Singapore legislation

Regulation 5

of Air Navigation (137 — Aerial Work) Regulations 2018

Regulation 5

Application for, or to renew, aerial work certificate

Amended byS 215/2020 wef 01/04/2020

Subregulation 1

A person applying for an aerial work certificate (called in these Regulations an applicant) must —

(a)

provide the Authority with the particulars, information and documents specified in paragraph (2); and

(b)

pay to the Authority a non‑refundable application fee, if specified in the Second Schedule.

Subregulation 2

The particulars, information and documents required for an application mentioned in paragraph (1) are —

(a)

the name of the applicant;

(b)

the address of the applicant in Singapore;

(c)

the type of intended aerial work operations, including details such as the aircraft type involved;

(d)

the applicant’s —

(i)

Operations Manual;

(ii)

Maintenance Control Manual;

(iii)

aircraft flight manual and aircraft performance data; and

(iv)

documents describing its Safety Management System; and

(e)

any other manuals, documents or further particulars relating to the applicant as may be required by the Authority to decide the application.

Subregulation 3

Amended byS 215/2020 wef 01/04/2020

The Operations Manual and Maintenance Control Manual must comply with the requirements of these Regulations and are subject to the approval of the Director-General of Civil Aviation.

Subregulation 4

The application mentioned in paragraph (1) must be made to the Authority at least 90 days before the intended date of commencement of the applicant’s aerial work operations (or such shorter period as the Authority may specify in any particular case).

Subregulation 5

The holder of an aerial work certificate (called in these Regulations an AWC holder) applying to renew the aerial work certificate must —

(a)

provide the Authority with the particulars, information and documents mentioned in paragraph (2) that differ from the AWC holder’s existing aerial work certificate; and

(b)

make the application to the Authority at least 30 days before the date of expiry of the existing aerial work certificate.