Building Control Act 1989 · 2020 Revised Edition · Part 2 · Control of Building Works
5A. Deviations from approved building plans
Feedback & supportLast amended by an amending law of 2023. 3 amendments in all.
Where the plans of any building works or proposed building works have been approved by the Commissioner of Building Control under section 5(3)(a) and the developer of the building works intends to depart or deviate from the plans approved, the developer must apply to the Commissioner of Building Control for his or her approval of the amended plans showing the proposed departure or deviation.
building works
“building works” means —(a)the erection, extension or demolition of a building;(b)the alteration, addition or repair of a building;(c)the provision, extension or alteration of any air conditioning service or ventilating system in or in connection with a building,and includes any fixed installation works, and any site formation works connected with or carried out for the purpose of paragraph (a), (b) or (c);
An application under subsection (1) must be accompanied by —
the amended plans of the building works prepared in accordance with the building regulations by the appropriate qualified person mentioned in section 5(2)(b)(i) or (ii) or both, as the case may be;
the names and prescribed particulars of —
the appropriate qualified person whom the developer or builder of the building works has appointed to prepare the amended plans; and
where the building works comprise wholly or partly any geotechnical building works, the geotechnical engineer whom the developer or builder of the building works has appointed to prepare the amended plans relating to the geotechnical aspects of those geotechnical building works;
in the case of major building works, a certificate from the following accredited checkers:
a certificate by an accredited checker stating that he or she has checked the amended plans relating to those building works and that, to the best of the accredited checker’s knowledge and belief, the amended plans so checked do not show any inadequacy in the key structural elements of the building to be erected or affected by those building works; and
where the building works comprise wholly or partly of any geotechnical building works, a certificate by a specialist accredited checker (who may or may not be the same accredited checker mentioned in sub‑paragraph (i)) stating that the specialist accredited checker has checked the amended geotechnical aspects of the geotechnical building works and that, to the best of the specialist accredited checker’s knowledge and belief, there is no inadequacy in the geotechnical aspects relating to those geotechnical building works; (c)the certificate (in the form prescribed) signed by the qualified person appointed to prepare the amended plans of those building works, certifying that the qualified person prepared those amended plans; and
any other documents prescribed in the building regulations.
The first approval granted under section 5 of any plans of building works ends and is superseded to the extent that the amended plans relating to those same building works are approved under this section (whether or not the approval also relates to other building works).
amended plans
“amended plans” means plans showing any deviation from, or any amendment or addition to, any plans of building works approved or deemed approved under section 5(3) or 5AA(1);