Regulation 1
Citation and commencement
These Regulations are the Land Betterment Charge (Table of Rates and Valuation Method) Regulations 2022 and come into operation on 1 August 2022.
/akn/sg/act/sub_leg/2021/LBCA-S569-2022
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
Land Betterment Charge (Table of Rates and Valuation Method) Regulations 2022 is Singapore Subsidiary Legislation, cited as Subsidiary Legislation LBCA-S569-2022 2021, currently marked in force and first recorded in 2021.
Part 1
Citation and commencement
These Regulations are the Land Betterment Charge (Table of Rates and Valuation Method) Regulations 2022 and come into operation on 1 August 2022.
Definitions
In these Regulations, unless the context otherwise requires —“appropriate geographical sector”, in relation to any land, means the geographical sector set out in the plans in the Second Schedule within which the land falls;“floor area” has the meaning given by the Planning (Development) Rules 2008 (G.N. No. S 113/2008);“HDB” means the Housing and Development Board established by the Housing and Development Act 1959;“land area” means the area of a development site as calculated by the competent authority from any plan submitted under section 13 of the Planning Act 1998 or section 10(4) of the predecessor Act;“landed dwelling‑house” means a detached house, semi‑detached house, linked or terrace house or townhouse that is or is to be used wholly or mainly for the purpose of human habitation, whether or not comprised within a strata title plan registered under the Land Titles (Strata) Act 1967;“non-landed residential building” means a building that is or is to be used wholly or mainly for the purpose of human habitation but is not —
a strata landed dwelling-house; or
a single dwelling-house;“rate” means the rate specified in the Second Schedule;“strata landed dwelling-house” means a detached house, semi‑detached house, linked or terrace house or townhouse, comprised within a strata title plan, that is or is to be used wholly or mainly for the purpose of human habitation;“strata title plan” means a strata title plan registered under the Land Titles (Strata) Act 1967;“temporary written permission”, in relation to a development or a subdivision of any land, means a planning permission or conservation permission granted for a specified period of 10 years or shorter;“URA” means the Urban Redevelopment Authority established by the Urban Redevelopment Authority Act 1989;“Use Group” means a Use Group set out in the First Schedule;“1958 Master Plan” has the meaning given by paragraph 15(1) of the Land Betterment Charge (Concessionary Relief) Order 2022 (G.N. No. S 570/2022);“2019 Master Plan” means the 1958 Master Plan amended —
under section 6(1) of the predecessor Act; and
under section 8(1) of the Planning Act 1998 as in force on 27 November 2019.
“appropriate geographical sector”, in relation to any land, means the geographical sector set out in the plans in the Second Schedule within which the land falls;
“floor area” has the meaning given by the Planning (Development) Rules 2008 (G.N. No. S 113/2008);
“HDB” means the Housing and Development Board established by the Housing and Development Act 1959;
“land area” means the area of a development site as calculated by the competent authority from any plan submitted under section 13 of the Planning Act 1998 or section 10(4) of the predecessor Act;
“landed dwelling‑house” means a detached house, semi‑detached house, linked or terrace house or townhouse that is or is to be used wholly or mainly for the purpose of human habitation, whether or not comprised within a strata title plan registered under the Land Titles (Strata) Act 1967;
“non-landed residential building” means a building that is or is to be used wholly or mainly for the purpose of human habitation but is not —
a strata landed dwelling-house; or
a single dwelling-house;
“strata landed dwelling-house” means a detached house, semi‑detached house, linked or terrace house or townhouse, comprised within a strata title plan, that is or is to be used wholly or mainly for the purpose of human habitation;
“strata title plan” means a strata title plan registered under the Land Titles (Strata) Act 1967;
“temporary written permission”, in relation to a development or a subdivision of any land, means a planning permission or conservation permission granted for a specified period of 10 years or shorter;
“URA” means the Urban Redevelopment Authority established by the Urban Redevelopment Authority Act 1989;
“1958 Master Plan” has the meaning given by paragraph 15(1) of the Land Betterment Charge (Concessionary Relief) Order 2022 (G.N. No. S 570/2022);
“2019 Master Plan” means the 1958 Master Plan amended —
under section 6(1) of the predecessor Act; and
under section 8(1) of the Planning Act 1998 as in force on 27 November 2019.
Part 2
Prescribed percentage of increase in value of any land
For the purposes of section 8 of the Act, the prescribed percentage of the increase in the value of land likely to accrue from the giving of a chargeable consent in relation to a development of any land is as follows:
100% in the case of a development mentioned in section 8(2)(a) or (b) of the Act;
70% in any other case.
Part 3
Application of Part
This Part applies only to chargeable consent relating to —
a development or a subdivision of any land not mentioned in section 9(2) of the Act; or
a development or subdivision in respect of which no election under section 9(3)(a) of the Act is made by all taxable persons concerned.
Working out pre-chargeable valuation: general
Subject to Divisions 2 and 3 and section 11(3) and (4) of the Act, the pre‑chargeable valuation of any land in relation to which a chargeable consent is given is to be worked out in accordance with the formulawhere —
C is the floor area of the last authorised development of the land for any purpose —
in respect of which development charges, land betterment charges and penalty taxes mentioned in section 11(3)(a) of the Act are earlier paid or are payable;
in connection with which there is —
an exemption or a remission from any liability to pay any development charges or land betterment charges mentioned in section 11(3)(c) of the Act; or
a concessionary relief under section 13 of the Act from any liability to pay any land betterment charges; or
in connection with which there is no liability to pay any development charges, land betterment charges and penalty taxes mentioned in section 11(3)(a) of the Act; and
D is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Use Group within which that purpose in C falls.
