Singapore legislation
Regulation 5
Regulation 5
Application for approval of building proposal for building works
Subregulation 1
If a development involves building works within a railway corridor or railway protection zone, an application to the Authority for the approval of a building proposal for the building works that is required for the purpose of regulation 3(2) must —
be made and signed by a qualified person appointed under regulation 11(1)(b)(i) to supervise the development;
be submitted at the same time the plans for the building works are submitted to the Commissioner of Building Control under the Building Control Act 1989;
be submitted before the end of the period of 12 months after the date on which the Authority approves the development proposal for the development; and
be accompanied by the following:
a plan —
consisting of or containing the site and location of the site of the development; and
showing the location of the site of the development in relation to the railway or railway area;
a layout plan of the building works;
a plan consisting of or containing the sections and elevations of any building or structure comprised in the building works;
an engineering evaluation report on how the building works may affect the structural integrity of any structure associated with a rapid transit system or its safe and efficient operation and functioning;
any other declaration, information, instrument, plan or document that the Authority requires to decide on the application.
Subregulation 2
The building proposal mentioned in paragraph (1) must be prepared and signed by a qualified person appointed under regulation 11(1)(b)(i) to supervise the development.
Subregulation 3
The items mentioned in paragraph (1)(d) must be prepared and signed by a qualified person appointed under regulation 11(1) to supervise the development or the engineering works under the development, as specified by the Authority for each item.