Skip to content

Singapore legislation

Regulation 3

of Sewerage and Drainage (Surface Water Drainage) Regulations

Regulation 3

Plans, drawings and designs submitted under section 33(3) of Act

Subregulation 1

Layout plans, designs and engineering drawings submitted under section 33(3) of the Act for the purposes of section 23, 24 or 26 of the Act shall be signed by a qualified person and the owner of the premises where the works are to be carried out.

Subregulation 2

Plans, drawings and designs referred to in paragraph (1) shall be prepared in accordance with the Code of Practice.