Building Control Act 1989 · 2020 Revised Edition · Part 3B · Environmental Sustainability Measures for Existing Buildings
22FL. Obligations of owner of Type 1 building subject to MEI audit notice
Last amended by an amending law of 2024.
Official textFrom Singapore Statutes Online, unchanged
An owner of a Type 1 building that is subject to an MEI audit notice must do all of the following:
Type 1 building
“Type 1 building” means an existing building, or part of an existing building, of any class or type for the time being prescribed for the purposes of Divisions 2, 3 and 4;
appoint a specified individual to carry out an energy audit, in accordance with sections 22FM and 22FN;
submit an audit report of the energy audit carried out and an energy efficiency improvement plan, in accordance with section 22FO;
ensure that the energy efficiency improvement plan is carried out, in accordance with section 22FQ;
ensure that the specified reduction or approved reduction in energy use intensity is maintained for the maintenance period, in accordance with section 22FT.
In this Division and Division 4, a reference to an owner of a Type 1 building that is subject to an MEI audit notice —
MEI audit notice
“mandatory energy improvement audit notice” or “MEI audit notice” means a mandatory energy improvement audit notice issued under section 22FJ(1);
means the current owner of the Type 1 building; and
includes a reference to a person who becomes the owner of that building after that notice is issued.
If the owner of a Type 1 building that is subject to an MEI audit notice ceases to be the owner of the building before the expiry of the maintenance period mentioned in section 22FT(2)(a), the owner must notify the Commissioner of Building Control of that fact not later than 7 days after the owner ceases to be the owner of the building.
building
“building” means any permanent or temporary building or structure and includes —(a)a hut, shed or roofed enclosure;(b)an earth retaining or stabilising structure, whether permanent or temporary;(c)a dock, wharf or jetty;(ca)a floating structure, not being a boat or vessel, constructed or to be constructed on a flotation system that —(i)is or is to be supported by water;(ii)is not intended for or useable in navigation; and(iii)is or is to be permanently moored;(d)a culvert, crossing, bridge, underpass or tunnel;(da)a fixed installation;(e)a sewage treatment plant, sewer, drain, swimming pool or any non‑proprietary type of concrete tank for the storage of any solid, liquid or gaseous product;(f)a shelter provided under the Civil Defence Shelter Act 1997; and(g)such other erection or structure (whether permanent or temporary) as the Minister may, by order in the Gazette, declare to be a building;
An owner of a Type 1 building who, without reasonable excuse, contravenes subsection (3) shall be guilty of an offence and shall be liable on conviction to a fine not exceeding $10,000.
Terms defined in this Act
approved reduction
Defined · s 22FA“approved reduction”, in relation to the energy use intensity of a building, means a reduction in the energy use intensity of the building by a percentage approved by the Commissioner of Building Control under section 22FO(3) for that building;
audit report
Defined · s 22FA“audit report” means a report of the result of an energy audit mentioned in section 22FN(1)(d);
building
Defined · s 2“building” means any permanent or temporary building or structure and includes —(a)a hut, shed or roofed enclosure;(b)an earth retaining or stabilising structure, whether permanent or temporary;(c)a dock, wharf or jetty;(ca)a floating structure, not being a boat or vessel, constructed or to be constructed on a flotation system that —(i)is or is to be supported by water;(ii)is not intended for or useable in navigation; and(iii)is or is to be permanently moored;(d)a culvert, crossing, bridge, underpass or tunnel;(da)a fixed installation;(e)a sewage treatment plant, sewer, drain, swimming pool or any non‑proprietary type of concrete tank for the storage of any solid, liquid or gaseous product;(f)a shelter provided under the Civil Defence Shelter Act 1997; and(g)such other erection or structure (whether permanent or temporary) as the Minister may, by order in the Gazette, declare to be a building;
Commissioner of Building Control
Defined · s 2“Commissioner of Building Control”, in relation to this Act or any Part or provision of this Act, means any Commissioner of Building Control appointed under section 3(1) to be responsible for the operation of this Act or that Part or provision, as the case may be;
energy efficiency improvement plan
Defined · s 22FA“energy efficiency improvement plan” means an energy efficiency improvement plan prepared under section 22FN(1)(c), and includes any energy efficiency improvement plan amended in accordance with section 22FO(4) or 22FS(1);
energy use intensity
Defined · s 22FA“energy use intensity”, in relation to a building, means the annual energy consumption of the building per unit of gross floor area (expressed in kilowatt hour (kWh) per square metre per year), calculated using the prescribed methodology;
MEI audit notice
Defined · s 22FA“mandatory energy improvement audit notice” or “MEI audit notice” means a mandatory energy improvement audit notice issued under section 22FJ(1);
specified reduction
Defined · s 22FA“specified reduction”, in relation to the energy use intensity of a building, means a reduction in the energy use intensity of the building by a prescribed percentage;
Type 1 building
Defined · s 22FA“Type 1 building” means an existing building, or part of an existing building, of any class or type for the time being prescribed for the purposes of Divisions 2, 3 and 4;
Spot a mistake in this text? Suggest a correction.
Part 4
Dangerous Buildings and Occurrences
Part 4A
Maintenance of Buildings
Part 5
Inspection of Buildings and Building Façades
Part 5A
Licensing of Builders
Part 5B
Regulating Fixed Installation Contractors
Part 6