The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Code of Practice on Coastal Protection: Development requirements for coastal landowners is Singapore COMMENTARY, cited as COMMENTARY 2026-07-10-code-of-practice-on-coastal-protection-development-requirements-for-coastal-landowners 2026 and first recorded in 2026.
1
© RAJAH & TANN SINGAPORE LLP
CONSTRUCTION & PROJECTS | CORPORATE REAL ESTATE
Code of Practice on Coastal Protection:
Development Requirements for Coastal
Landowners
Executive Summary
Singapore's National Water Agency, the Public Utilities Board ("PUB"), has released the Code of
Practice on Coastal Protection ("CPCOP") on 17 June 2026, establishing standards for the planning, design, operations, inspection, and maintenance of coastal protection measures. With the Coastal
Protection and Other Amendments Bill passed in March 2026, coastal landowners are now responsible for implementing and owning coastal protection measures within their land plots, in compliance with the CPCOP. The CPCOP guides landowners of prescribed places in fulfilling their coastal protection obligations under the Sewerage, Drainage and Coastal Protection Act 1999
("SDCPA"). The CPCOP will take effect from 2028.
This Update outlines the key features of the CPCOP.
Practical Implications
Landowners of coastal premises should familiarise themselves with the CPCOP requirements ahead of the 2028 commencement. Key action items include: (i) determining whether their premises fall within the definition of a prescribed place. The SDCPA sets out four categories of prescribed places:
Absolute Protection Boundary ("APB"); (b) Transiently Floodable Areas (Coastal) ("TFA(C)"); (c)
Sheltered Structures within TFA(C); and (d) Nearshore and Offshore Structures; (ii) consulting the
Coastal Protection Interpretation Plan ("CPIP"); (iii) engaging qualified professionals to assess coastal protection requirements; and (iv) ensuring that design, construction, inspection, and maintenance regimes are in place to meet statutory obligations.
While presented as a regulatory framework, the CPCOP has direct Corporate Real Estate implications for portfolios with coastal exposure (including logistics and waterfront assets), including on acquisition due diligence, leasing structures and risk allocation, and long-term capital expenditure and maintenance burdens that may materially affect asset value.
PUB has indicated that further engagement sessions will be held in the second half of 2026 to help stakeholders understand the requirements. For more details and advice, please reach out to our Team members.
2
Key Features of the CPCOP
The CPCOP is structured around five chapters. An overarching concept is the APB or Absolute
Protection Boundary, which demarcates regions that must be protected from coastal flooding. All coastal protection measures along the APB must achieve a continuous line of defence, meet stipulated Coastal Protection Levels and design standards, and ensure continuity and watertightness at interfaces with adjoining measures. The table below summarises the key requirements. This list is not exhaustive – for details, please refer to the CPCOP.
Feature
Summary of Key Requirements
Chapter I: Planning
Requirements
•
Pre-planning: The Qualified Person ("QP") / Developer / Owner /
Registered Surveyor shall obtain the prevailing CPIP before commencing planning and design.
•
Adaptability for future climate projections: Landowners shall implement an APB measure or Development-Specific Measure
("DSM") depending on the remaining lease term.
•
Coastal Protection Reserve ("CPR"): The Professional Engineer
("PE") shall determine the required CPR based on the remaining lease duration and submit it to the Board for approval at the
Construction Gateway stage.
•
Crest level of APB measure / DSM: The PE (Civil) shall compute the
Coastal Protection Level using prescribed coastal hydraulic boundary parameters and indicate the crest level on layout plans.
•
TFA(C) or Transiently Floodable Area (Coastal): Among other things, the Owner shall provide justification for any proposed landward shift of the Protection Boundary to the Board for approval and appoint a Flood Protection Manager.
•
Hydraulic connection: All process water pipes shall be designed to ensure that any backwater flow will not cause flooding in the premises they serve, subject to the appropriate Extreme Sea Level conditions.
Chapter II: Design
Requirements
•
Design criteria: The APB measure shall be designed for both
Ultimate Limit State and Serviceability Limit State conditions. The design life is typically 120 years.
•
Structural and geotechnical: The PE (Civil) shall design for settlement, lateral movement, global and local slope instability, liquefaction, hydraulic instability (including Backward Erosion Piping), and collision impact.
•
Hydraulic actions: The APB measure shall be designed for water level variations, wave actions, current actions, overtopping, landward side protection, and scour and toe protection.
•
Sloped structure as APB measure: The PE (Civil) shall design sloped structures with appropriate filter and armour layers.
•
Interface between adjoining APB measures: The PE (Civil) shall design the APB measure to be continuous with adjoining APB measures and ensure watertightness at joint connections.
3
Feature
Summary of Key Requirements
Chapter III: Inspection and Maintenance
Requirements
•
Inspection and monitoring: The Owner shall ensure various inspections of the APB measures to ensure structural integrity, safety, and functionality.
•
Maintenance: The APB measure shall be maintained to preserve functionality, structural integrity, and serviceability throughout its design life. The PE (Civil) shall establish a maintenance regime and prepare an Inspection and Maintenance Plan Report.
•
Inspection and maintenance of interface between adjoining APB measures: The Owner shall be responsible for inspection and maintenance of the APB measure within their land plot, including any joint connections found within the boundaries of their land plot.
•
Inspection and maintenance for TFA(C): The Flood Protection
Manager shall conduct annual inspections of all flood response assets and measures to verify their functionality.
•
Annual declaration: The Owner and Flood Protection Manager shall make an annual declaration to the Board confirming that all inspection and maintenance requirements have been met.
Chapter IV: Coastal
Deployable Barriers
("CDB") Requirements
•
Approval: The use of CDB is subject to the Board's approval at the
Design Gateway and fulfilment of prescribed conditions.
