Regulation 70
Preparation of demolition work
of Workplace Safety and Health (Construction) Regulations 2007
Subsidiary LegislationIn forceProvision 14 of 138
Regulation 70
Subregulation 1
Before commencing any demolition work in a worksite —
(a)
all glass and claddings on the exterior of the building to be demolished shall be removed; and
(b)
all gas, electric, water, steam and other supply lines shall be shut off and capped.
Subregulation 2
Where it is necessary to maintain any power, water, gas or electric lines during demolition in a worksite, such lines shall be so re-located or protected with substantial coverings so as to protect them from damage and to afford safety to every person.