toilet as well as between passageway and toilet have water stain marks and deterioration at the bottom with some cracks at the top
- [115]
[115] The experts agreed that the cause of the observed timber door frame deterioration at the lower part of the door frame and surface de-bonding was water ingress and flooding. Mr Toh opined that the cracks at the top appeared to refer to the differential movement of the abutting joints in the door frame.
- [116]
[116] As I had earlier found that Cocomo and Yura did not cause the water ingress and flooding, they were not responsible for this defect.
6(3) – 1st storey junior bedroom and bathroom – basin cabinet base panel was corroded and started to deform with the edge of the laminate showing cracks and debonding
- [117]
[117] The experts agreed that the laminate had cracks and de-bonding and that the metal base panel was not visible. That being the case, there was no basis for Mr Chin to opine that the basin cabinet base panel was corroded. While Mr Chin was of the view that the cabinet had come into contact with water regularly and which is most likely caused by the lack of maintenance and cleaning, Mr Toh was of the view that the water sprays from the burst bidet hose had caused the damage to the basin cabinet.
- [118]
[118] I accept that the damage to the cabinet was likely to be caused by the burst bidet hose. As there was no evidence of improper installation or misuse, EGD has failed to prove that the bursting of the bidet hose was not due to fair wear or was unrelated to the water seepage incident on 17 November 2023 and was caused by the Defendants. In the circumstances, the Defendants were not liable for the same.
7(1) – 2nd storey family area – water stain marks on the beam wall
- [119]
[119] The experts agreed that there was rainwater ingress from the roofing above the aluminium trellis and that the metal sheet would fall under the purview of the MCST. As this is not due to the fault of Cocomo or Yura, they were not responsible for this defect.
7(2) – 2nd storey family area – blister paintwork and de-bonding surface observed on the wall above staircase and edge of window next to the swimming pool deck
- [120]
[120] The experts agreed that there were blistering paintworks and damp conditions on the wall of the staircase and the edge of the window next to the swimming pool deck. Mr Chin was of the view that there was water seepage from the window sealant areas or the wall and that it could be due to the overflow of the swimming pool water. Mr Toh was of the view that the overflow of swimming pool water was not probable as the pool was permitted to drain at the ledge area at the far side of the swimming pool. Instead, the defect was consistent with the lack of watertightness at the window frames and the pool deck waterproofing.
- [121]
[121] Regardless of whether it is due to the overflow of the swimming pool water or the lack of watertightness at the window frames and the pool deck waterproofing, the cause of the defect cannot be attributed to Cocomo or Yura and they should not be responsible for the same.
7(3) 2nd storey family area - lower part of the wall showed blister paintwork and deteriorated surface at the side of the full height glass window panel along with water stain marks on the floor nearby
- [122]
[122] The experts agree that the water seepage was from the external wall. Mr Toh disagreed that the water seepage was from the window sill as there is no window sill at the floor level where the stains had occurred. There was a diagonal crack of the external wall corresponding to the sloping roof profile adjoining the external wall. The external wall was damp and lacked water tightness.
- [123]
[123] As the defects were not caused by Cocomo or Yura, they are not responsible for the same.
8(1) – 2nd storey side resting area – water stain marks and cracks on the false ceiling
- [124]
[124] The experts agreed that there was rainwater ingress from the roofing above the false ceiling. While Mr Chin opined that the damage could be due to any leakage of pipes above the ceiling, Mr Toh disagreed as an inspection of the roof level above the side resting area did not disclose any water-conveying pipework. The water drains freely to the side of the roof. Hence, Mr Toh opined that the water seepage was in all likelihood due to a failure in the sealant works at the flashings and jointing and the backflow of rainwater between the metal sheet roofing and the glass canopy above the aluminium trellis.
- [125]
[125] I agree with Mr Toh’s reasoned evidence, given that Mr Chin’s evidence was unsupported. Even if the stains were due to any leakage of pipes, EGD has failed to show that the responsibility for such leakage and the corresponding defects were attributed to the Defendants, given that it was the landlord’s responsibility under clause 6(c) of the Second Tenancy Agreement to maintain the roof, ceiling, main structure, walls, floors, wiring and pipes.
8(2) – 2nd storey side resting area – water stain marks observed on the floor
- [126]
[126] The experts agreed that there were water stain marks on the floor and that cleaning can be done following the ceasing of the water ingress. Mr Toh opined that the watertightness of the metal sheet roofing above the side resting area had failed causing water ingress. The streaks and stains were soluble salts from the wall tile beddings or mortars that had calcified. The condition indicates significant water ingress and egress as there is water saturation of the tile bedding. The incident of water ingress was not caused by the occupant.
- [127]
[127] I accepted Mr Toh’s reasoned evidence.
9(1) – 2nd storey external and swimming pool area – timber decking was badly deteriorated with some timber showing decayed edges
- [128]
[128] The experts agreed that there were signs of timber decking deterioration at the time of handing over, although the extent of the timber rot condition at the time of the handover could not be ascertained.
- [129]
[129] Mr Chin was of the view that the cause was the overflow of the swimming pool water due to any chokage in the overflow discharge system and any chokage in the roof drainage pipes, which comes under the maintenance of the tenant or occupier. Mr Toh on the other hand was of the view that the overflow of swimming pool water was not a probable event due to the existence of overflow weirs observed at the far side of the swimming pool.
- [130]
[130] I had earlier found that the cause of the water ingress was due to issues with the floor drainage outlet and the overflow pipe in the swimming pool filtration pump room being choked and that this came under the purview of EGD pursuant to the First Tenancy Agreement. Hence, these defects were not attributed to the Defendants.
9(2) – 2nd storey external and swimming pool area – structure of the timber decking has deteriorated making it unstable and unsafe
- [131]
[131] The experts agreed that there were signs of timber deck deterioration at the time of handing over but the extent of the timber rot condition could not be ascertained. As the deck was ground-hugging, it was not possible to inspect the base support structure of the timber deck. There were also no photographs showing the alleged deteriorated base support structure. Where the timber base structure was exposed, it was in a better condition than the top planks .
- [132]
[132] As set out earlier, the cause of the water ingress was due to issues with the floor drainage outlet and the overflow pipe in the swimming pool filtration pump room being choked and that this was under the purview of EGD pursuant to the First Tenancy Agreement. Hence, the defects were not attributed to the Defendants.
9(3) – 2nd storey external and swimming pool area – roof drainage area was not well maintained with efflorescence observed on the side wall
- [133]
[133] The experts agreed that the efflorescence staining on the side wall and the drain cleaning falls within the scope of the MCST as it is part of the common property.
9(4) – 2nd storey external and swimming pool area – efflorescence observed on the boundary wall
- [134]
[134] As this is not within the scope of the dispute, there is no need to deal with this.
- [135]
[135] In summary, of the list of defects and damages, the Defendants were only liable for the damage to the lower wall in the first storey living room, the cleaning of the first storey living room, and the dents on the upper door surface of the refrigerator for which the total damages are assessed in the sum of $340.
The judgment continues past this page. Read the rest at eLitigation.