Singapore legislation

Schedule 12

of Air Navigation Order

Schedule 12

Fees

TWELFTH SCHEDULEParagraph 77Fees1. [Deleted by S 40/2026 wef 01/02/2026]2. [Deleted by S 683/2018 wef 09/10/2018]First issue of Certificate of Airworthiness (Paragraph 7(1) and (4)).3.—

(1)

Where an application is made for a Certificate of Airworthiness to be issued under paragraph 7(1) of the Order in respect of an aircraft, the fee to be paid for an investigation required by the Chief Executive under that paragraph is as follows:

(a)

where the aircraft is in the Transport Category (Passenger), Transport Category (Cargo), Aerial Work Category or Private Category, the fee is $198 per 1,000 kg of the aircraft’s maximum total weight or part thereof;[S 497/2019 wef 15/07/2019](b)[Deleted by S 497/2019 wef 15/07/2019](c)where the aircraft is in the Special Category and —

(i)

the maximum total weight authorised of the aircraft is 33,000 kg or less, the fee is $6,600 for any year, or part of a year, of the period required for carrying out the investigation and all or any of the following fees, where applicable:

(A)

if the aircraft is of a type that has not been registered in Singapore — $4,900 for any year, or part of a year, of the period required for carrying out the investigation;

(B)

if the aircraft is a used aircraft — $3,300 for any year, or part of a year, of the period required for carrying out the investigation; or

(ii)

the maximum total weight authorised of the aircraft is above 33,000 kg, the fee is $198 per 1,000 kg of the aircraft’s, or part of the aircraft’s, maximum total weight authorised for any year, or part of a year, of the period required for carrying out the investigation.[S 497/2019 wef 15/07/2019](2) In this paragraph, “used aircraft” means an aircraft that does not meet the criteria for a new aircraft specified in paragraph 3.2 of Chapter 2.4 of the Singapore Airworthiness Requirements (SAR).[S 616/2017 wef 31/10/2017]Export Certificate of Airworthiness (Paragraph 7A).3A. The fee for an application for an Export Certificate of Airworthiness in respect of an aircraft under paragraph 7A of the Order is $2,997.50.[S 799/2025 wef 01/01/2026][S 181/2016 wef 01/05/2016]4. [Deleted by S 497/2019 wef 15/07/2019]Second or Subsequent Issue or Renewal of Certificate of Airworthiness (Paragraph 7 (1) and (8)).

5. When an application is made for the second or subsequent issue or the renewal of a Certificate of Airworthiness in pursuance of paragraph 7 (1) or (8) of the Order, the fee to be paid in respect thereof (including any investigation required in connection with the application) shall be $198 per 1,000 kg maximum total weight or part thereof. [S 497/2019 wef 15/07/2019]Validation of Certificate of Airworthiness (Paragraph 7 (7) and (8)).

6. The fee to be paid in respect of an application for —

(a)

the first issue of a certificate of validation of a Certificate of Airworthiness in respect of any aircraft in pursuance of paragraph 7 (7) of the Order (including any investigation required in connection with the application) shall be the same as the fee which would be paid under paragraph 3 in respect of an application for the first issue of a Certificate of Airworthiness in respect of that aircraft.(b)the second or subsequent issue or the renewal of such a certificate of validation in pursuance of paragraph 7 (7) and (8) of the Order shall be the same as the fee which would be paid under paragraph 5 of this Schedule in respect of the second or subsequent issue or the renewal of a Certificate of Airworthiness in respect of that aircraft.[S 729/2010 wef 01/12/2010]Approval or certificate for design, production or distribution of aircraft, aircraft components or aircraft materials (Paragraph 8(1) and (2)).6A. The fee to be paid by an applicant for the issue of a certificate or other form of written approval under paragraph 8(1) and (2) of the Order for the design, production or distribution of aircraft, aircraft components or aircraft materials, is $1,100 per annum for each branch of the applicant’s organisation in a different geographical location for —

(a)

a Design Organisation Approval;