However, where the pre‑chargeable valuation worked out according to the formula in paragraph (1) for the last authorised development of the land for any purpose in connection with which there is —
an exemption or a remission from any liability to pay any development charges or land betterment charges mentioned in section 11(3)(c) of the Act;
a concessionary relief under section 13 of the Act from any liability to pay any land betterment charges; or
no liability to pay any development charges, land betterment charges and penalty taxes mentioned in section 11(3)(a) of the Act,is lower than the pre-chargeable valuation worked out according to the same formula, in relation to an authorised development of the same land for any purpose immediately before that last authorised development of the land but authorised on or after 1 September 1989 and in respect of which development charges, land betterment charges and penalty taxes mentioned in section 11(3)(a) of the Act were paid (called the prior authorised development), then the pre‑chargeable valuation for the last authorised development of the land must be disregarded and the pre‑chargeable valuation of the prior authorised development is instead the pre‑chargeable valuation of the land.
Working out post-chargeable valuation: general
Subject to Divisions 2 and 3, the post‑chargeable valuation of any land in relation to which a chargeable consent is given is the sum of the following:
the value of the development of the land that was previously authorised and is to be retained on completion of any development of, or varying a controlled activity restrictive covenant with respect to, any land under the chargeable consent;
the value of —
the development a person is entitled to carry out on the land as a result of the giving of the chargeable consent; or
the controlled activity a person is entitled to carry on or not carry on, or a person is released from carrying on, with respect to the land as a result of varying a controlled activity restrictive covenant under the chargeable consent given.
For the purposes of paragraph (1)(a), the value of the development of any land that was previously authorised and is to be retained on completion of any development of, or varying a controlled activity restrictive covenant with respect to, any land under a chargeable consent given, is to be worked out in accordance with the formulawhere —
A1 is the floor area of the development for any purpose which was previously authorised and is to be retained on completion of the development of, or varying the controlled activity restrictive covenant with respect to, the land; and
B1 is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Use Group within which that purpose in A1 falls.
For the purposes of paragraph (1)(b), the value of —
the development a person is entitled to carry out on the land as a result of the giving of the chargeable consent; or
the controlled activity a person is entitled to carry on or not carry on, or a person is released from carrying on, as a result of varying a controlled activity restrictive covenant under the chargeable consent given,is to be worked out in accordance with the formulawhere —
A2 is the floor area of —
the development a person is entitled to carry out on the land for any purpose as a result of the giving of the chargeable consent; or
the development on the land in respect of which a controlled activity a person is entitled to carry on or not carry on, or a person is released from carrying on, with respect to the land for any purpose as a result of varying a controlled activity restrictive covenant under the chargeable consent given; and
B2 is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Use Group within which that purpose falls.
Purpose not within any Use Group
Where the floor area of any development referred to in regulation 5 or 6 is authorised or to be authorised for a purpose not falling within any Use Group —
the rate D referred to in the formula in regulation 5; and
the rates B1 and B2 referred to in the formulae in regulation 6,are, respectively, such rates as the Authority determines to be just and reasonable, having regard to the Use Group which most closely corresponds to the purpose for which the development is authorised or to be authorised.
Special provision for residential developments
Where —
any land is used or permitted to be used under the Planning Act 1998 or the predecessor Act for a residential purpose only; and
the chargeable consent given is —
a written permission entitling a person to use the land for that purpose; and
expressed in terms of approved density of “persons per hectare” or “persons per acre” only,the pre-chargeable valuation of the land in relation to which the chargeable consent is given is the higher of the following:
the amount worked out according to the formula in regulation 5;
the amount worked out according to the formula in regulation 5 as modified by paragraphs (2), (3), (4) and (5).
Except as provided in paragraph (3), the formula in regulation 5 applies as if all references to the floor area in that formula were substituted with references to the area obtained —
by multiplying firstly, the approved density with a factor as follows:
0.0056 unless sub-paragraph (ii) applies;
0.0042 if the land is the subject of a State title containing a development control restrictive covenant, and the taxable person is the HDB; and
then by multiplying that product under sub‑paragraph (a) with the area of the land as specified in the plans which form the subject of the written permission.
For the purposes of paragraph (2), approved density, if expressed in terms of “persons per acre” must be converted to be in terms of “persons per hectare”.
However, where the land is zoned for Residential purpose or for Residential/Institution purpose or for Residential with Commercial at 1st Storey purpose in the 2019 Master Plan with a specified plot ratio, and the 2019 Master Plan value of the land (as worked out according to paragraph (5)) is lower than the pre‑chargeable valuation of the land using the formula in regulation 5 as modified by paragraph (2) and using the rate specified in the Third Schedule in place of the rate in the Second Schedule, the pre-chargeable valuation of the land is to be instead worked out using the formula in regulation 5 as modified by regulation 11(2), where applicable as if all the references to the floor area and Use Group in the formula were substituted with references as follows:
where the land is zoned for Residential purpose or for Residential/Institution purpose in the 2019 Master Plan with a specified plot ratio —
the floor area is the area worked out in accordance with the formula(ii)the Use Group of the last authorised development of the land is a reference to B2;
where the land is zoned for Residential with Commercial at 1st Storey purpose with a specified plot ratio in the 2019 Master Plan —
the floor area for Residential purpose is the area worked out in accordance with the formula(ii)the Use Group of the last authorised development of the land is a reference to B2;
where the land is zoned for Residential with Commercial at 1st Storey purpose with a specified plot ratio in the 2019 Master Plan —
the floor area for Commercial purpose is the area worked out in accordance with the formula(ii)the Use Group of the last authorised development of the land is a reference to A.
