Skip to content

Part 3 · Use of Scheduled Premises

8. Permit for certain works on scheduled premises

Feedback & support
Amended

Last amended by an amending law of 2011.

(1)

The owner or occupier of any scheduled premises must not without a permit granted by the Director‑General —

(a)

alter the method of operation of any trade or industrial process, fuel burning equipment, control equipment, treatment plant or industrial plant in or on the scheduled premises;

(b)

install, alter or replace any fuel burning equipment, control equipment, treatment plant or industrial plant in or on the scheduled premises;

(c)

erect or alter the height or dimension of any chimney through which air impurities may be emitted from the scheduled premises; or

(d)

use any fuel other than the type of fuel specified in writing by the Director‑General.

(2)

An application for a permit under subsection (1) must contain details of the proposed installation, alteration, replacement or erection.

(3)

Any person who contravenes subsection (1) shall be guilty of an offence.

Report

Part 4

Air Pollution Control

Part 5

Water Pollution Control

Part 6

Land Pollution Control

Part 7

Hazardous Substances Control

Part 8

Noise Control

Part 9

Licences

Part 9A

Pollution Control Requirements for Controlled Works

Part 10

Environmental Pollution Control Measures

Part 10A

Greenhouse Gas Control

Part 11

Enforcement

Part 12

Compensation, Damages, Fees, Costs and Expenses

Part 13

Miscellaneous Provisions

Schedules