(b)

a Production Organisation Approval; or

(c)

a Certificate of Approval for Distributors specified in the Singapore Airworthiness Requirements (SAR).[S 497/2019 wef 15/07/2019]Inspection, testing or evaluation (Paragraph 8(4)).6AA. Where any inspection, testing or evaluation is carried out in respect of a certificate or other form of written approval under paragraph 8(4) of the Order, the fee to be paid by an applicant for, or a holder of, the certificate or other form of written approval, as the case may be, is as follows:

(a)

where the application is made before 1 April 2018 — $90 per man‑hour or part of a man‑hour of inspection, testing or evaluation;

(b)

where the application is made on or after 1 April 2018 but before 1 April 2019 — $100 per man‑hour or part of a man‑hour of inspection, testing or evaluation;

(c)

where the application is made on or after 1 April 2019 but before 1 April 2020 — $120 per man‑hour or part of a man‑hour of inspection, testing or evaluation;

(d)

where the application is made on or after 1 April 2020 but before 1 April 2021 — $150 per man‑hour or part of a man‑hour of inspection, testing or evaluation;

(e)

where the application is made on or after 1 April 2021 — $170 per man‑hour or part of a man‑hour of inspection, testing or evaluation.[S 616/2017 wef 31/10/2017]Certificate or approval for inspection, overhaul, repair, replacement and modification of aircraft or aircraft components (Paragraphs 8A(2) and 8B(2)).6B.—

(1)

The fee to be paid by an applicant for the first application made for any certificate or other form of written approval under paragraph 8A(2) or 8B(2) of the Order is as follows:

(a)

$13,300;

(b)

the following fees, according to the applicable rating under the certificate or other form of written approval: Rating RequestedApplicable Fee 1.A1(BM)$9,700 2.A1(LM)$2,700 3.A2$6,100 4.A3$6,100 5.B1$7,600 6.B2$4,800 7.B3$4,800 8.Each C$1,500 9.Each D$1,500 10.Each MD$170.(2) Subject to sub‑paragraph (6), the fee to be paid by an applicant for an application for renewal of any certificate or other form of written approval under paragraph 8A(2) or 8B(2) of the Order that is issued before 31 October 2017 is as follows:

(a)

where the certificate or other form of written approval expires on or after 1 April 2018 but before 1 April 2019 —

(i)

$380; and

(ii)

the following fees, according to the applicable rating under the certificate or other form of written approval: Rating RequestedApplicable Fee 1.A1(BM)$300 2.A1(LM)$80 3.A2$200 4.A3$200 5.B1$230 6.B2$150 7.B3$150 8.Each C$50 9.Each D$50 10.Each MD$8;

(b)

where the certificate or other form of written approval expires on or after 1 April 2019 but before 1 April 2020 —

(i)

$1,100; and

(ii)

the following fees, according to the applicable rating under the certificate or other form of written approval: Rating RequestedApplicable Fee 1.A1(BM)$900 2.A1(LM)$250 3.A2$600 4.A3$600 5.B1$700 6.B2$450 7.B3$450 8.Each C$150 9.Each D$150 10.Each MD$25;

(c)

where the certificate or other form of written approval expires on or after 1 April 2020 but before 1 April 2021 —

(i)

$2,300; and

(ii)

the following fees, according to the applicable rating under the certificate or other form of written approval: Rating RequestedApplicable Fee 1.A1(BM)$1,800 2.A1(LM)$500 3.A2$1,200 4.A3$1,200 5.B1$1,400 6.B2$900 7.B3$900 8.Each C$300 9.Each D$300 10.Each MD$50;

(d)

where the certificate or other form of written approval expires on or after 1 April 2021 —

(i)

$3,900; and

(ii)

the following fees, according to the applicable rating under the certificate or other form of written approval: Rating RequestedApplicable Fee 1.A1(BM)$3,100 2.A1(LM)$900 3.A2$2,100 4.A3$2,100 5.B1$2,400 6.B2$1,600 7.B3$1,600 8.Each C$500 9.Each D$500 10.Each MD$90.(3) Subject to sub‑paragraph (6), the fee to be paid by an applicant for an application for renewal of any certificate or other form of written approval under paragraph 8A(2) or 8B(2) of the Order that is issued on or after 31 October 2017 is as follows:

