Regulation 3
Regulation 3
Plan of sand or granite quarry
Subregulation 1
Every application submitted under regulation 2 shall be signed by the applicant and shall be accompanied by 3 copies of a plan containing the following particulars:
a comprehensive topographical survey of the land on which it is proposed to operate the sand or granite quarry, showing all salient features of the land and the extent of the proposed sand or granite quarry;
the siting of pumps, crusher plant or other mechanical apparatus for the sand washing or quarry operation;
the siting of silting ponds to be used as silt traps and the type and mode of drainage from such silting ponds to any existing stream, canal or drain; and
such other particulars as the Licensing Officer may require.
Subregulation 2
The plan referred to in paragraph (1) shall indicate, in the case of a sand quarry, that provision has been made for at least 2 silting ponds to be used as silt traps of a size consistent, in the opinion of the Licensing Officer, with the capacity of the pumps or other mechanical apparatus to be used.
Subregulation 3
A copy of the plan when approved by the Licensing Officer shall be returned to the licensee.