Skip to content

Part 2 · Applications for and Grant of Permits

12. Applicant to be notified of decision

Feedback & support
(1)

The Director‑General may grant or refuse to grant a permit without assigning any reason.

(2)

If the Director‑General decides to grant a permit, the Director‑General must give the permit to the applicant as soon as practicable after making the decision.

(3)

If the Director‑General decides not to grant a permit, the Director‑General must inform the applicant of the decision as soon as practicable after making the decision.

(4)

A contravention of this regulation in relation to a decision does not affect the validity of the decision.

Subregulation 1

The Director‑General may grant or refuse to grant a permit without assigning any reason.

Subregulation 2

If the Director‑General decides to grant a permit, the Director‑General must give the permit to the applicant as soon as practicable after making the decision.

Subregulation 3

If the Director‑General decides not to grant a permit, the Director‑General must inform the applicant of the decision as soon as practicable after making the decision.

Subregulation 4

A contravention of this regulation in relation to a decision does not affect the validity of the decision.

Report

Part 3

Revocation, Surrender and Variation of Permits

Part 4

Orders by Director‑General in Relation to Hazardous and Other Wastes

Part 5

Miscellaneous