For the purposes of paragraph (4) —
the 2019 Master Plan Value of any land that is zoned for Residential purpose in the 2019 Master Plan or for Residential/Institution purpose in the 2019 Master Plan with a specified plot ratio, is the value worked out in accordance with the formula(b)where the land is zoned for Residential with Commercial at 1st Storey purpose in the 2019 Master Plan, the 2019 Master Plan value is worked out in accordance with the formulawhere —
X1 is the plot ratio specified for the land in the 2019 Master Plan (without any modification by Paragraph 6.4 of the written statement to the 2019 Master Plan) multiplied by the area of the land as specified in the plans which form the subject of the written permission;
Y1 is the rate specified in the Third Schedule corresponding to Use Group B2 and the appropriate geographical sector of the land as defined in the Third Schedule; and
Y2 is the rate specified in the Third Schedule corresponding to Use Group A and the appropriate geographical sector of the land as defined in the Third Schedule.
The following provisions apply for the purposes of determining the pre‑chargeable valuation and the post‑chargeable valuation in relation to any residential development comprising both strata landed dwelling‑houses and non‑landed residential buildings:
the formulae in regulation 5 is to apply in the first instance as if the floor area of the residential development that is permitted to be used —
for the strata landed dwelling‑houses;
for the non-landed residential buildings;
for non-residential use, if any; and
as the common property of the residential development,are each separate and distinct developments, and then the respective values so derived must be totalled;
the formulae in regulation 6 is to apply as if the floor area of the residential development that was previously authorised or is to be authorised, as the case may be —
for the strata landed dwelling-houses;
for the non-landed residential buildings;
for non-residential use, if any; and
as the common property of the residential development,are each separate and distinct developments, and then the respective values so derived must be totalled;
where any part of the common property of the residential development is designed or constructed to be used exclusively or predominantly for the purpose of any of the strata landed dwelling-houses or non-landed residential buildings, the floor area of that part of the common property must be reckoned as part of the floor area of the strata landed dwelling‑houses or non-landed residential buildings, as the case may be;
with regard to any part of the common property of the residential development not falling within sub‑paragraph (c), the rate to be applied in the formulae prescribed in regulations 5 and 6, respectively, must be the average of the 2 rates for Use Groups B1 and B2 corresponding to the appropriate geographical sector of the land on which the residential development is situated.
For the purposes of paragraph (6), the common property of a residential development means all floor area, which is neither —
floor area permitted or previously authorised or to be authorised for non‑residential use; nor(b)comprised within any strata landed dwelling‑house or any unit in a non‑landed residential building comprised in the residential development.
Special provision for development involving single dwelling‑house
Despite regulations 5 and 8, where the development of the land authorised is a single dwelling‑house erected on one or more lots of land where there is no other dwelling‑house erected on the lot or those lots of land, the pre‑chargeable valuation for the dwelling‑house is the amount of land betterment charge that is not payable for the land worked out according to paragraph 16 of the Land Betterment Charge (Concessionary Relief) Order 2022.
Special provision for Use Groups F, G and H
Where any land is authorised to be developed for a purpose falling within Use Group F, G or H, the formulae in regulations 5 and 6 must apply as if all references in those formulae to floor area were substituted with references to the land area of the land.
Multiple purposes
Where a chargeable consent entitles a person to develop any land for 2 or more purposes falling within 2 or more Use Groups, the land betterment charge in respect of the chargeable consent given in relation to the development of the land is to be determined in accordance with Part 2 of the Act and, unless an election is made under section 9(3)(a) of the Act, the formulae in regulations 5 and 6, subject to the modifications in this regulation.
Where the land, or the building on or to be erected on the land, may be divided into parts, each of which is intended to be used exclusively for any one of the purposes falling within 2 or more Use Groups, sections 8 and 9(1) of the Act and these Regulations apply to each part as if each part were a separate development.
Where it is impracticable to divide any floor or part of a floor of the building on or to be erected on the land in the manner described in paragraph (2) —
subject to sub-paragraphs (b) and (c), in determining the post‑chargeable valuation properly attributable to the floor or part of a floor, B2 in the formula specified in regulation 6(3) is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Predominant Use Group of the land;
where the land is zoned in the Master Plan for any purpose set out in the first column of the table in Part 1 of the Fourth Schedule, in determining the post‑chargeable valuation properly attributable to the floor or part of a floor, B2 in the formula specified in regulation 6(3) is to be determined in accordance with the formula set out opposite in the second column of that table corresponding to that purpose; or
where the land is sold or leased by or on behalf of the Government, or by the URA before 1 January 1983 (whether acting on its own behalf or as an agent for the HDB), and the terms and conditions of the sale or lease —
state that the land is to be developed for 2 or more purposes (each called in this regulation a specified purpose); and
state the floor area for each specified purpose,then, in determining the post‑chargeable valuation properly attributable to the floor or part of a floor, B2 in the formula specified in regulation 6(3) is the weighted average of the relevant rates for the specified purposes, calculated according to the amount of floor area for each specified purpose.
The land betterment charge for a chargeable consent given in relation to a development of the whole land is the aggregate of such of the following as may be applicable:
the amount of every land betterment charge attributable to each part mentioned in paragraph (2);
the amount of every land betterment charge attributable to a floor or part of a floor mentioned in paragraph (3).
