Skip to content
Contents

3. Shared paths

Feedback & support
Amended

Last amended by an amending law of 2025. 3 amendments in all.

(1)

A path on State land that —

(a)

is surfaced with bituminous surfacing material, asphalt, concrete or pavers;

(aa)

is either —

(i)

demarcated with a red or yellow line (whether continuous or broken) of 100 millimetres in width; or

(ii)

red, blue, green or yellow in colour, or coated with a dark grey fibre reinforced polymer cement coating;

(b)

is usually at least 2 metres but not more than 4 metres in width; and

(c)

is specified or described in the First Schedule,is each declared to be a shared path for the purposes of the Act.

(2)

A path on HDB land that —

(a)

is surfaced with bituminous surfacing material, asphalt, concrete or pavers;

(aa)

is either —

(i)

demarcated with a red or yellow line (whether continuous or broken) of 100 millimetres in width; or

(ii)

red, blue, green or yellow in colour, or coated with a dark grey fibre reinforced polymer cement coating;

(b)

is usually at least one metre but not more than 4 metres in width; and

(c)

is specified or described in the Second Schedule,is each declared to be a shared path for the purposes of the Act.

(3)

A path on land vested in or under the control or management of the National Parks Board that —

(a)

is surfaced with bituminous surfacing material, asphalt, concrete or pavers;

(aa)

if the path abuts on a footpath, is demarcated with a red or yellow line (whether continuous or broken) of 100 millimetres in width;

(ab)

if the path abuts on a pedestrian‑only path, is demarcated with a continuous red line of 100 millimetres in width;

(b)

is usually at least 2.5 metres but not more than 6 metres in width; and

(c)

is specified or described in the Third Schedule,is each declared to be a shared path for the purposes of the Act.

Subregulation 1

A path on State land that —

(a)

is surfaced with bituminous surfacing material, asphalt, concrete or pavers;

(aa)

is either —

(i)

demarcated with a red or yellow line (whether continuous or broken) of 100 millimetres in width; or

(ii)

red, blue, green or yellow in colour, or coated with a dark grey fibre reinforced polymer cement coating;

(b)

is usually at least 2 metres but not more than 4 metres in width; and

(c)

is specified or described in the First Schedule,is each declared to be a shared path for the purposes of the Act.

Subregulation 2

A path on HDB land that —

(a)

is surfaced with bituminous surfacing material, asphalt, concrete or pavers;

(aa)

is either —

(i)

demarcated with a red or yellow line (whether continuous or broken) of 100 millimetres in width; or

(ii)

red, blue, green or yellow in colour, or coated with a dark grey fibre reinforced polymer cement coating;

(b)

is usually at least one metre but not more than 4 metres in width; and

(c)

is specified or described in the Second Schedule,is each declared to be a shared path for the purposes of the Act.

Subregulation 3

A path on land vested in or under the control or management of the National Parks Board that —

(a)

is surfaced with bituminous surfacing material, asphalt, concrete or pavers;

(aa)

if the path abuts on a footpath, is demarcated with a red or yellow line (whether continuous or broken) of 100 millimetres in width;

(ab)

if the path abuts on a pedestrian‑only path, is demarcated with a continuous red line of 100 millimetres in width;

(b)

is usually at least 2.5 metres but not more than 6 metres in width; and

(c)

is specified or described in the Third Schedule,is each declared to be a shared path for the purposes of the Act.

Report