Singapore legislation

Regulation 11

of Sewerage and Drainage (Protection of Public Sewerage System) Regulations 2017

Regulation 11

Construction survey following completion of specified activity

Subregulation 1

Upon the completion of any specified activity in a part of a public sewer corridor, the contractor of the activity must —

(a)

carry out or cause to be carried out a construction survey to establish whether the public sewerage system which runs through that part of the public sewer corridor is damaged or adversely affected by the activity; and

(b)

submit a copy of the report of the construction survey to the Board within the time specified in paragraph (2).

Subregulation 2

For the purposes of paragraph (1), the time is —

(a)

such time as may be specified by the Board; or

(b)

where the Board does not specify any time —

(i)

in the case of a specified activity with a plan requiring the Commissioner’s approval and in respect of which an application is made for the issue of a compliance certificate under section 33(8) of the Act, when the application is made; and (ii)in any other case, when the declaration and certificate of completion of works is submitted under regulation 9(4)(f).

Subregulation 3

A contractor who contravenes paragraph (1) shall be guilty of an offence.