(1)

Where any controlled works constitute a new venture under section 26A of the Energy Conservation Act 2012 for which an assessment mentioned in that section must be conducted and a report of the assessment approved by the Director-General under that section, the Director-General must not issue a design certificate or clearance certificate for the controlled works without first approving the report.

(2)

Despite subsection (1), the Director-General may issue the applicant with a design certificate or clearance certificate subject to the condition (in addition to any other condition that may be imposed under section 33D(2)(a) or 33E(3)(a) (as the case may be)) that the applicant must submit the report mentioned in subsection (1) to the Director-General for his or her approval within the period specified by the Director-General.

Report

Part 10

Environmental Pollution Control Measures

Part 10A

Greenhouse Gas Control

Part 11

Enforcement

Part 12

Compensation, Damages, Fees, Costs and Expenses

Part 13

Miscellaneous Provisions

Schedules