Skip to content

Singapore legislation

Regulation 7

of Building Control (Environmental Sustainability) Regulations 2008

Regulation 7

Submission of scores using Code

Amended byS 256/2010 wef 05/05/2010S 592/2025 wef 30/09/2025

In addition to the requirements of regulations 4, 5 and 6 of the Building Control Regulations 2003, the developer of any building works that is subject to a minimum ES score shall, when applying for approval of building plans under section 5 of the Act, submit to the Commissioner of Building Control —

(a)

a declaration from each appropriate practitioner who assessed the building works or any part thereof, stating the numerical score he assigned the building works or part thereof under regulation 5 and that the numerical score is correct;

(b)

a statement from the qualified person appointed under section 8(1)(a) or 11(1)(d)(i) of the Act to prepare the plans of those building works in accordance with the Act that the total (using the scoring methodology specified in the Code) of all numerical scores assigned by every appropriate practitioner who assessed the building works or part thereof is not less than the minimum ES score applicable to those building works;

(c)

the total (using the scoring methodology specified in the Code) of all numerical scores assigned by the appropriate practitioners referred to in paragraph (a); and

(d)

such other documents as the Commissioner of Building Control may require in any particular case.