Singapore legislation

Schedule 3

of Prevention of Pollution of the Sea (Oil Pollution Preparedness, Response and Co-operation) Regulations

Schedule 3

Items of equipment to be maintained on board a tug boat

THIRD SCHEDULERegulation 5(2)Items of equipment to be maintained on board a tug boat

1. At least one pump capable of delivering 250 litres of water per minute at 70-metre head.

2. At least one suitable inductor, one suitable nozzle and a suitable length of hose connected to the pump. [G.N. No. S 271/99]

Schedule 3 — Prevention of Pollution of the Sea (Oil Pollution Preparedness, Response and Co-operation) Regulations