Section 20A

of Planning Act 1998

Section 20A

Power to require as-built plans

Amended by7/20177/2017

(1)

Subject to subsection (2), the competent authority may, in respect of any development of any land or any works within a conservation area authorised in a planning permission or conservation permission, require a developer to submit, in such form as the competent authority may require —

(a)

as-built plans of the development or works prepared by a land surveyor in accordance with the requirements specified by the competent authority;

(b)

a declaration by the land surveyor who prepared the as‑built plans that the as‑built plans have been prepared by the land surveyor in accordance with the requirements mentioned in paragraph (a); and

(c)

such other documents as the Minister may prescribe.

Amended by7/2017

(2)

Subsection (1) applies at any time after the commencement of the development or works but before —

(a)

the Commissioner of Building Control grants a temporary occupation permit or a certificate of statutory completion under the Building Control Act 1989, whichever is earlier, for every building authorised in the relevant permission; or

(b)

where a temporary occupation permit or a certificate of statutory completion is not required under the Building Control Act 1989, the development or works is complete.

Amended by7/2017
Section 20A — Planning Act 1998 | laws.sg