For the purposes of paragraph (3)(c) —
where the Authority is of the opinion that the amount of floor area for a specified purpose is not material having regard to the total floor area of the development on the land, the Authority may disregard that specified purpose when calculating the weighted average in paragraph (3)(c);
the Authority must disregard any variation or changes to the terms and conditions of the sale or lease of the land that are agreed on, after the sale or lease of the land, between —
the purchaser or lessee of the land; and
the vendor or lessor of the land referred to in paragraph (3)(c) which sold or leased the land; and
the Authority must treat the amount of floor area for any specified purpose as being a fixed amount, a maximum amount or a minimum amount, depending on what is stated in the terms and conditions of the sale or lease of the land.
In this regulation —
“Predominant Use Group”, in relation to any land, means the Use Group for the purposes (as set out in the First Schedule) for which are the predominant use permissible under the zoning in the Master Plan for the development of that land;
“relevant rate”, in relation to a specified purpose, means the rate corresponding to both the appropriate geographical sector of the land and the Use Group within which that specified purpose falls.
Special provision where partial change of use or addition or alteration work with increase in floor area
Where the chargeable consent entitles a person —
to change the use of any part (not the whole) of any land to any purpose without resulting in an increase in the floor area;
to carry out addition or alteration works on any land —
without any change in the use of any part of the land to another purpose of any kind; and
resulting in an increase in the floor area; or
to carry out addition or alteration works on any land resulting in —
an increase in the floor area (called in this regulation the additional floor area); and
a change in the use of any part (not the whole) of the land together with the additional floor area to another purpose of any kind,the pre-chargeable valuation and the post‑chargeable valuation of the land in relation to which the chargeable consent is given is to be worked out in accordance with paragraphs (2), (3) and (4), respectively, unless the taxable person concerned requests under paragraph (5) the Authority to disapply this paragraph in ascertaining the amount of land betterment charge payable by the taxable person for that chargeable consent.
Where the chargeable consent entitles a person to change the use of any part (not the whole) of any land to any purpose as described in paragraph (1)(a) —
the pre‑chargeable valuation of the land in relation to which the chargeable consent is given is to be worked out in accordance with the formulawhere —
Y1 is the floor area affected by the proposed change of use; and
Z1 is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Use Group within which the last permanent approved use falls; and
the post-chargeable valuation of the land in relation to which the chargeable consent is given is to be worked out in accordance with the formulawhere —
Y1 is the floor area affected by the proposed change of use; and
Z2 is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Use Group within which that proposed purpose falls.
Where the chargeable consent entitles a person to carry out addition and alteration works described in paragraph (1)(b) without any change in the use of any part of the land to another purpose of any kind —
the pre-chargeable valuation of the land in relation to which the chargeable consent is given is zero; and
the post-chargeable valuation of the land in relation to which the chargeable consent is given is to be worked out in accordance with the formulawhere —
Y2 is the increase in floor area affected by the proposed addition or alteration works; and
Z3 is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Use Group within which the continued purpose falls.
Where the chargeable consent given entitles a person to carry out addition and alteration works on any land described in paragraph (1)(c) —
the pre‑chargeable valuation of the land in relation to which the chargeable consent is given is to be worked out in accordance with the formulawhere —
Y2 is the floor area (excluding the additional floor area) affected by the proposed change of use; and
Z1 is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Use Group within which the last permanent approved use falls; and
the post-chargeable valuation of the land in relation to which the chargeable consent is given is to be worked out in accordance with the formulawhere —
Y3 is the floor area (excluding the additional floor area) affected by the proposed change of use;
Y4 is the additional floor area;
Z3 is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Use Group within which that proposed purpose falls; and
Z4 is the rate in the Second Schedule corresponding to both the appropriate geographical sector of the land and the Use Group within which the purpose for the additional floor area falls.
Where the chargeable consent entitles a person —
to change the use of a part (not the whole) of, or carry out addition or alteration works on, any land which is not comprised in a strata title plan;
to change the use of a part (not the whole) of, or carry out addition or alteration works to, any common property (as defined in the Building Maintenance and Strata Management Act 2004) comprised in a strata title plan land, for any purpose; or
to change the use of a part (not the whole) of, or carry out addition or alteration works to, a lot within a strata title plan for any purpose, provided that the subsidiary proprietor of that lot is the same as the subsidiary proprietors for every other lot on the same strata title plan,the owner of the land may request the Authority to disapply paragraph (1) in ascertaining the amount of land betterment charge payable by the taxable person for that chargeable consent.
A request under paragraph (5) by a taxable person to disapply paragraph (1) in ascertaining the amount of land betterment charge payable by the taxable person for that chargeable consent relating to any land —
must be made to the Authority no later than 5 working days after the chargeable consent is given;
once received by the Authority, cannot be withdrawn; and
may be made only if a formula is prescribed under these Regulations for ascertaining both the pre‑chargeable valuation and post‑chargeable valuation of the land.
To avoid doubt, a reference in this regulation to changing the use of a part of any land includes a reference to changing the use of a part of any building on the land.
Disregarded hotel development in determining pre-chargeable valuation
The prescribed lands for the purposes of section 11(4)(e) of the Act are listed by their respective addresses and are delineated by maps set out in the Fifth Schedule.
