Singapore legislation

Regulation 56

of Boundaries and Survey Maps (Conduct of Cadastral Surveys) Rules 2005

Regulation 56

Certification of strata title plan

Subregulation 1

The first sheet of a strata title plan must bear —

(a)

a certificate signed by the registered surveyor in the following form: “I, .............................................................. of ............................................., a surveyor registered under the Land Surveyors Act 1991 certify that: (a)all buildings and lots shown in this Strata Title Plan prepared by me containing sheets (No. ......... to .........) in relation to the external surface boundaries of the parcel are in accordance with *the approved Building Plans No. ......... dated ................../the approved subdivision plans ......... dated ................../the plan dated .................. for the subdivision of the building which has been authorised by a notification made by the Minister under section 21(6) of the Planning Act 1998; and (b)this plan correctly represents the survey done in strict compliance with the Boundaries and Survey Maps (Conduct of Cadastral Surveys) Rules 2005. (Signature and date of certification)Registered Surveyor. *Delete whichever is inapplicable.”; and

(b)

a certification of approval signed by the Chief Surveyor in the following form: “I, ................................................................., Chief Surveyor, Singapore, certify that the strata certified plans ST ...... to ...... shown on this Strata Title Plan have been lodged with the Singapore Land Authority and approved by me. Date:Signature: ”.

Subregulation 2

In the case of phased development where any provisional lot created in a strata subdivision is to be surveyed only upon completion of the construction of the building, the following paragraph must be added to the certification of approval by the Chief Surveyor under paragraph (1)(b): “The boundaries and dimensions of the provisional lot are inconclusive and are subject to survey.”.