Regulation 10

of Rapid Transit Systems (Development and Building Works in Railway Corridor and Railway Protection Zone) Regulations 2021

Regulation 10

Application for permit to carry out engineering works

Amended byS 312/2023 wef 31/12/2021

Subregulation 1

Amended byS 312/2023 wef 31/12/2021

An application to the Authority for a permit to carry out engineering works within a railway corridor or railway protection zone as part of a development that is required for the purpose of regulation 9(1) must —

(a)

be made and signed by a qualified person appointed under regulation 11(1)(a) or (b)(ii) to supervise the engineering works under the development; and

(b)

be accompanied by the following:

(i)

where the engineering works are part of a development of land for which the written permission of the competent authority is required under the Planning Act 1998, a copy of that valid written permission or provisional permission;

(ii)

an engineering plan for the engineering works involved in the development;

(iii)

the notice of approval given by the Authority in approving the development proposal for the development;

(iv)

if the development involves building works — the notice of approval given by the Authority in approving the building proposal for the building works;

(v)

any other declaration, information, instrument, plan or document that the Authority requires to decide on the application.

Subregulation 2

The items mentioned in paragraph (1)(b) must be prepared and signed by a qualified person.