Discounting for temporary written permission
Where any chargeable consent given in relation to a development or a subdivision of any land is a temporary written permission, the amount of land betterment charge payable under the Act in respect of the chargeable consent is ascertained by —
first, working out the amount of land betterment charge according to Division 1 or 2;
then, ascertaining the percentage specified in the Sixth Schedule corresponding to the range within which falls the specified period (rounded up to the nearest month or year, as the case may be) that the planning permission or conservation permission is granted; and
finally, calculating the sum that is the percentage ascertained under paragraph (b) of the amount worked out under paragraph (a), rounded up to the nearest dollar.
Discounting for leasehold land
Where the chargeable consent given in relation to a development or a subdivision of any land which is the subject of a State title that is none of the following:
a grant in fee simple;
a grant of an estate in perpetuity;
a State lease the tenure of which (or balance thereof) is more than 99 years when the chargeable consent is given,the amount of land betterment charge payable under the Act in respect of the chargeable consent is ascertained by —
first, working out the amount of land betterment charge according to Division 1 or 2 as if the land were the subject of a State title mentioned in sub‑paragraph (a), (b) or (c);
then, ascertaining the percentage specified in the Seventh Schedule corresponding to the tenure in whole years (or a balance thereof) of the land when the chargeable consent is given; and
finally, calculating the sum that is the percentage ascertained under sub‑paragraph (e) of the amount worked out under sub‑paragraph (d), rounded up to the nearest dollar.
For the purposes of paragraph (1)(e), where the tenure (or a balance thereof) of the land consists of any part of a year, the tenure must be rounded to the nearest year.
No double discounting
Where any chargeable consent given in relation to a development or a subdivision of any land is a temporary written permission, and the land is the subject of a State title that is none of those mentioned in regulation 15(1)(a), (b) and (c), the amount of land betterment charge payable under the Act in respect of the chargeable consent is ascertained by the steps in regulation 14(a), (b) and (c) only.
Part 4
Application of Part
This Part applies only to —
a development or a subdivision of any land mentioned in section 9(2) of the Act in relation to which a chargeable consent is given;
any other development in relation to which a chargeable consent is given and an election under section 9(3)(a) of the Act is made by all taxable persons concerned; or
a development or a subdivision of any land in relation to which a chargeable consent is given where the Table of Rates method is inapplicable to the particular development.
Election to use Valuation method instead of Table of Rates method
For the purpose of section 9(4) of the Act, an election under section 9(3)(a) of the Act for the Valuation method to be so used, in lieu of the Table of Rates method, to ascertain the amount of the land betterment charge in respect of any chargeable consent given in relation to a development or a subdivision of any land (except that mentioned in section 8(2) of the Act) must be made —
no later than the 7th day after the date the chargeable consent is given; and
in the form set out in https://www.sla.gov.sg/state-land-n-property/land-sales-and-lease-management/lease-management.
Part 5
Requirements for determination of land betterment charge
For the purposes of determining the land betterment charge using the Table of Rates method or the Valuation method, the Authority may require an applicant to submit —
a detailed calculation, based on such Method and requirements as the Authority may specify, of the floor area which is C in the formula specified in regulation 5; and
any plans, documents and other information, together with any evidence in support of the information, that the Authority may specify.
Use groups
FIRST SCHEDULERegulations 2 and 11Use groupsFirst columnSecond columnUse GroupDescription of purposes1.AShop, office, association office, cinema, place of entertainment, clinic, medical suite, restaurant, petrol station, auto‑service centre, commercial garage, market, sports and recreation building2.B1Residential (landed dwelling-house)3.B2Residential (non-landed residential building)4.CHospital, hotel room and hotel-related use5.DIndustrial, warehousing, science park, business park, transport depot, airport, dock, port uses, utility installation, telecommunication infrastructure, Mass Rapid Transit Station, Light Rail Transit Station6.EPlace of worship, community building, community sports and fitness building, educational and institutional uses, government building7.FOpen space, nature reserve8.GAgriculture9.HDrain, road, railway, cemetery, Mass Rapid Transit Route, Light Rail Transit Route
