Workplace Safety and Health (Major Hazard Installations) Regulations 2017 · As enacted · Part 3 · Registration of Premises as Major Hazard Installation
13. Duty to notify of stoppage, etc.
Feedback & supportThe occupier of a registered major hazard installation must notify the Commissioner, in the form and manner that the Commissioner requires, if —
the occupier intends to permanently decrease the quantity of a dangerous substance present or likely to be present in the premises of the registered major hazard installation such that the premises no longer fall within the description of a major hazard installation in the Second Schedule, not less than 14 days before decreasing the quantity of the dangerous substance; or
the occupier intends to cease occupation or use of the premises as a major hazard installation, not less than 14 days before ceasing to occupy or use the premises.
[Deleted by S 434/2024 wef 01/06/2024]
Subregulation 1
The occupier of a registered major hazard installation must notify the Commissioner, in the form and manner that the Commissioner requires, if —
the occupier intends to permanently decrease the quantity of a dangerous substance present or likely to be present in the premises of the registered major hazard installation such that the premises no longer fall within the description of a major hazard installation in the Second Schedule, not less than 14 days before decreasing the quantity of the dangerous substance; or
the occupier intends to cease occupation or use of the premises as a major hazard installation, not less than 14 days before ceasing to occupy or use the premises.
Subregulation 2
[Deleted by S 434/2024 wef 01/06/2024]