The text
© WongPartnership LLP
DISCLAIMER: This update is intended for your general information only. It is not intended to be, nor should it be, regarded as or relied upon as legal advice. Court decisions referred to herein may be subject to further appeal at the time of publication, and subsequent developments in the law, including new legislation, amendments, court decisions or practice directions, may affect the accuracy or relevance of the matters discussed. We are under no duty to update this publication to reflect any such changes in the law. You should consult a qualified legal professional before taking any action or omitting to take action in relation to matters discussed herein.
WongPartnership LLP (UEN: T08LL0003B) is a limited liability law partnership registered in Singapore under the Limited Liability
Partnerships Act 2005.
EMA Consults on Scaling Energy Storage in
Singapore
On 26 October 2026, the Energy Market Authority (EMA) launched a consultation seeking views on how energy storage can be deployed and scaled in Singapore. The consultation closes on 29 January 2027.
The Energy Storage Systems Vision and Industry Consultation Paper (Consultation Paper) seeks industry feedback on practical energy storage technologies, business models and projects that can be commercially deployed at scale. It sets out Singapore’s vision for energy storage to be deployed where it creates value and contributes to multiple compatible needs where feasible. In its press release, EMA stated that Singapore aims to triple its energy storage capacity from about 350 MWh today to around 1
GWh by 2030.
EMA is also seeking industry interest in forming an industry-led Energy Storage Workgroup to address common barriers to energy storage systems (ESS) deployment.
Background
Need for flexibility
The Consultation Paper notes that new and large loads may require more capacity during peak periods than the electricity network can provide. In its press release, EMA noted that electricity demand is expected to grow rapidly, driven by new large demand loads such as semiconductors, data centres and electrification of the transport system. At the same time, the supply and use of renewable energy such as domestic solar, which may be intermittent and distributed, is likely to continue growing.
These developments will increase the value of flexibility of the power system, which the Consultation
Paper describes as the ability of the power system to respond quickly as supply and demand change.
Energy storage will be one part of the solution.
Existing BESS deployment
The Consultation Paper notes that Singapore has gained experience with both utility-scale and distributed battery energy storage systems (BESS). This includes the 326 MWh BESS on Jurong Island, deployed in 2022.
BESS can participate in demand response. EMA’s virtual power plant (VPP) pilots are exploring how distributed BESS and other resources can provide energy and ancillary services through aggregation and coordination.
Energy
© WongPartnership LLP
DISCLAIMER: This update is intended for your general information only. It is not intended to be, nor should it be, regarded as or relied upon as legal advice. Court decisions referred to herein may be subject to further appeal at the time of publication, and subsequent developments in the law, including new legislation, amendments, court decisions or practice directions, may affect the accuracy or relevance of the matters discussed. We are under no duty to update this publication to reflect any such changes in the law. You should consult a qualified legal professional before taking any action or omitting to take action in relation to matters discussed herein.
WongPartnership LLP (UEN: T08LL0003B) is a limited liability law partnership registered in Singapore under the Limited Liability
Partnerships Act 2005.
Vision for Energy Storage
EMA’s vision for energy storage in Singapore is for energy storage to be deployed where it creates value and contributes to multiple compatible needs where feasible. This involves:
(a)
Deploying ESS where it creates system and economic value: ESS should be deployed where it provides system and economic value, taking into account other available solutions such as flexible generation, demand response and network reinforcement.
(b)
Getting more value from every ESS resource: ESS should support multiple compatible applications where technically and operationally feasible. Before securing additional standalone capacity, it should be considered whether existing or committed resources can provide the required capability, taking into account their availability, technical capabilities and other system requirements.
(c)
Keeping the market open to better technologies and business models: Singapore will remain open to solutions that offer better performance, lower costs, smaller footprints, faster deployment or new capabilities, while maintaining appropriate safety, reliability and technical standards.
Potential Areas of Value
The Consultation Paper identifies three key areas where ESS can create value in Singapore, each with a key question aimed at increasing the value of ESS in that area:
(a)
Strengthen power system reliability: ESS can provide fast response during supply disruptions and changes in solar output, and potentially support regulation, reserves and other system services.
Key question: Where can ESS provide these capabilities most effectively, taking into account other available solutions?
(b)
Bridge temporary capacity shortfalls: Some new and expanding loads may require more capacity during peak periods than the network can provide. ESS can be charged during off-peak periods when there is spare capacity and later discharged during peak periods. This helps to bridge temporary network capacity shortfalls while network upgrades are underway. ESS can also support local network needs arising from solar and electric vehicle (EV) adoption.
Key question: Where can ESS bridge temporary network capacity shortfalls, or support local network needs?
(c)
Unlock distributed storage and VPPs: Residential and commercial ESS, EV batteries and other distributed storage resources can be aggregated to participate in markets and system services through vehicle-to-grid arrangements and VPPs.
Key question: What commercial, operational and settlement arrangements are needed to move from pilots to scale?
© WongPartnership LLP
DISCLAIMER: This update is intended for your general information only. It is not intended to be, nor should it be, regarded as or relied upon as legal advice. Court decisions referred to herein may be subject to further appeal at the time of publication, and subsequent developments in the law, including new legislation, amendments, court decisions or practice directions, may affect the accuracy or relevance of the matters discussed. We are under no duty to update this publication to reflect any such changes in the law. You should consult a qualified legal professional before taking any action or omitting to take action in relation to matters discussed herein.
WongPartnership LLP (UEN: T08LL0003B) is a limited liability law partnership registered in Singapore under the Limited Liability
Partnerships Act 2005.
Proposed Support Measures
The Consultation Paper identifies four areas to support ESS deployment at scale:
(a)
Improve access to information and data: EMA will publish regular ESS deployment statistics and explore improving access to electricity market information, which will help the industry assess investment opportunities and participate more effectively in electricity markets and system services.