Table of rates per square metre and plans
SECOND SCHEDULERegulations 2, 5, 6, 8, 11 and 12Table of rates per square metre and plansPart 1TABLE OF RATES PER SQUARE METREGeographical SectorsUse GroupsAB1B2CDEFGH1$15,400$5,600$11,340$13,720$896$1,022$10-$12$15,400$5,600$11,340$13,720$896$1,022$10-$13$15,400$5,600$11,340$18,270$896$1,022$10-$14$15,400$5,600$11,340$16,240$896$1,022$10-$15$15,400$5,600$11,340$18,270$896$1,022$10-$16$15,400$5,600$11,340$18,270$896$1,022$10-$17$13,650$5,600$11,340$14,420$896$1,022$10-$18$12,880$5,600$11,340$13,020$896$1,022$10-$19$13,650$5,600$11,340$13,020$896$1,022$10-$110$12,880$5,600$11,340$13,020$896$1,022$10-$111$15,750$5,600$11,340$14,840$896$1,022$10-$112$15,750$5,600$11,340$18,270$896$1,022$10-$113$10,850$5,600$11,340$12,670$896$1,022$10-$114$10,850$5,600$11,340$12,670$896$1,022$10-$115$13,650$5,600$11,340$12,670$896$1,022$10-$116$13,650$5,600$11,340$14,000$896$1,022$10-$117$12,600$5,600$11,340$12,670$896$1,022$10-$118$12,600$5,600$11,340$12,670$896$1,022$10-$119$12,600$5,600$11,970$15,540$1,001$1,022$10-$120$12,600$5,600$11,410$15,540$1,001$1,022$10-$121$13,650$5,600$11,410$14,000$1,001$1,022$10-$122$8,400$5,600$11,410$12,950$896$1,022$10-$123$12,600$5,600$12,950$15,540$896$1,022$10-$124$10,500$5,600$9,590$12,950$896$1,022$10-$125$9,800$4,970$9,590$12,950$896$1,022$10-$126$10,150$4,970$9,590$12,950$896$1,022$10-$127$10,150$4,970$9,590$12,950$896$1,022$10-$128$9,800$4,970$8,820$12,950$896$1,022$10-$129$9,800$4,970$8,820$12,950$896$1,022$10-$130$9,800$4,970$8,820$12,950$896$1,022$10-$131$10,850$4,970$8,820$12,950$896$1,022$10-$132$10,850$4,970$8,820$12,950$896$1,022$10-$133$9,100$4,970$9,590$12,950$896$1,022$10-$134$8,400$7,700$10,430$12,950$896$1,022$10-$135$8,400$7,700$11,410$12,950$896$1,022$10-$136$7,560$7,700$12,460$12,950$896$1,022$10-$137$10,150$7,700$13,580$12,950$896$1,022$10-$138$9,100$13,440$12,950$12,950$896$1,022$10-$139$9,100$17,360$13,720$16,240$896$1,022$10-$140$10,850$13,440$13,720$16,240$896$1,022$10-$141$16,800$8,750$13,720$19,110$896$1,022$10-$142$17,850$13,440$13,720$19,110$896$1,022$10-$143$14,000$13,440$14,700$18,270$896$1,022$10-$144$9,450$17,360$13,720$15,540$896$1,022$10-$145$9,450$13,440$13,720$15,540$896$1,022$10-$146$9,450$10,780$12,040$12,320$896$1,022$10-$147$9,450$11,480$12,040$12,320$896$1,022$10-$148$8,400$10,780$12,040$12,320$1,001$1,022$10-$149$8,120$4,970$9,590$9,590$1,001$1,022$10-$150$8,120$4,970$11,410$9,590$896$1,022$10-$151$10,150$5,180$10,430$11,200$1,680$1,022$10-$152$7,350$5,110$10,360$8,960$1,680$1,022$10-$153$10,150$5,180$10,010$11,690$1,680$1,022$10-$154$7,280$5,110$7,700$6,860$2,058$1,022$10-$155$7,280$5,110$7,700$6,860$1,680$1,022$10-$156$7,280$5,110$7,700$6,860$2,058$1,022$10-$157$7,280$5,320$9,730$6,860$1,680$1,022$10-$158$10,150$6,930$10,360$11,200$1,680$1,022$10-$159$9,450$6,930$10,010$12,320$1,680$1,022$10-$160$12,600$6,930$11,410$12,950$896$1,022$10-$161$10,850$9,240$11,410$12,950$896$1,022$10-$162$10,850$13,440$12,600$12,950$896$1,022$10-$163$8,120$11,480$11,410$10,850$896$1,022$10-$164$6,580$11,480$8,260$8,960$896$1,022$10-$165$7,350$13,440$11,130$9,590$896$1,022$10-$166$7,700$17,850$12,950$12,950$861$1,022$10-$167$10,850$20,650$13,720$16,170$896$1,022$10-$168$7,700$16,520$12,460$10,850$861$1,022$10-$169$7,700$16,520$12,460$10,850$861$1,022$10-$170$9,450$17,850$13,580$12,950$1,001$1,022$10-$171$8,330$9,240$11,410$12,950$1,001$1,022$10-$172$7,350$6,160$10,010$8,190$2,282$1,022$10-$173$7,350$5,180$9,730$8,190$2,359$1,022$10-$174$7,350$5,180$9,870$8,960$2,359$1,022$10-$175$7,350$5,180$9,730$8,190$2,359$1,022$10-$176$8,120$5,320$11,200$8,190$1,323$1,022$10-$177$7,350$5,320$7,700$8,190$2,359$1,022$10-$178$7,350$5,320$9,870$8,190$2,359$1,022$10-$179$7,350$5,180$9,730$8,190$2,359$1,022$10-$180$11,200$5,320$9,870$8,190$2,359$1,022$10-$181$7,350$5,180$9,730$8,190$2,359$1,022$10-$182$7,350$5,320$9,870$8,190$2,359$1,022$10-$183$7,350$5,320$9,870$8,190$2,359$1,022$10-$184$7,350$5,180$9,730$8,190$2,359$1,022$10-$185$7,350$5,320$9,870$8,190$2,359$1,022$10-$186$7,350$5,320$9,730$8,190$2,359$1,022$10-$187$7,350$5,180$9,730$8,190$2,359$1,022$10-$188$12,600$7,000$10,850$12,950$2,359$1,022$10-$189$7,350$4,970$9,380$8,190$917$1,022$10-$190$7,350$4,970$9,380$8,190$917$1,022$10-$191$7,350$11,480$11,340$6,580$917$1,022$10-$192$7,350$8,400$10,220$9,590$917$812$10-$193$9,800$8,400$8,470$11,200$917$812$10-$194$11,200$8,400$11,340$11,200$917$812$10-$195$7,350$8,750$9,730$6,580$917$812$10-$196$7,350$7,980$10,780$6,580$917$812$10$34$197$7,350$8,750$9,450$6,580$861$812$10$34$198$11,200$7,420$7,700$6,580$1,890$812$10$34$199$7,490$6,090$7,350$6,580$1,141$812$10$34$1100$11,200$6,090$7,560$5,460$861$812$10$34$1101$10,850$7,000$9,450$6,580$2,737$812$10$34$1102$7,700$5,320$7,560$9,590$2,737$812$10$34$1103$11,200$7,980$10,500$6,580$2,737$812$10$34$1104$11,200$8,610$10,500$5,600$2,282$812$10$34$1105$11,200$6,720$7,560$5,600$2,100$812$10$34$1106$9,730$4,970$7,350$5,460$861$812$10$34$1107$8,400$7,210$8,330$5,600$1,890$812$10$34$1108$9,450$15,610$11,130$8,190$1,680$812$10$34$1109$8,120$12,810$11,130$8,190$1,001$812$10$34$1110$11,900$11,130$10,500$8,190$1,001$812$10$34$1111$11,200$7,000$9,380$8,540$2,758$812$10$34$1112$11,200$7,000$8,820$8,190$1,323$812$10$34$1113$11,200$7,000$8,470$5,600$987$812$10$34$1114$11,200$4,970$7,350$5,460$833$812$10$34$1115$11,200$4,970$7,350$5,460$973$812$10$34$1116$1,036$1,050$1,085$945$525$427$10$34$1117$9,450$13,160$12,110$16,590$427$427$10$34$1118$1,036$1,050$1,085$945$427$427$10$34$1[S 87/2026 wef 01/03/2026]Part 2PLANS
