Regulation 11

of Building Control (Temporary Buildings) Regulations 2018

Regulation 11

Grant of permit

Subregulation 1

Where the conditions specified in paragraph (2) are fulfilled, the Commissioner of Building Control must grant the owner of the temporary building final approval for a temporary building permit specifying the period during which the temporary building may be used and subject to such other conditions as the Commissioner of Building Control may specify in the permit.

Subregulation 2

The conditions mentioned in paragraph (1) are as follows:

(a)

the temporary building is erected in accordance with the conditions of the preliminary approval;

(b)

the owner of the temporary building submits the following to the Commissioner of Building Control:

(i)

the certificate mentioned in regulation 9(2)(i);

(ii)

where applicable, the certificate mentioned in regulation 10(2)(b).