•
Planning and design: The crest of the CDB shall follow the required crest level for APB measures. The Owner / QP shall provide justification for the proposed width based on operational requirements.
•
Operations and monitoring: The Owner shall ensure that the CDB can be fully deployed by the time stipulated by the Board before the forecast coastal event and shall appoint a Flood Protection Manager to assist with various obligations.
•
Inspection and maintenance: The Owner and Flood Protection
Manager shall submit inspection and maintenance declarations to the
Board. The PE (Civil/Mechanical/Electrical) shall develop a maintenance regime.
Chapter V: Submission
Requirements
•
Submission requirements: The submission requirements for APB measures / DSMs are set out in Annex A of the CPCOP, specifying the documents to be submitted at the Design Gateway, the
Construction Gateway, and the Completion Gateway stages.
If you have any queries on the above, please reach out to our team set out on this page.
For regional Construction, Infrastructure & Projects and Corporate Real Estate matters, please see
Rajah & Tann Asia's Construction, Infrastructure & Projects Practice Group and Rajah & Tann Asia's
Real Estate Practice Group, respectively, for more information.
4
Contacts
CONSTRUCTION & PROJECTS
Sim Chee Siong
HEAD
D +65 6232 0227
chee.siong.sim@rajahtann.com
Matthew Koh
PARTNER
D +65 6232 0917
matthew.koh@rajahtann.com
REAL ESTATE
Elsa Chai
CO-HEAD
D +65 6232 0512
elsa.chai@rajahtann.com
Chou Ching
CO-HEAD
D +65 6232 0693
chou.ching@rajahtann.com
Benjamin ST Tay
DEPUTY HEAD
D +65 6232 0375
benjamin.st.tay@rajahtann.com
Norman Ho
SENIOR PARTNER
D +65 6232 0514
norman.ho@rajahtann.com
Please feel free to also contact Knowledge Management at RTApublications@rajahtann.com.
5
Regional Contacts
Cambodia
Rajah & Tann Sok & Heng Law Office
T +855 23 963 112 | +855 23 963 113
kh.rajahtannasia.com
Myanmar
Rajah & Tann Myanmar Company Limited
T +951 9253750
mm.rajahtannasia.com
China
Rajah & Tann Singapore LLP
Representative Offices
Shanghai Representative Office
T +86 21 6120 8818
F +86 21 6120 8820
Shenzhen Representative Office
T +86 755 8898 0230
cn.rajahtannasia.com
Philippines
Gatmaytan Yap Patacsil Gutierrez & Protacio
(C&G Law)
T +632 8248 5250
www.cagatlaw.com
Singapore
Rajah & Tann Singapore LLP
T +65 6535 3600
sg.rajahtannasia.com
Indonesia
Assegaf Hamzah & Partners
Jakarta Office
T +62 21 2555 7800
F +62 21 2555 7899
Surabaya Office
T +62 31 5116 4550
F +62 31 5116 4560
www.ahp.co.id
Thailand
Rajah & Tann (Thailand) Limited
T +66 2656 1991
th.rajahtannasia.com
Vietnam
Rajah & Tann LCT Lawyers
Ho Chi Minh City Office
T +84 28 3821 2673 | +84 28 3521 2832
Hanoi Office
T +84 24 3267 6127 | +84 24 3267 6128
vn.rajahtannasia.com
Lao PDR
Rajah & Tann (Laos) Co., Ltd.
T +856 21 454 239
la.rajahtannasia.com
Malaysia
Christopher & Lee Ong
T +603 2273 1919
F +603 2273 8310
www.christopherleeong.com
Rajah & Tann Asia is a network of legal practices based in Asia.
Member firms are independently constituted and regulated in accordance with relevant local legal requirements. Services provided by a member firm are governed by the terms of engagement between the member firm and the client.
This Update is solely intended to provide general information and does not provide any advice or create any relationship, whether legally binding or otherwise.
Rajah & Tann Asia and its member firms do not accept, and fully disclaim, responsibility for any loss or damage which may result from accessing or relying on this Update.
6
Our Regional Presence
Rajah & Tann Singapore LLP is one of the largest full-service law firms in Singapore, providing high quality advice to an impressive list of clients. We place strong emphasis on promptness, accessibility and reliability in dealing with clients. At the same time, the firm strives towards a practical yet creative approach in dealing with business and commercial problems. As the Singapore member firm of the Lex Mundi Network, we are able to offer access to excellent legal expertise in more than 100 countries.
Rajah & Tann Singapore LLP is part of Rajah & Tann Asia, a network of local law firms in Cambodia, China, Indonesia, Lao PDR, Malaysia, Myanmar, the Philippines,
Singapore, Thailand and Vietnam. Our Asian network also includes regional desks focused on Brunei, Japan and South Asia.
The contents of this Update are owned by Rajah & Tann Singapore LLP and subject to copyright protection under the laws of Singapore and, through international treaties, other countries. No part of this Update may be reproduced, licensed, sold, published, transmitted, modified, adapted, publicly displayed, broadcast (including storage in any medium by electronic means whether or not transiently for any purpose save as permitted herein) without the prior written permission of Rajah & Tann
Singapore LLP.
Please note also that whilst the information in this Update is correct to the best of our knowledge and belief at the time of writing, it is only intended to provide a general guide to the subject matter and should not be treated as a substitute for specific professional advice for any particular course of action as such information may not suit your specific business and operational requirements. It is to your advantage to seek legal advice for your specific situation. In this regard, you may contact the lawyer you normally deal with in Rajah & Tann Singapore LLP or email Knowledge Management at RTApublications@rajahtann.com.
If one provision's text doesn't match the official source, use Suggest a fix beside that provision — it opens an editor next to the source document. For anything else — a missing amendment, a broken link, out-of-date content, or a removal request — report it here.