Fixed rates and plans for residential developments
THIRD SCHEDULERegulation 8Fixed rates and plans for residential developmentsPart 1TABLE OF fixed RATES PER SQUARE METREGeographical SectorsUse Groups AB1B21$13,417$4,060$11,5502$13,417$4,060$11,5503$13,417$4,060$11,5504$13,417$4,060$11,5505$13,417$4,060$11,5506$13,417$4,060$11,5507$11,760$4,060$11,5508$11,200$4,060$11,5509$11,900$4,060$11,55010$11,200$4,060$11,55011$13,883$4,060$11,55012$13,883$4,060$11,55013$9,753$4,060$11,55014$9,753$4,060$11,55015$12,250$4,060$10,38316$12,250$4,060$10,43017$11,200$4,060$10,38318$11,200$4,060$10,38319$11,200$4,060$11,24720$11,200$4,060$9,80021$12,250$4,060$9,80022$7,513$4,060$9,80023$11,492$4,060$11,24724$9,753$4,060$7,98025$9,403$3,570$7,98026$9,753$3,570$7,98027$9,753$3,570$7,98028$9,403$3,570$7,04729$9,403$3,570$7,04730$9,403$3,570$7,04731$10,138$3,570$7,04732$10,138$3,570$7,04733$7,852$3,570$7,98034$7,513$5,063$9,50835$7,513$4,993$9,91736$6,813$4,993$10,96737$9,753$4,993$12,13338$7,852$8,353$12,13339$7,852$11,480$16,21740$10,325$8,353$14,81741$13,708$5,705$14,81742$14,408$8,528$16,21743$11,492$8,528$17,61744$7,852$11,480$16,21745$7,852$8,353$16,21746$7,852$6,802$12,53047$7,852$7,082$12,47248$7,513$6,802$12,13349$7,513$3,570$7,98050$7,513$3,570$9,67251$9,753$3,780$9,26352$6,813$3,710$9,17053$9,753$3,780$7,56054$6,230$3,710$6,05555$6,230$3,710$6,05556$6,230$3,710$6,05557$6,230$3,780$7,25758$9,753$4,608$7,86359$9,053$4,608$7,56060$11,725$4,445$9,80061$10,325$5,868$9,80062$10,325$8,353$11,24763$7,513$7,082$9,80064$5,460$7,152$7,04765$6,813$8,528$9,26366$6,813$11,480$12,13367$10,325$12,472$16,21768$6,813$10,453$10,96769$6,813$10,453$10,96770$7,852$11,480$12,76371$7,513$5,950$9,80072$6,813$4,340$7,86373$6,813$3,780$7,25774$6,813$3,780$7,56075$6,813$3,780$7,25776$7,513$3,920$9,54377$6,813$3,920$5,83378$6,813$3,920$7,56079$6,813$3,780$7,25780$10,325$3,920$7,56081$6,813$3,780$7,25782$6,813$3,920$7,56083$6,813$3,920$7,56084$6,813$3,780$7,25785$6,813$3,920$7,56086$6,813$3,920$7,25787$6,813$3,780$7,25788$11,725$4,993$10,78089$6,813$3,570$6,90790$6,813$3,570$6,90791$6,533$7,408$9,25292$6,813$5,868$7,77093$9,403$5,868$7,11794$10,325$5,868$9,25295$6,813$5,868$7,63096$6,813$5,775$7,38597$6,533$5,775$6,00898$10,325$4,865$6,00899$6,230$4,165$5,168100$10,325$4,165$5,647101$10,325$4,993$7,315102$6,813$3,780$5,425103$10,325$5,670$7,618104$10,325$5,670$7,350105$10,325$4,865$5,647106$8,517$3,570$5,168107$7,513$5,052$7,070108$8,517$11,013$10,967109$7,513$8,353$9,263110$11,025$6,802$9,263111$9,753$4,993$7,863112$10,325$4,993$6,393113$9,753$4,900$6,183114$9,753$3,570$5,168115$9,753$3,570$5,168116$980$916$980117$8,517$10,127$11,713118$980$916$980Part 2PLANS
Multiple purposes
FOURTH SCHEDULERegulation 11(3)(b)Multiple purposesPart 1First columnSecond columnPurpose for which land is zoned in Master PlanFormula to determine B2 for the purpose of regulation 6(3)Business Park0.15 × K1 + 0.85 × K2Business Park – White(with the notation “BP – W[X]”, where X is a number as specified in the notation for the land) Business 1-White(with the notation “Y[B – Z] W”, where Y and Z are numbers as specified in the notation for the land) Business 2-White (with the notation “Y[B – Z] W”, where Y and Z are numbers as specified in the notation for the land) Commercial and Residential 0.4 × K3 + 0.6 × K4Residential with Commercial at First Storey 0.2 × K3 + 0.8 × K4Hotel 0.4 × K3 + 0.6 × K5WhiteK1Part 2For the purpose of the formula in the second column of the table in Part 1 of this Schedule —
where the purposes for which the land or any building on or to be erected on the land is intended to be developed include one type of White use, K1 is the rate corresponding to both the appropriate geographical sector of the land and the Use Group within which the type of White use falls;
where the purposes for which the land or any building on or to be erected on the land is intended to be developed include 2 or more types of White uses, K1 is the average of the rates, each corresponding to both the appropriate geographical sector of the land and the Use Group within which one of those types of White uses fall;
K2 is the rate corresponding to both the appropriate geographical sector of the land and Use Group D;
K3 is the rate corresponding to both the appropriate geographical sector of the land and Use Group A;
K4 is the rate corresponding to both the appropriate geographical sector of the land and Use Group B2; and
K5 is the rate corresponding to both the appropriate geographical sector of the land and Use Group C.