(a)

$3,900;

(b)

the following fees, according to the applicable rating under the certificate or other form of written approval: Rating RequestedApplicable Fee 1.A1(BM)$3,100 2.A1(LM)$900 3.A2$2,100 4.A3$2,100 5.B1$2,400 6.B2$1,600 7.B3$1,600 8.Each C$500 9.Each D$500 10.Each MD$90.(4) The fee to be paid by an applicant for the issuance or renewal of any certificate or other form of written approval under paragraph 8A(2) or 8B(2) of the Order is $1,100 for each branch of the applicant’s organisation at a different address.(5) The fee to be paid by a holder of a certificate or other form of written approval under paragraph 8A(2) or 8B(2) of the Order for an application to add a rating to the certificate or other form of written approval, is as follows: Rating RequestedApplicable Fee 1.A1(BM)$9,700 2.A1(LM)$2,700 3.A2$6,100 4.A3$6,100 5.B1$7,600 6.B2$4,800 7.B3$4,800 8.Each C$1,500 9.Each D$1,500 10.Each MD$170.(6) Where an applicant for the renewal of a certificate or other form of written approval under paragraph 8A(2) or 8B(2) of the Order is incorporated in a country other than Singapore and the Authority does not carry out an inspection or audit for the renewal of the certificate or other form of written approval, sub‑paragraphs (2) and (3) do not apply to the applicant.(7) In this paragraph, the rating —“A1(BM)” means the conduct of base maintenance of an aeroplane with a maximum total weight authorised of above 5,700 kg;“A1(LM)” means the conduct of line maintenance of an aeroplane with a maximum total weight authorised of above 5,700 kg;“A2” means the conduct of maintenance of an aeroplane with a maximum total weight authorised of 5,700 kg or less;“A3” means the conduct of maintenance of a helicopter;“B1” means the conduct of maintenance of a complete turbine engine;“B2” means the conduct of maintenance of a complete piston engine;“B3” means the conduct of maintenance of an auxiliary power unit;“C” means the conduct of maintenance of any of the following components:

(a)

air conditioning and pressurisation systems (rating C1);

(b)

auto flight systems (rating C2);

(c)

communications and navigation systems (rating C3);

(d)

doors and hatches (rating C4);

(e)

electrical power and lighting systems (rating C5);

(f)

equipment (rating C6);

(g)

engine or auxiliary power unit components (other than complete engines or auxiliary power units) (rating C7);

(h)

flight control systems (rating C8);

(i)

fuel systems (rating C9);

(j)

helicopter rotor systems (rating C10);

(k)

helicopter transmission systems (rating C11);

(l)

hydraulic power systems (rating C12);

(m)

indicating and recording systems (rating C13);

(n)

landing gears (rating C14);

(o)

oxygen systems (rating C15);

(p)

propellers (rating C16);

(q)

pneumatic and vacuum systems (rating C17);

(r)

ice, rain or fire protection systems (rating C18);

(s)

windows (rating C19);

(t)

structure (rating C20);“D” means the conduct of any of the following services:

(a)

non‑destructive testing (rating D1);

(b)

other specialised services (rating D2);“MD” means the distribution of any of the following materials:

(a)

general aeronautical parts (rating MD1);

(b)

special aeronautical parts, including life limited parts (rating MD2).[S 616/2017 wef 31/10/2017]Safety inspector fees in respect of certificate or other approval for maintenance of aircraft or aircraft components (Paragraphs 8A(2) and 8B(2)).6C.—

(1)

Subject to sub‑paragraph (3), where it is necessary for a holder of, or an applicant for, a certificate or other form of written approval under paragraph 8A(2) or 8B(2) of the Order to undergo any examination, test, inspection or investigation as a result of which it is necessary for a safety inspector of the Authority to conduct any test, audit, assessment, examination, inspection or investigation (called in this paragraph a function) in Singapore, the holder or applicant, as the case may be, must pay, in addition to the appropriate fee specified in this Schedule, a daily fee specified in sub‑paragraph (2) for each day or part of each day that the safety inspector conducts any function.(2) The daily fee mentioned in sub‑paragraph (1) is —

