Singapore legislation
Regulation 4
Regulation 4
Application for approval of development proposal for development
Subregulation 1
An application to the Authority for the approval of a development proposal for a development within a railway corridor or railway protection zone that is required for the purpose of regulation 3(1) must —
be made and signed by a qualified person appointed under regulation 11(1)(a) or (b)(i) to supervise the development;
be submitted only after the application for planning permission for the development is made to the competent authority under section 13(1) of the Planning Act 1998; and
be accompanied by the following:
a plan —
consisting of or containing the site and location of the site of the development; and
showing the location of the site of the development in relation to the railway or railway area;
a layout plan of the development;
a plan consisting of or containing the sections and elevations of any building or structure comprised in the development;
an engineering evaluation report on how the development may affect the structural integrity of any structure associated with a rapid transit system or its safe and efficient operation and functioning;
any other declaration, information, instrument, plan or document that the Authority requires to decide on the application;
where the development is a development of land for which the written permission of the competent authority is required under the Planning Act 1998, a copy of that valid written permission or provisional permission.
Subregulation 2
The development proposal mentioned in paragraph (1) must be prepared and signed by a qualified person appointed under regulation 11(1)(a) or (b)(i) to supervise the development.
Subregulation 3
The items mentioned in paragraph (1)(c)(i) to (v) must be prepared and signed by the qualified person appointed under regulation 11(1) to supervise the development or the engineering works under the development, as specified by the Authority for each item.