Singapore legislation

Regulation 12

of Rapid Transit Systems (Development and Building Works in Railway Corridor and Railway Protection Zone) Regulations 2021

Regulation 12

Resignation or termination of appointment of qualified person, etc.

Amended byS 312/2023 wef 01/06/2023

Where, at any time after the development proposal for a development is approved, an event specified in the first column of the First Schedule occurs, the person specified opposite the event in the second column of that Schedule must ensure that the Authority is notified in writing of that event within 14 days after the date specified opposite the event in the third column of that Schedule.