(b)
Ensure market and regulatory frameworks remain responsive: EMA will review market, regulatory and infrastructure arrangements to identify and address unnecessary barriers relating to the deployment and scaling of viable ESS solutions. These include requirements related to market participation, registration, metering, settlement, aggregation and grid connection.
(c)
Enable new ways for ESS to provide value: EMA will use pilots and industry engagement to explore new deployment, operating and participation models. It will also assess whether existing market arrangements allow ESS and other flexible resources to realise their full value.
(d)
Enable ESS to be observable and controllable: EMA will develop graduated requirements for
ESS to be observable or controllable, depending on the size, role and system significance of each resource. These could range from basic registration to observability requirements for larger or market-active resources, and control or dispatch requirements where justified by system needs.
Consultation Questions
EMA welcomes views from industry and academia on how ESS can be deployed and scaled in
Singapore. The Consultation Paper poses the following questions.
What ESS solutions could work and scale in Singapore?
EMA invites industry to propose ESS-related solutions that:
•
Strengthen power system reliability;
•
Bridge temporary grid capacity shortfalls;
•
Unlock flexibility from distributed ESS, EV batteries and VPPs; or
•
Enable a single storage resource to provide multiple compatible services.
Where relevant, promising proposals featuring pre-commercial technologies may be considered under the Singapore Pilots for Energy & Enterprise Decarbonisation (SPEED) programme.
What changes would help these solutions scale?
EMA invites industry to identify barriers relating to:
•
Fire safety and land requirements;
© WongPartnership LLP
DISCLAIMER: This update is intended for your general information only. It is not intended to be, nor should it be, regarded as or relied upon as legal advice. Court decisions referred to herein may be subject to further appeal at the time of publication, and subsequent developments in the law, including new legislation, amendments, court decisions or practice directions, may affect the accuracy or relevance of the matters discussed. We are under no duty to update this publication to reflect any such changes in the law. You should consult a qualified legal professional before taking any action or omitting to take action in relation to matters discussed herein.
WongPartnership LLP (UEN: T08LL0003B) is a limited liability law partnership registered in Singapore under the Limited Liability
Partnerships Act 2005.
•
Licensing and approvals;
•
Grid connection and commissioning;
•
Metering and market registration;
•
Access to market information and data; and
•
Market products, rules and participation arrangements.
Where possible, respondents should explain how these barriers affect deployment and scaling of ESS solutions, and suggest practical changes that could enable commercially scalable projects in Singapore.
Next Steps
EMA will use submissions from this consultation, together with ongoing pilots and further system studies, to identify priority ESS applications. It will also assess changes to market and regulatory frameworks, and develop the next phase of Singapore’s ESS roadmap.
In addition, EMA will engage industry on how the ESS ecosystem can collaborate more effectively. This could include an ESS workgroup or another suitable platform to share deployment experience, identify common barriers, develop solutions and engage the Government.
Submission of Views
Industry stakeholders are invited to submit their views on the consultation questions by 29 January
2027. Submissions should be sent by email to EMA_Energy_Storage@ema.gov.sg. Expressions of interest in the proposed workgroup may be sent to the same address. EMA may subsequently invite selected stakeholders for further engagement.
If you would like information and/or assistance on the above or any other area of law, you may wish to contact the Partner at WongPartnership whom you normally work with or any of the following Partners:
TAY Peng Cheng
Head – Energy, Projects & Construction
Lesley TAN
Partner – Energy, Projects & Construction
WPG MEMBERS AND OFFICES
- contactus@wongpartnership.com
SINGAPORE
-
WongPartnership LLP
12 Marina Boulevard Level 28
Marina Bay Financial Centre Tower 3
Singapore 018982
t +65 6416 8000
f +65 6532 5711/5722
CHINA
-
WongPartnership LLP
Shanghai Representative Office
Unit 1015 Link Square 1 222 Hubin Road
Shanghai 200021, PRC t +86 21 6340 3131
f +86 21 6340 3315
INDONESIA
-
Makes & Partners Law Firm
Menara Batavia, 7th Floor
Jl. KH. Mas Mansyur Kav.
Jakarta 10220, Indonesia t +62 21 574 7181
f +62 21 574 7180
w makeslaw.com
MALAYSIA
-
Cheang & Ariff
Advocates & Solicitors
Loke Mansion 273A, Jalan Medan Tuanku 50300 Kuala Lumpur t +60 3 2691 0803
f +60 3 2693 4475
w cheangariff.com
-
Foong & Partners
Advocates & Solicitors 13-1, Menara 1MK, Kompleks 1 Mont' Kiara
No 1 Jalan Kiara, Mont' Kiara 50480 Kuala Lumpur, Malaysia t +60 3 6419 0822
f +60 3 6419 0823
w foongpartners.com
MIDDLE EAST
-
Al Aidarous Advocates and Legal Consultants
Abdullah Al Mulla Building, Mezzanine Suite 02 39 Hameem Street (side street of Al Murroor Street)
Al Nahyan Camp Area
P.O. Box No. 71284
Abu Dhabi, UAE t +971 2 6439 222
f +971 2 6349 229
w aidarous.com
-
Al Aidarous Advocates and Legal Consultants
Oberoi Centre, 13th Floor, Marasi Drive, Business Bay
P.O. Box No. 33299
Dubai, UAE t +971 4 2828 000
f +971 4 2828 011
PHILIPPINES
-
Gruba Law 27/F 88 Corporate Center 141 Valero St., Salcedo Village
Makati City 1227, Philippines t +63 2 889 6060
f +63 2 889 6066
w grubalaw.com wongpartnership.com