(a)

where the function is performed on or after 1 April 2018 but before 1 April 2019 — $700;

(b)

where the function is performed on or after 1 April 2019 but before 1 April 2020 — $900;

(c)

where the function is performed on or after 1 April 2020 but before 1 April 2021 — $1,200; (d)where the function is performed on or after 1 April 2021 but before 1 January 2026 — $1,500; and

(e)

where the function is performed on or after 1 January 2026 — $1,635.(3) Sub‑paragraph (1) does not apply to the holder of, or an applicant for, a certificate or other form of written approval under paragraph 8A(2) or 8B(2) of the Order, in respect of a safety inspector’s conduct of any function, where the holder or applicant, as the case may be, is to pay a fee under paragraph 6B(1), (2), (3) or (5) of this Schedule in respect of the certificate or other form of written approval.[S 799/2025 wef 01/01/2026][S 616/2017 wef 31/10/2017]Approval of persons, simulators and courses of training or instruction (Paragraphs 11(9)(c), 20(13)(c) and (d), 23A(3)(a) and 73A).7.—

(1)

The fee to be paid by a person for the grant of an approval for the purposes of paragraph 73A of the Order shall be $1,100 per annum for each branch of the person’s organisation in a different geographical location.[S 278/2010 wef 15/05/2010](2) The fee to be paid for the grant of an approval of a person to provide a course of training or instruction under paragraph 11(9)(c) of the Order shall be $1,100 per annum for each branch of the person’s organisation in a different geographical location.[S 640/2006 wef 30/11/2006](3) The fee to be paid for the grant of an approval or renewal of approval for an approved flying school to provide a course of training or instruction under paragraph 20(13)(c) of the Order shall be $4,500 per annum.(4) The fee to be paid for the grant of approval or renewal of approval for the use of a flight simulation training device for the purpose of flight training or testing under paragraph 20(13)(d) or 23A(3)(a) of the Order shall be $1,100 for each year for which the approval is valid.[S 331/2005 wef 02/06/2005][S 348/2013 wef 17/06/2013][S 683/2018 wef 09/10/2018]8. [Deleted by S 683/2018 wef 09/10/2018]9. [Deleted by S 683/2018 wef 09/10/2018]10. [Deleted by S 497/2019 wef 01/08/2019]Aircraft Maintenance Licence (Paragraph 11).

11. The fees to be paid in respect of an aircraft maintenance licence in pursuance of paragraph 11 of the Order shall be —

(a)

in respect of each examination paper for either —

(i)

the grant of a licence; (ii)the renewal of a licence (if required); or (iii)an inclusion or extension of a rating included in a licence … … …$87.20[S 799/2025 wef 01/01/2026][S 729/2010 wef 01/12/2010][S 124/2012 wef 02/04/2012](aa)in respect of the cancellation by a candidate of a booking for an examination paper referred to in sub-paragraph (a)$30[S 729/2010 wef 01/12/2010][S 124/2012 wef 02/04/2012](ab)in respect of the re-scheduling by a candidate of an examination paper referred to in sub-paragraph (a)$20[S 729/2010 wef 01/12/2010][S 124/2012 wef 02/04/2012](b)in respect of the grant or renewal of a licence$132(c)in respect of the inclusion of an additional rating in a licence, for each additional rating$66[S 487/2006 wef 11/08/2006][S 729/2010 wef 01/12/2010][S 124/2012 wef 02/04/2012]Grant or renewal of licences for flight crew and rating therein (Paragraph 20(1), (3) and (4)), and validation of licences (Paragraph 21).12.—

(1)

The following fees shall be paid on application for the grant or renewal of, or the issue of a certificate of validation of:

(a)

an Airline Transport Pilot’s Licence (Aeroplanes), an Airline Transport Pilot’s Licence (Helicopters and Gyroplanes), a Commercial Pilot’s Licence (Aeroplanes), a Commercial Pilot’s Licence (Helicopters and Gyroplanes) or a Multi-crew Pilot’s Licence (Aeroplanes) —

