Singapore legislation
Schedule 1
Schedule 1
Material, substance, product or article
FIRST SCHEDULERegulation 2Material, substance, product or article 1. Cable penetration insulation
2. Fire protection board, panel, wall and door
3. Gasket
4. Refractory lining
5. Sprayed insulation
6. Thermal insulation of pipe, boiler, pressure vessel and process vessel.[S 434/2024 wef 01/06/2024]