3. Amendment of Third Schedule
Feedback & supportIn the Active Mobility (Shared Paths) Order 2018, in the Third Schedule —
replace item 18 with — “18. Canberra Park Connector (approximately 0.55 kilometre in length) starting at Sembawang Road, running along Canberra Link and ending at Canberra Road.”; (b) replace item 90 with — “90. Woodlands (Avenue 7) Park Connector (approximately 1.30 kilometres in length) starting at Woodlands Avenue 10, running along Woodlands Avenue 7 and ending at Woodlands Avenue 6.”; and (c) after item 161, insert — “162. Potong Pasir‑Bidadari Park Connector (approximately 0.23 kilometre in length) starting at Wan Tho Avenue, running along Upper Serangoon Road and ending at Bidadari Park Drive. 163. Canberra Park Connector (approximately 0.70 kilometre in length) starting at Sembawang Drive, running along Sembawang Way and ending at Sungei Sembawang. 164. Woodlands (Avenue 7) Park Connector (approximately 1.20 kilometres in length) starting at Woodlands Drive 71, running along Woodlands Avenue 7 and ending at Woodlands Avenue 2.”. [G.N. Nos. S 348/2019; S 463/2019; S 630/2019; S 683/2019; S 51/2020; S 469/2020; S 180/2021; S 520/2021; S 685/2021; S 757/2021; S 109/2022; S 599/2022; S 709/2022; S 904/2022; S 66/2023; S 282/2023; S 554/2023; S 775/2023; S 153/2024; S 585/2024; S 663/2024; S 879/2024; S 166/2025; S 470/2025; S 497/2025; S 706/2025; S 117/2026; S 392/2026]