Hotel developments disregarded for pre-chargeable valuation
FIFTH SCHEDULERegulation 13Hotel developments disregarded for pre-chargeable valuationPart 1First columnSecond columnAddressMap in Part 21.36 Newton RoadS12.22 Orange Grove RoadS23.1 Tanglin RoadS34.581 Orchard RoadS45.10 Claymore RoadS56.25 Scotts RoadS67.10 Scotts RoadS78.21 Mount ElizabethS89.22 Scotts RoadS910.333 Orchard RoadS1011.277 Orchard/Somerset RoadS1112.22 Cavenagh/Orchard RoadS1213.15 Kramat RoadS1314.47 Bencoolen StreetS1415.101 Victoria StreetS1516.41 Seah StreetS1617.3 Coleman StreetS17Part 2
discounting for temporary written permission
SIXTH SCHEDULERegulation 14(b)discounting for temporary written permissionFirst columnSecond columnPeriod of validity of temporary permissionPercentage1.One month0.3%2.2 months0.6%3.3 months1.0%4.4 months1.3%5.5 months1.6%6.6 months1.9%7.7 months2.2%8.8 months2.5%9.9 months2.9%10.10 months3.2%11.11 months3.5%12.One year3.8%13.2 years7.5%14.3 years10.9%15.4 years14.1%16.5 years17.1%17.6 years19.9%18.7 years22.7%19.8 years25.2%20.9 years27.7%21.10 years30.0%[S 758/2022 wef 23/09/2022]
discounting for leasehold land
SEVENTH SCHEDULERegulation 15(1)(e)discounting for leasehold landFirst columnSecond columnTenure in yearsPercentage of freehold value1.One year3.8%2.2 years7.5%3.3 years10.9%4.4 years14.1%5.5 years17.1%6.6 years19.9%7.7 years22.7%8.8 years25.2%9.9 years27.7%10.10 years30.0%11.11 years32.2%12.12 years34.3%13.13 years36.3%14.14 years38.2%15.15 years40.0%16.16 years41.8%17.17 years43.4%18.18 years45.0%19.19 years46.6%20.20 years48.0%21.21 years49.5%22.22 years50.8%23.23 years52.1%24.24 years53.4%25.25 years54.6%26.26 years55.8%27.27 years56.9%28.28 years58.0%29.29 years59.0%30.30 years60.0%31.31 years61.0%32.32 years61.9%33.33 years62.8%34.34 years63.7%35.35 years64.6%36.36 years65.4%37.37 years66.2%38.38 years67.0%39.39 years67.7%40.40 years68.5%41.41 years69.2%42.42 years69.8%43.43 years70.5%44.44 years71.2%45.45 years71.8%46.46 years72.4%47.47 years73.0%48.48 years73.6%49.49 years74.1%50.50 years74.7%51.51 years75.2%52.52 years75.7%53.53 years76.2%54.54 years76.7%55.55 years77.3%56.56 years77.9%57.57 years78.5%58.58 years79.0%59.59 years79.5%60.60 years80.0%61.61 years80.6%62.62 years81.2%63.63 years81.8%64.64 years82.4%65.65 years83.0%66.66 years83.6%67.67 years84.2%68.68 years84.5%69.69 years85.4%70.70 years86.0%71.71 years86.5%72.72 years87.0%73.73 years87.5%74.74 years88.0%75.75 years88.5%76.76 years89.0%77.77 years89.5%78.78 years90.0%79.79 years90.5%80.80 years91.0%81.81 years91.4%82.82 years91.8%83.83 years92.2%84.84 years92.6%85.85 years92.9%86.86 years93.3%87.87 years93.6%88.88 years94.0%89.89 years94.3%90.90 years94.6%91.91 years94.8%92.92 years95.0%93.93 years95.2%94.94 years95.4%95.95 years95.6%96.96 years95.7%97.97 years95.8%98.98 years95.9%99.99 years96.0%