Singapore legislation
Regulation 47
of Boundaries and Survey Maps (Conduct of Cadastral Surveys) Rules 2005
Regulation 47
Plan heading
The heading of each strata certified plan must include —
(a)
the strata certified plan number allotted by the Chief Surveyor to that plan;
(b)
the Mukim or Town Subdivision number of the strata lot or lots surveyed; and
(c)
the scales of the site and storey plans, in the form of representative fractions shown below the respective plans.