Singapore legislation
Regulation 2
Regulation 2
Definitions
In these Regulations, unless the context otherwise requires —“approved proposal”, in relation to any development or building works, means a development proposal or building proposal, as the case may be —
that is approved by the Authority pursuant to an application under regulation 4 or 5, as may be amended with the approval of the Authority under regulation 6; and
that has not ceased to be an approved proposal under regulation 7;“building proposal” means a proposal to carry out building works within any railway corridor or railway protection zone;“building works” has the meaning given by section 2(1) of the Building Control Act 1989;“Commissioner of Building Control” means the Commissioner of Building Control appointed under section 3(1) of the Building Control Act 1989;“developer”, in relation to any development or building works, means the person for whom or on whose behalf the development or building works are carried out;“development” has the meaning given by section 3 of the Planning Act 1998;“development proposal” means a proposal to carry out any development within any railway corridor or railway protection zone;“engineering plan”, in relation to any engineering works, means —
an engineering evaluation report for the engineering works;
a document containing any drawing, details, diagram, structural details or calculations showing or relating to the engineering works; or
an instrumentation or a monitoring plan for all structures associated with a rapid transit system that may be affected by the engineering works;“engineering works” means any kind of construction work or activity relating to any development or building works that may affect the structural integrity of any structure associated with a rapid transit system or its safe and efficient operation and functioning, such as but not limited to —
building works;
any act of excavating earth, rock or other material (by whatever means) in connection with —
any work for or relating to the construction, reconstruction, extension, renovation, alteration, demolition or repair of any building, structure, road, railway, bridge, viaduct, flyover, drain or sewer;
any work for or relating to the laying, inspecting, repairing or renewing of any main, pipe, cable, fittings or other apparatus; or
any soil investigation works;
any act of boring, dredging, jacking, levelling, piling or tunnelling on or under any land or street by any mechanical means;
the driving or sinking of any earth rod, casing or tube into the ground;
the carrying out of earthworks and backfilling, or the shifting or pushing of earth or soil from one area to another, whether or not for the formation of a slope or an embankment; and
any storage or placement of large construction equipment, construction materials and stockpiling of earth or heavy objects;“must-start window period”, in relation to any development or building works, means the period mentioned in regulation 8 during which the development or building works under a development must start;“plan”, in relation to any development or building works, means a document containing any drawing, details, diagram, calculation, structural details or structural calculation showing or relating to the development or building works;“provisional permission” has the meaning given by section 2 of the Planning Act 1998;“qualified person” has the meaning given by section 2(1) of the Building Control Act 1989;“railway corridor” means the part of the land or area that is within 40 metres from the outermost edge of any part of a railway area;“railway protection zone” has the meaning given by regulation 2 of the Rapid Transit Systems (Railway Protection, Restricted Activities) Regulations (Rg 3);“written permission” has the meaning given by section 2 of the Planning Act 1998.
Definition
“approved proposal”, in relation to any development or building works, means a development proposal or building proposal, as the case may be —
that is approved by the Authority pursuant to an application under regulation 4 or 5, as may be amended with the approval of the Authority under regulation 6; and
that has not ceased to be an approved proposal under regulation 7;
Definition
“building proposal” means a proposal to carry out building works within any railway corridor or railway protection zone;
Definition
“building works” has the meaning given by section 2(1) of the Building Control Act 1989;
Definition
“Commissioner of Building Control” means the Commissioner of Building Control appointed under section 3(1) of the Building Control Act 1989;
Definition
“developer”, in relation to any development or building works, means the person for whom or on whose behalf the development or building works are carried out;
Definition
“development” has the meaning given by section 3 of the Planning Act 1998;
Definition
“development proposal” means a proposal to carry out any development within any railway corridor or railway protection zone;
Definition
“engineering plan”, in relation to any engineering works, means —
an engineering evaluation report for the engineering works;
a document containing any drawing, details, diagram, structural details or calculations showing or relating to the engineering works; or
an instrumentation or a monitoring plan for all structures associated with a rapid transit system that may be affected by the engineering works;
Definition
“engineering works” means any kind of construction work or activity relating to any development or building works that may affect the structural integrity of any structure associated with a rapid transit system or its safe and efficient operation and functioning, such as but not limited to —
building works;
any act of excavating earth, rock or other material (by whatever means) in connection with —
any work for or relating to the construction, reconstruction, extension, renovation, alteration, demolition or repair of any building, structure, road, railway, bridge, viaduct, flyover, drain or sewer;
any work for or relating to the laying, inspecting, repairing or renewing of any main, pipe, cable, fittings or other apparatus; or
any soil investigation works;
any act of boring, dredging, jacking, levelling, piling or tunnelling on or under any land or street by any mechanical means;
the driving or sinking of any earth rod, casing or tube into the ground;
the carrying out of earthworks and backfilling, or the shifting or pushing of earth or soil from one area to another, whether or not for the formation of a slope or an embankment; and
any storage or placement of large construction equipment, construction materials and stockpiling of earth or heavy objects;
Definition
“must-start window period”, in relation to any development or building works, means the period mentioned in regulation 8 during which the development or building works under a development must start;
Definition
“plan”, in relation to any development or building works, means a document containing any drawing, details, diagram, calculation, structural details or structural calculation showing or relating to the development or building works;
Definition
“provisional permission” has the meaning given by section 2 of the Planning Act 1998;
Definition
“qualified person” has the meaning given by section 2(1) of the Building Control Act 1989;
Definition
“railway corridor” means the part of the land or area that is within 40 metres from the outermost edge of any part of a railway area;
Definition
“railway protection zone” has the meaning given by regulation 2 of the Rapid Transit Systems (Railway Protection, Restricted Activities) Regulations (Rg 3);
Definition
“written permission” has the meaning given by section 2 of the Planning Act 1998.