(i)

for a period of 6 months$72(ii)for a period of 12 months$144[S 749/2024 wef 01/10/2024][S 570/2011 wef 04/10/2011](b)a Commercial Pilot’s Licence (Airships), a Private Pilot’s Licence (Aeroplanes), a Private Pilot’s Licence (Helicopters and Gyroplanes) or a Private Pilot’s Licence (Airships) —

(i)

for a period of 6 months$19.50(ii)for a period of 12 months$39(iii)for a period of 24 months$78[S 114/2026 wef 16/03/2026][S 617/2012 wef 17/12/2012](iv)for a period of 60 months$195[S 640/2006 wef 30/11/2006][S 124/2012 wef 02/04/2012](c)a Student Pilot’s Licence … … …$28(d)[Deleted by S 497/2019 wef 15/07/2019](e)[Deleted by S 497/2019 wef 15/07/2019](f)a Flight Radiotelephony Operator’s Licence … … …$28[S 497/2019 wef 15/07/2019][S 166/2002 wef 15/04/2002](1A) Where an application for a Commercial Pilot’s Licence or an Airline Transport Pilot’s Licence is based on an equivalent licence granted by a Contracting State other than Singapore, a fee of $345 shall be paid by the applicant, in addition to the relevant fee payable under sub-paragraph (1).[S 348/2013 wef 17/06/2013](1B) Where an application for a Multi‑crew Pilot’s Licence, a Commercial Pilot’s Licence or an Airline Transport Pilot’s Licence is based on a qualification other than an equivalent licence granted by a Contracting State other than Singapore, a fee of $83 shall be paid by the applicant, in addition to the relevant fee payable under sub-paragraph (1).[S 348/2013 wef 17/06/2013][S 21/2015 wef 26/01/2015](2) The following fees shall be paid on application for the grant or renewal of any licence to act as a member of the flight crew of an aircraft, the inclusion or renewal of a rating in such a licence, or the issue of a certificate of validation of such a licence, in respect of such of the following examinations as may be required —

(a)

[Deleted by S 497/2019 wef 15/07/2019](b)[Deleted by S 21/2015 wef 26/01/2015] (c)for a technical examination on application for the inclusion of an aircraft rating for a single type of aircraft in a licence or for the extension of such a rating to include any additional type of aircraft ... ... ... ... $59.95[S 799/2025 wef 01/01/2026][S 749/2024 wef 01/10/2024][S 487/2006 wef 11/08/2006](d)[Deleted by S 497/2019 wef 15/07/2019](e)[Deleted by S 423/2010 wef 02/08/2010] (f)[Deleted by S 497/2019 wef 15/07/2019](g)for a flying test $143.88[S 799/2025 wef 01/01/2026][S 570/2011 wef 04/10/2011](h)[Deleted by S 114/2026 wef 16/03/2026] [S 114/2026 wef 16/03/2026][S 799/2025 wef 01/01/2026][S 497/2019 wef 15/07/2019](i)[Deleted by S 21/2015 wef 26/01/2015] (j)[Deleted by S 21/2015 wef 26/01/2015] (k)for any examination or re‑examination paper to be taken —

(i)

in respect of the grant or renewal of, or the issue of a certificate of validation of, a Private Pilot’s Licence $135.16(ii)in respect of the grant or renewal of, or the issue of a certificate of validation of, a Multi‑crew Pilot’s Licence, Commercial Pilot’s Licence or Airline Transport Pilot’s Licence $168.95(iii)for the inclusion of a rating other than an aircraft rating in any licence to act as a member of a flight crew $168.95[S 799/2025 wef 01/01/2026][S 749/2024 wef 01/10/2024][S 21/2015 wef 26/01/2015](l)for cancellation by a candidate of a booking for an examination paper referred to in sub‑paragraph (k) $30[S 617/2012 wef 17/12/2012](m)for re‑scheduling by a candidate of an examination paper referred to in sub‑paragraph (k). $20[S 573/91 wef 01/01/1992][S 166/2002 wef 15/04/2002][S 487/2006 wef 11/08/2006][S 640/2006 wef 30/11/2006][S 423/2010 wef 02/08/2010][S 570/2011 wef 04/10/2011][S 124/2012 wef 02/04/2012][S 617/2012 wef 17/12/2012][S 348/2013 wef 17/06/2013][S 21/2015 wef 26/01/2015][S 181/2016 wef 01/05/2016][S 487/2006 wef 11/08/2006][S 487/2006 wef 11/08/2006]13. [Deleted by S 749/2024 wef 01/10/2024] [S 749/2024 wef 01/10/2024][S 487/2006 wef 11/08/2006]Copies of Documents.

