Singapore legislation
Regulation 67
of Workplace Safety and Health (Shipbuilding and Ship-Repairing) Regulations 2008
Regulation 67
Capacity chart
Subregulation 1
It shall be the duty of the owner of any crane used in a shipyard or on board a ship in a harbour to comply with paragraphs (2), (3) and (4).
Subregulation 2
Where the capacity of the crane is variable, a capacity chart shall be provided.
Subregulation 3
The capacity chart shall —
be posted and maintained in the crane which is clearly visible to the operator;
set out the safe loads for various lengths of jib at various angles and radial distances; and
be prepared and certified by an authorised examiner, unless it is furnished by the manufacturer or builder of the crane.
Subregulation 4
Where outriggers are provided, the safe loads with and without the use of outriggers shall be specified in the capacity chart.