Schedule 2
Schedule 2
Items of equipment to be maintained at facility or installation
SECOND SCHEDULERegulation 5(1)Items of equipment to be maintained at facility or installation
1. At least one set of equipment designed for the recovery of oil spilled onto the sea as specified by the Port Master.2.—
At least one craft specially suited for anti-pollution operations and equipped with a complete set of dispersant spray booms as approved by the Port Master, from which dispersants can be applied on to the sea surface.(2) The craft must also be equipped for night operations and shall have on board at least 2,000 litres of dispersants (which shall comply with the specifications set out in the First Schedule).
3. Ancillary equipment for beach cleaning operations including —
at least 12 knapsack sprayers each of 20 litre capacity;
at least 2 dispensing pumps.4.—
At least 2 portable VHF radio telephone sets on a frequency specified by the Port Master with transmitter power not exceeding 2 watts.(2) The radio telephone sets and transmitter power must be approved by the Info‑communications Media Development Authority (established by section 3 of the Info‑communications Media Development Authority Act 2016 (Act 22 of 2016)).[S 479/2016 wef 01/10/2016]5. At least 300 metres of Oil Containment Barrier equipped with a connecting device for common linkage with other oil containment barriers during joint use which are approved by the Authority.