Regulation 7

of Building Control (Buildability and Productivity) Regulations 2011

Regulation 7

Submission of structural buildable design score

Amended byS 335/2022 wef 30/04/2022S 335/2022 wef 30/04/2022S 729/2014 wef 01/11/2014S 522/2013 wef 01/09/2013S 335/2022 wef 30/04/2022

In addition to the requirements under regulation 6, if an application for approval of the detailed structural plans of any proposed building works under section 5(1) of the Act is made before an application for approval of the building plans, then the person making the application shall, at the time the application for approval of the detailed structural plans of the building works is made, submit the following documents to the Commissioner of Building Control:

(a)

a document (in such form as may be required by the Commissioner of Building Control) which bears an endorsement, by every specified person in respect of the building works, as to the buildable design score of the building works relating to the structural elements of the building works;

(b)

where regulation 4A applies, a document (in such form as may be required by the Commissioner of Building Control) which bears an endorsement, by every specified person in respect of the building works, that the building works satisfy the requirement under that regulation;

(c)

where regulation 4B applies, a document (in such form as may be required by the Commissioner of Building Control) which bears an endorsement, by every specified person in respect of the building works, that the building works satisfy the applicable requirements under that regulation.