Singapore legislation

Regulation 5B

of Building Control (Buildability and Productivity) Regulations 2011

Regulation 5B

Submission of productivity concept implementation plan for approval

Amended byS 990/2022 wef 22/12/2022S 506/2022 wef 30/06/2022S 689/2017 wef 15/12/2017

Subregulation 1

Amended byS 990/2022 wef 22/12/2022

For the purposes of section 5(1) of the Act —

(a)

the plans of building works mentioned in regulation 4B(6) or (7) for which an application for approval is to be made to the Commissioner of Building Control must include the productivity concept implementation plan; and

(b)

the plans of building works mentioned in regulation 4B(7A) for which an application for approval is to be made to the Commissioner of Building Control may include the productivity concept implementation plan.

Subregulation 2

Amended byS 506/2022 wef 30/06/2022S 689/2017 wef 15/12/2017

The productivity concept implementation plan must include the following:

(a)

the details of the proposed construction methods and construction systems to be implemented for the building works;

(b)

the level of use of —

(i)

buildable features;

(ii)

offsite finishes;

(iii)

prefabricated architectural systems;

(iv)

prefabricated mechanical, electrical or plumbing systems; and

(v)

specified prefabricated structural systems,for the proposed construction system;

(c)

the details of the proposed construction process and construction management to be implemented for the building works;

(d)

the details of any innovative features to be implemented for the building works;

(e)

the details of how productivity improvement can be achieved from implementing the productivity concept implementation plan;

(f)

such other documents or information as may be required by the Commissioner of Building Control.