Singapore legislation

Regulation 7

of Air Navigation (98 — Special Operations) Regulations 2018

Regulation 7

Variation of special operations approval

Subregulation 1

A Singapore operator with any special operations approval must obtain the Director‑General of Civil Aviation’s approval before varying —

(a)

the special operation that is the subject of the special operations approval; or

(b)

a document or procedure approved for the special operation.

Subregulation 2

An application to vary a special operations approval or the period for which a special operations approval is valid —

(a)

must be made to the Director‑General of Civil Aviation in the form and manner required by the Director‑General of Civil Aviation; and

(b)

must contain —

(i)

the details of the proposed variation, including the necessary changes to the Singapore operator’s Operations Manual and all other relevant documentation if the proposed variation is approved; and

(ii)

the results of a safety risk assessment conducted by the Singapore operator to assess the level of safety of the special operation if the proposed variation is approved.

Subregulation 3

After considering the application made under paragraph (2), the Director‑General of Civil Aviation may —

(a)

approve the variation subject to conditions, restrictions and limitations;

(b)

refuse to approve the variation sought; or

(c)

withdraw the relevant special operations approval.