Singapore legislation

Regulation 16

of Public Utilities (Regulated Works and WSI Design Works) Regulations 2018

Regulation 16

Duty to submit certificates of satisfactory completion

Amended byS 154/2019 wef 25/03/2019

Subregulation 1

This regulation applies to WSI works mentioned in regulation 15 where completed.

Subregulation 2

Amended byS 154/2019 wef 25/03/2019

For the purposes of section 40P(1)(b)(ii) of the Act, every professional engineer must, without delay after the completion of the WSI works, submit to the Board a certificate of satisfactory completion —

(a)

in such form and manner as the Board may require; and

(b)

with a certification by the professional engineer that —

(i)

the WSI works carried out on a water service installation (called in this paragraph the relevant water service installation) are in compliance with the requirements imposed by or under the Act;

(ii)

the relevant water service installation, and its associated electrical devices and equipment, have been tested and are safe and acceptable for operation; and

(iii)

the relevant water service installation has been tested to be watertight and is fit to convey piped water suitable for drinking.