14. The fee to be paid for the issue by the Minister or the Chief Executive of a copy or replacement of a document issued under this Order shall be $33.[S 497/2019 wef 15/07/2019][S 278/2010 wef 15/05/2010]15. [Deleted by S 711/2020 wef 01/09/2020][S 1000/2022 wef 01/01/2023][S 199/93 wef 01/08/1993][S 423/2010 wef 02/08/2010]16. [Deleted by S 1000/2022 wef 01/01/2023][S 1000/2022 wef 01/01/2023][S 199/93 wef 01/08/1993][S 423/2010 wef 02/08/2010]17. [Deleted by S 753/2019 wef 16/11/2019]Fees where functions are performed abroad.18.—

(1)

Subject to sub‑paragraph (3), where it is necessary for a holder of, or an applicant for, an aviation safety instrument to undergo any examination, test, inspection or investigation for the purpose of this Order as a result of which it is necessary for a safety inspector of the Authority to travel outside Singapore to conduct any test, audit, assessment, examination, inspection or investigation (called in this paragraph a function), the holder or applicant, as the case may be, must pay, in addition to the appropriate fee specified in this Schedule, a charge equal to any additional cost incurred by the Authority plus a daily fee specified in sub‑paragraph (2) for each day or part of each day that the safety inspector is outside Singapore while conducting any function.(2) The daily fee mentioned in sub‑paragraph (1) is —

(a)

where the function is performed before 1 April 2018 —

(i)

$1,280 for a flight operations safety inspector; and

(ii)

$610 for any other safety inspector;

(b)

where the function is performed on or after 1 April 2018 but before 1 April 2019 —

(i)

$1,400 for a flight operations safety inspector; and

(ii)

$700 for any other safety inspector;

(c)

where the function is performed on or after 1 April 2019 but before 1 April 2020 —

(i)

$1,700 for a flight operations safety inspector; and

(ii)

$900 for any other safety inspector;

(d)

where the function is performed on or after 1 April 2020 but before 1 April 2021 —

(i)

$2,000 for a flight operations safety inspector; and

(ii)

$1,200 for any other safety inspector; and

(e)

where the function is performed on or after 1 April 2021 —

(i)

$2,400 for a flight operations safety inspector; and

(ii)

$1,500 for any other safety inspector.(3) The holder of, or an applicant for, an aviation safety instrument is not required to pay the daily fee mentioned in sub‑paragraph (1) in respect of a safety inspector’s conduct of any function if the holder or applicant, as the case may be, is to pay a fee under paragraph 6B(1), (2), (3) or (5) of this Schedule in respect of the aviation safety instrument.[S 616/2017 wef 31/10/2017]Permission to organise an exhibition of flying (Paragraph 55A).

19. The fee to be paid for the grant of a written permission to organise an exhibition of flying is —

(a)

where the exhibition of flying is carried out before 1 January 2020 — $20,000; and

(b)

where the exhibition of flying is carried out on or after 1 January 2020 — $63,000.[S 753/2019 wef 16/11/2019][S 423/2010 wef 02/08/2010][S 49/92 wef 01/02/1992]20. [Deleted by S 683/2018 wef 09/10/2018]20A. [Deleted by S 37/2026 wef 01/02/2026]21. [Deleted by S 12/2023 wef 01/03/2023]21A. [Deleted by S 12/2023 wef 01/03/2023]22. [Deleted by S 832/2019 wef 02/01/2020]23. [Deleted by S 832/2019 wef 02/01/2020][S 711/2020 wef 01/09/2020][S 749/2024 wef 01/10/2024]