Llaws.sg
SearchLawsJudgementsTopicsAssistantConnectSign in
Electric Vehicles Charging (Minimum Electrical Load and Charging Points) Order 2023/Regulation 2

Singapore legislation

Regulation 2

of Electric Vehicles Charging (Minimum Electrical Load and Charging Points) Order 2023

Regulation 2

Definitions

In this Order, “building works”, “development”, “electrical work”, “parking lot” and “parking place” have the meanings given by section 60 of the Act.

←PreviousRegulation 1 · Citation and commencementNextRegulation 3 · Minimum electrical load and charging points for development with building works→
Read in full context — Electric Vehicles Charging (Minimum Electrical Load and Charging Points) Order 2023 →

Parent legislation

Electric Vehicles Charging (Minimum Electrical Load and Charging Points) Order 2023

Subsidiary LegislationIn force

Provision 2 of 4

Read in full context — Electric Vehicles Charging (Minimum Electrical Load and Charging Points) Order 2023 →
←PreviousRegulation 1 · Citation and commencementNextRegulation 3 · Minimum electrical load and charging points for development with building works→
L

laws.sg is a free, public interface for Singapore legislation. Always verify against the official publisher before relying on the text.